[Music] hello everyone my name is Gerold Welcome to Studio Ploy [Music]
I'm always excited doing unit or house turnover Even if I've done it a lot of times I always
look forward to an experience And today is a bit different from the previous ones Hopefully
everything will go smoothly #nopunchlist Unlike any of our previous projects I had
been involved with this property from when it was purchased In fact I was the one who
suggested this specific unit since I'd been the family servicing broker from 2017 They'd been
very supportive of me even when I ventured into makeover projects with Studio Ploy
With the owner's busy schedule they would normally appoint me as their
spa or attorney In fact hence the reason I was also the one who accepted the unit
[Music] It's in a builder grade finish for this property or here we call it standard
finish with very basic features like painted walls and ceiling and a tiny kitchen Toilet
and bath are also delivered with the same basic features with provisions for shower
heater and washer and dryer within the bathroom The bedroom and living area both have provisions
for window type ACs and the entire unit were illuminated in basic incandescent
bulbs Unfortunately two of the floor tiles were not properly installed with minor defects So
I requested for it to be rectified immediately which the developer promised to fix as soon as
possible Property with Ayala They would normally provide one-year workmanship warranty start on
the day you accepted the unit but I would suggest checklist prior to the
turnover Months have passed We've been busy working on a couple of projects and also
we've been featured on Adventure Taste and Moments Online for our modern Japan project
in Pasig and a workshop invite from Powerhouse Tools I also got an SMS around this time from
the owner asking me to drop a proposal for the unit inclusive of some basic appliances which
got approved instantly on first draft Right after the holidays we immediately went back to work and
started working on this 37 m unit situated in one of the emerging business district in Metro Manila
It's a one-bedroom unit in standard finish and we are requested to keep the existing
layout focusing more on cosmetic upgrade without compromising on both aesthetic and functionality
with a specific ceiling for the budget Funny though I've known the owner for quite some time
but zero clue in his design preferences But because I wanted this project to reflects the
owner's lifestyle and personality I shoot him a message asking whether he prefers the mountains
or beaches which he responded instantly And for sure you guys already know the answer
based on our thumbnail The overall design style perfectly blends the minimalism of Scandinavian
style and the relaxing warm beach vibe of coastal design executed the studio play We are starting
off this makeover right into the heart of this unit the kitchen I am anticipating the kitchen
would be a little messy with its unusual black backsplash So it's it was the first work item
that we focused on accomplishing With normally very limited stocks we went straight to Home
Depot to purchase the tiles and some painting essentials for the first phase of the makeover
I was
[Music] thinking I went for the brick work square pattern instead of the default grid pattern of the
mosaic tiles because of the simple reason that we are not going to be extending the existing
kitchen and I wanted for it to look wider A grid pattern will generally look wider than
a brick work pattern as it utilizes squares or rectangles laid side by side without any offset
But on this specific kitchen and its scale I would need the brick work pattern staggered
or offset pattern for it to appear whether hence my decision to ultimately go for the
brick work I started preparing the surface by creating punctures through the prefab wall for
that added adhesive strength I would then cover it with mesh tape before applying a
layer of the adhesive For our backsplash to look really polished I would always install
tile trim to protect the tile edges from damages and for it to terminate with our
painted wall neatly I prefer using this twoin-one tile grout and adhesive for
its practicality and also am satisfied with its durability and antibacterial properties
[Applause]
I would initially cover the wall with a thin coat of about a millimeter or two of the adhesive
before installing the tiles I believe it's my sixth time to install a tile backsplash And I
was quite confident I'm going to do well but this black one is different Because I am using black
adhesive it makes for a more complicated install Aside from reconfiguring the [Music] pattern
making it perfectly level was a challenge So I have to slowly install and tediously placing
tile spacer between each tile to make sure everything is perfectly aligned Since it's in
a brick pattern I also have to cut an arm to the cross spacer creating a letter T and added work
to an already complicated install [Music] The next day I brought in the lacking tile trim and started
installing it on this side where the oven will be placed But sadly because I was not able to
install all the bottom portions of the backsplash in one go it had an effect to the install that
I started noticing something is a bit off But I continued with the installation anyway It became
more noticeable that with my discontent I started removing the tile on this part of the backsplash
We're taking a few minute break from our backsplash install as a Asra arrived to install
the shower enclosure I've also asked them to take the measurements of a huge column on the living
area that takes up over a square meter of living area space I wanted the column part facing the
kitchen fully covered with mirror to camouflage it and partially on the side facing the bedroom
