http://www.koffeeone.com.au/coffee-machines/
pouring
group access to access the pouring group
just open the
door the service engineer needing to
intervene on the system will need a 10
mm socket wrench a two 2.5 and 3 mm
Allen key small and large Philips
screwdrivers two 17 mm wrenches 10 and
21 mm wrenches a pin extractor pliers
Teflon and
clamp the engineer will need to switch
off the machine remove the ground drawer
turn the key anticlockwise and then open
the front panel the pouring group is in
the
[Music]
middle pouring group
removal the engineer will have to remove
the Philips screw holding the motor
protection guard in place and then use a
10 mm socket wrench to loosen the right
hand
screw
next remove the motor cover and the
guard protecting the pouring group
plug remove the top piston taking off
the clip and sliding it out from
below remove the group wiring plug and
pouring
pipe this operation involves pressing
the metal ring and pulling the Teflon
pipe the technicians have to loosen the
top screw from the pouring group using a
2.5 mm alen key and to remove the bottom
one holding the group in place with one
hand next the engineer will remove the
pouring group sliding it
downwards group motor removal the
service engineer now needs to remove the
two screws at the top under the upper
motor bracket with a 10 mm
wrench slide out the motor and the
supply fast on connections this
operation can be carried out with the
group fitted to the machine and
following the same
procedure heating element and probe
removal to remove the heating element
loosen the 2 mm Allen screw and slide it
out free the wiring from the
clamps and then use an extractor to
disconnect the two pins from the wiring
connector the temperature probe is
located at the base of the infusion
chain
chamber use a 2.5 mm allen wrench to
remove the two
screws then free the wiring from the
clamps and disconnect the two pins from
the wiring
connector
this operation is possible with the
group fitted on the machine following
the same
procedure movements grew and bearings
removal to remove the movement screw
it's necessary to remove the group from
the
machine take out the motor and then
remove the four 2.5 mm Allen screws from
the top support of the GR
group this way it's possible to remove
the worm screw by loosening
it the worm screw is located in the
right hand side of the infusion
chamber to remove it loosen the four two
.5 mm Allen
screws the bearings are part of the worm
screw to replace or clean the bearings
remove the nut and support nut using two
17 mm
wrenches
then remove the first bearing the
support and bushing and then the second
bearing when refitting these parts the
service engineer will take care to
correctly position the first worm screw
bearing which is comprised of two
washers with a grooved part inside and
the balls in the center
the next thing is to insert the bushing
inside the support and then to insert
the support into the worm
screw now fit the second bearing and the
first of the two nuts tighten with a 17
mm
wrench
make sure that the movement is correct
and check the clearance of the support
slide on the nut support and tighten
with a 17 mm double
wrench again make sure that the movement
is correct and check the clearance of
the support Grease the bearings and
bushing with lubricating
spray infusion chamber and
micromagnetics removal to remove the
infusion chamber it's necessary to
remove the group from the machine and
after taking out the motor to loosen the
two 10 mm screws in the bottom group
support and the two rear Philips
screws
remove the base and with the aid of a 17
mm wrench Slide the infusion chamber out
from the bottom turning the worm screw
anticlockwise the back panel of the
infusion chamber contains its magnetic
positioning sensor the back plate of the
pouring group contains the three micro
switches for group positioning the three
micromagnetic switches serve to check
the bottom intermediate and top position
of the infusion chamber before removing
them mark their positions with a marker
pen and then take out each micromagnetic
switch by removing the 2.5 mm screw to
free them from the clamps and using
extractor to take the two pins out from
the wiring
connector blade ejector worm screw and
blade ejector removal
the blade ejector worm screw is located
on the lower support bracket of the
group once the pouring group has been
removed it's possible to take out the
worm screw by removing the two screws on
the base with a Philips
screwdriver to remove the blade ejector
it's necessary to take out the motor and
to remove the screw on the blade ejector
with a 3mm allen
wrench
gently turn the blade to free it from
the
shaft and Slide the shaft out from the
bottom when refitting the engineer will
have to reposition the
shaft preload the spring by two and a
half turns using the
blade
add in the screw soft Loctite and then
tighten the 3mm Allen
screw maintenance routine maintenance on
the group is recommended every 30,000
pouring
Cycles group maintenance is carried out
as follows switch off the machine and
press the up and down arrow keys until a
display reads
test press the two times clean key to
pass to the heating elements and motor's
test function
the engineer will remove the grounds
drawer and turning the key anticlockwise
open the front
[Music]
door the engineer needs to take out the
top piston by removing the motor cover
with a Philip screwdriver and loosening
a
nut remove the clip of the top piston
and the Silicon coffee pipe then slide
out the top piston
with the aid of a flathead screwdriver
the engineer will remove the screw
securing the Piston shower clean the
shower well with a damp cloth or leave
to soak a while in hot water and pulley
CAF if the shower is too dirty replace
it with a new
[Music]
one using a flathead screwdriver the
engineer will remove the seal
and rinse off the seating and also the
Piston
surface and soak them in hot water and
pulley
calf next use a screwdriver to insert
the new seal and make sure that it fits
perfectly into the
seating screw the shower back onto the
piston the program will have remained in
manual movement mode to replace the seal
on the bottom piston with the machine
door open press seven and move the
chamber to the bottom
position remove the drawer and take off
the bottom o ring with a pair of
pliers press the number six key to move
the chamber to the top position slide
out the springs and remove the central
o-ring on the bottom piston shaft
press seven key and release it before
the blade starts its ejection
movement Slide the Piston out from the
top press eight to send the group to the
intermediate position
take out the 2.5 mm Allen screw to
remove the group's temperature
probe with the aid of a 21 mm wrench
remove the screw supporting the seal and
slide it out with one
finger the engineer will use a flathead
screwdriver to take out the screw
securing the shower to the
Piston clean the shower with a damp
cloth or leave to soak in hot water and
pulley calf if the shower is too
dirty replace it with a new
one make sure that the Piston surfaces
are
clean replace the bottom piston seal and
then fit the new one insert the Piston
into the
chamber press key number six
use food grade lubricant to grease the
bottom piston shaft and slip on the new
seal and
feet tighten the screw with a 21 m
wrench and make sure that the bottom
piston can complete its stroke
freely the engineer will then insert the
supports and
springs fit the O-ring in the middle of
the bottom piston shaft together with
the previously assembled
Springs
press key number seven to lower the
chamber and release it when the Piston
is about to enter the bottom support of
the
spring press the Piston down with one
hand to make sure that the shaft is
centered with the
support press seven to move the group to
the bottom
position insert the bottom
o-ring press eight to move to an
intermediate
position and refit the temperature
probe press the keys for 6 7 8 in
sequence to move the group and make sure
that the top and bottom Pistons are
correctly aligned to change the position
of the micro switch loosen the screw by
half a turn before positioning the micro
switch at the top or bottom and then
tightening the screw use the relevant
key to check the new position the
correct position of the bottom
micromagnetic screw check the new
position with the relevant key the
correct position for the bottom micro
switch is when the blade is at 90°
compared to the front
panel the correct position for the
intermediate micro is when the blade is
5 mm away from the ground coffee
shoot the correct position of the top
micro switch is when the whole top
piston seal is inside the
chamber also clean the guides with a
damp cloth and a greasing
soap moving the chamber up and down so
as to remove any dirt from the whole
surface of the
guides use a spray on grease to
lubricate the guides especially the
bushings of the infusion chamber and the
bearings on the worm