My idea is to somehow create illusion of space instead of the very intrusive unsightly column
Going back I meticulously reinstalled that uneven portion and also those
complicated trims until I was able to get that professionally done [Music]
install the same cal grout and adhesive We applied a decent amount of it to the grout
joints then waited for around 30 minutes to an hour before removing the excess grout with
sponge We had to use our phone flashlight to check if the joints were properly filled or
if there is still some excess [Music] Then we let the grout dry for 48 hours before applying
the sealer to protect tiles from damage and staining It will also create a waterresistant
layer preventing dirt and liquids from penetrating the porous material [Music]
Moving to the bedroom headboard wall I thought of incorporating a full floor to ceiling fluted
paneling primarily to provide texture and visual interest to the room Coastal styles often favor
textures and materials that evoke the beach like wood shiplap but instead I thought of
going for something more modern but still evokes that warm beach vibe It's actually inspired by
this bamboo fence I normally see in most of our provincial beaches and went for this light ash
wood finish in half round paneling to cover this wall I had this pre-cut to a certain length with
a little excess for adjustment and for it to also fit with the elevator Almost all of the
bedroom walls were already repainted excluding the part where we are covering with panelings
This is going to be an easy install and we are going to be using construction grade adhesive to
attach the pluted panels to the wall Normally if the wall is too high it is recommended to
also install a mounting clip to each panel or alternately But for this one adhesive would be
strong enough to hold the panelings We started from the leftmost part of the wall after the
column and I had to do some adjusting to the first panel so it would have a more precise clearance
with the column since the column plastering is not perfectly leveled And also this is important
to be vertically aligned as it would set the entire install And since we're not going to be
using clippings a good amount of adhesive is needed to perfectly secure its adhesion then
carefully pressing it with the rubber mallet to evenly distribute it for a more stronger bond If
you notice here I have to be very careful in cutting off the excess Over cutting it would
make it shorter and would create clearance That means additional panels I would remove a small
portion of about a millimeter then actually fit it before doing another adjust so it would fit
perfectly flush to the wall and almost negligible clearance on both the floor and the beam before
applying the adhesive to attach it and always double-checking every panel to install as the
floor to beam height varying heights After getting the hang of it we were able to install much faster
while carefully checking its vertical alignment every two panels installed This is the only thing
that makes this install a bit complicated because we have to carefully cut it in the right place as
we always aim for that professional finish and again making the hole slightly off would
waste another panel After this we were able to install the rest of the panelings just in
time before the allotted time to do noisy works We actually managed to finish this in one day
[Music]
It was I believe few days after that Elsa was able to seal very minor gaps on both
the top and the bottom portions of the panelings for that finishing touchup
[Music]
[Music]
It wouldn't be a studio ploy project if we're not incorporating unplanned elements that would
elevate the space or sometime would take the tone and make the space look more interesting
The initial plan for this adjacent walls was to create a combination of board and batten
and fluted elements to the lower one-third of the wall similar to what we did in our modern organic
project But the inside part will be covered by the same material we used for the bedroom wall
Though there is continuity when it comes to the material it rendered a not so pleasing result
when we did the first mockup I find it a little distracting and I don't think it fits the owner's
personality I came up with a decision to instead do a board and pattern from floor to ceiling for
a more traditional look and would make the wall interesting without clashing with the
other elements The wall should be the perfect backdrop for the kitchen and dining and living
area Since we have an open layout I also took into consideration the shape of the space I wanted to
add more height Hence the full floor to ceiling height I wanted a custom board and batten pattern
for the space So instead of the usual equally spaced one I thought of doing something that would
also reflects the owner's lifestyle Then I decided on applying the design first to this narrow
portion of the bedroom wall to assess and adjust before doing it to the whole of the adjacent wall
The inspiration for the pattern is from a sports brand stripes in relation to the owners being an
athlete It would be a no-nail install and would only use construction grade adhesive to attach
it to the wall Our batters will be placed in a one to one configuration The middle part will
will have a gap of 2 cm except for this corner portion where we cover it with batton side by side
We were in the middle of our install when Aibar arrived for the additional item I requested which
is to cover this humongous column on the living area with a floor floor to ceiling
height mirror This was an additional element without any additional cost to the [Music]
owner Back to our board and batton wall We continued with our mock up Around this time
we were already installing the middle part of the pattern It should be equally spaced from both ends
and the gap should fall right at the middle of the two battins We needed our line level laser
for that vertically aligned install Our initial pattern looked really good and fits the space
So I decided to apply to the rest of the wall It has this familiar but somehow different vibe to it
It's sort of a younger version of a classic piece but still retains its traditional charm
if you know what I mean I was so excited that I was just supposed to finish the mockup and do
the rest of the wall the next day that I went on installing almost a third of the adjacent
wall The following day I proceeded installing and finishing the rest of our main focal wall
on this side Since it'll be a combination of four sets of one to one configuration it
will appear to have two stripes together on every 50 cm average interval [Music]
We needed for the adhesive to completely dry Then few days after the next step
was supposedly be just plain cocking of some gaps but we needed to do more because of the
material that we used for the battens Plain 1x 2 plank was supposed to be my choice of
material but unfortunately it wasn't available back then What we got is a colonial baseboard
We installed it on reverse to hide one side with a cap and apply potty as you actually
see me doing to cover the side pattern or cap and make it on a 90° angle Doing this actually
serves two purpose Cover the cap and add more durability to our board and batten wall [Music]
We are already halfway on our timeline and some of the furniture and light fixtures
that we ordered are already starting to arrive [Music]
2 days after we proceeded sanding our board and batten wall to prepare
it for painting We now need to move faster with the first phase
before everything else gets delivered and it would be hard for us to move
around Last work item for the first phase is to finally paint the main wall the same color we
painted early on with the rest of the walls and ceiling I had two initial choices for the paint
One with a much cooler tone with sweet thing and a bit warmer option with mystique I decided to go
for a much cooler tone this time as I'll be adding a lot of warm elements to have a bit of [Music]
contrast Moving to the installation phase We were looking at installing the bed frame first
But since this pendant light falls directly to the center of the bed I have to install this
first so it would be easier for us and we won't be damaging the frame I wanted to have a more
diffused soft lighting to the bedroom Hence the decision to go for this type of lighting
[Music] Noticing the frame would instantly take 40% of the bedroom space I decided to
install the wardrobe first Since this would be flush to the wall anyway I went for this
Pax BSB twodoor wardrobe in white so it would perfectly blend with our white walls
This would also complement with the rest of the furniture in the bedroom [Music]
If you guys are following me on IG I score this marble knobs from H&M Home when they were
on [Music] sale Things are getting more exciting Aside from we're getting closer to finishing this
We are going to start with two new projects a studio in Mandaluong and a two-bedroom in
Pasig City Unfortunately when I got home that night I felt really weak and feverish that my
temperature showed up to 39.5° around midnight and we were not able to go back to work in the
next 8 days when we're supposed to finish this project in 2 weeks time Here you [Music] go On
the ninth day and still recovering I decided that we resume working on the unit to finish
the remaining work With only 3 days remaining before the original turnover date I don't think
we would be able to deliver So I asked for a twoe extension We started assembling the bed
frame right away though slowly as I don't want to overwork [Music] myself I saw this bed frame
when I was checking on the dining chairs that I saw online and visited their physical store in
Alabang What caught my attention right away is the headboard with a shelf design which is the
same tone as our fluted paneling And what made me decide for this is its price that is just right
within the budget ceiling For our bed frame the owner's only requirement is to have it in
[Music] queen Next furniture that we assemble is this Billy Oxburg with glass doors from IKEA
I went for the black oak option to complement with our kitchen's black backsplash The idea is to have
a versatile shelving space The upper portion lets you display some collectible items and
the bottom half lets you hide unsightly stops Its shallow design makes it a perfect choice enough
to fill in that empty but narrow space without eating too much of the kitchen and dining area
#
the struggles real for our light fixtures and it would stand as a separate content if I was
able to document everything Lighting is very important when it comes to the overall design
A change of a very important fixtures In this case the drop lightings for the dining would
have a domino effect to the overall look that I envisioned for this [Music] space My initial
proposed lighting is this pendant light but unfortunately when the proposal was approved
it was already sold out It took me weeks before I finally found a replacement Found this really
nice pendant and with its size I only need two I went to the store right away and purchased it and
lucky enough they still have one in stock and one on display which is perfect as we need two
I paid for it together with the other fixture and was advised that it will be available for
pickup the following day but I decided to pick it up on a Monday which is 3 days after Come Monday
I was already on my way to pick up the fixtures I receive an SMS that one of the pendant that I
already paid with receipt was already sold to a different client and was offered to wait for
the replenishment which will be available in the next 6 months which I instantly declined
No way can we wait for that long because we are less than 2 weeks away from the reveal
I was so frustrated I actually don't know what to replace it with because of two concerns style
and budget While I was reviewing the mood board for the project I saw this linear pendant and
thought of going something the same Fortunately there is an available 85 cm black arriving in the
next 2 days in one of the home furnishing store It was a blessing because it's the same supplier
with my flash mount and they offer free install which I could not do at the moment as I am still
recovering Down to our last furniture installation is this floating vanity This will also serve as a
nightstand since we don't have enough space for a different set of nightstand [Music]
We are adding in a round mirror in wooden finish to complement with our paneling [Music]
With only less than a week to reveal we have to purchase all of the remaining stuffs for
styling and our window treatments I got a little help from our little apprentice this
timeal She was also saying she prefers white for our curtains We are doing sheer for the
living while a combination with sheer and semi black art for the bedroom [Music]
[Music]
Mr [Music]
Jingo Mr Jingo Yes Everyone will get P [Music]
My flowers may line Okay Ang hold basket What else [Music] Flowers lines You want
[Music] to next day while I was checking on the clips I noticed that the bathroom
is so plain that I decided to create some sort of focal wall for the bathroom and
went on formulating cement finish with cement cement and excess white paint
that we use for the walls It was harder to mix than Davis Industria and dries
[Music] faster It came out silvery gray in color and lighter and perfectly matches our
overall design What's more surprising is accidentally I splashed a water to it and
turns out it's water resistant which means we don't need to apply additional top coat
We let it completely dry for 48 hours before we install back our shelving unit and mirror
[Music]
[Music]
We are almost all set for styling but a studio play makeover would
not be complete without our DIYs and artworks
I got this vase from a local supplier and it's painted in white I thought of making
it dark and rustic using acrylic paint It took me five coats more
or less before I was able to achieve that vintage looking vase [Music]
For our living room painting I initially thought of doing a modern abstract painting of a school
of fish but upon finishing it I don't like how it looked I wasn't able to achieve what
I wanted as the end result So I immediately cover it and instead we played it with the
same colors we used and created this random color of wave pattern which I totally love
She was suggesting to name it Bluey Then I add wave So we'll call it blue
wave And it's our little secret So don't tell anybody [Music] [Applause] [Music]
This maroon painting with gold is an homage to the owner's alma
matter And I thought of hanging this to the bedroom wall opposite to the panled wall
[Music] Again when everything seems to go as planned new challenges arises because this time
a lot of graduations are happening The alteration shops are awfully booked and the shortest time for
them to alter our curtains is 2 weeks which is beyond our schedule I remember I bought
a portable sewing machine way back online and I thought why not doing it myself It's going to be
my first time but I grew up with my nana Christine my grandmother who is really a good Sim stress So
I'm confident I'll be able to do it with flying colors I miss you Nana This is for you [Music]
First try was a success and was able to complete the shear for the living
Because it was already late I decided to install the curtains for the bedroom
the next day 2 days before the [Applause] [Music]
reveal This was also the time we started unboxing all the appliances [Music]
and still my favorite part of doing makeover is the styling This is when you bring in
together all those elements to create the desired look It looks easy but it's one
of the most complicated and tricky part and when executed perfectly it creates [Music]
magic [Music] Heat [Music]
Heat
[Music] Heat Heat
[Music]
3
[Music]
4 Heat up
[Music]
here [Music]
Heat Heat
[Music]
[Music]
The choice between mountains or beaches had been our point of reference in
creating this new space I hope you guys enjoy this humble coastal skate
[Music]
Hey hey [Music] hey Hey [Music]
hey hey [Music]
[Music]
Oh hey [Music]
[Music]
I want you
[Music]
It's a bit of a hurdle when you have been given the fullest trust and creative freedom to work on
a project without a particular design direction in mind and the only request was to provide the
basic furniture and appliances with certain budget While this is our second project from the same
client the goal of delivering a better output is our top priority as expectations were already set
after the first project we did Nonetheless this one appeared to be easy as I got to play on the
overall design direction for the project not to mention the inclusion of the ceiling for the
overall cost These factors together with the other matters we encountered resulted to this modern
coastalcape which our client happily accepted with a seal of approval It's always fun to work with
angel clients a rare opportunity these days from being their real estate broker to designing this
space The trust and confidence repost upon me is something we deeply cherish And to our valued and
kind subscribers I hope you guys appreciate our first content for 2025 our summer special which
we humbly pray to hit the 100K milestone know that we are forever grateful for your support and for
staying with us until this time Thank you guys so much for watching I'll see you in the next one
[Music]