Chandrababu Naidu : జలహారతి ప్రాజెక్ట్ చరిత్రను తిరగరాయబోతుంది | Jalaharathi Project | hmtv
Здоровый Образ
3 followers
Dec 30, 2024
Once the irrigation infrastructure comes
Rayalaseema
will become an articulture hub Here in Andhra Pradesh there will
be aqua culture No drought anywhere else
Water for drinking
Water for industry All these will come
It is a game changer All we have to do is
divert 300 tmc 10% of the 3000 tmc of water going into the sea
Due to this,
reservoirs everywhere are also one They
will be made as balancing reservoirs,
whenever we have a problem, there
will be water there. If there is 150 tmc of water in Bollapally, if we
want water in Rayalaseema, we
will push it from
here. If we want Krishna water, we will bring it down from there.
So that
works as flood control Second, the
reservoirs work as balancing,
now we have 45 tmc of water, we
have 150 tmc,
if needed tomorrow we will do 200, then if we want to
increase it, we can go up to 400.
So this is that It is a broad
concept, the
government is
thinking very seriously about it, it needs to be discussed among the people,
this is a major
project, this is a project that will rewrite history,
according to my calculations, that's why
I have thought about it and
thought about it with everyone. If
we can
do this and make this
state
free of any water problem for the future generations,
it can all be done automatically
depending on what we do. This is where I
go. Wanted to
interact with you all,
how and how much time we have funding funds for this,
if we have money, it will run out quickly.
We are thinking of three four models. One model, how much
flexibility can we take? I
also spoke with the first time finance minister.
Many times they want to
do intra-river linkage,
this is the It is a perfect model for that, so I
asked why don't we start,
they promised to work out
how much should be worked out. After sending the project
report to those who are sending it, it should be
done in a hybrid model. If
anyone comes and
does it, even for such private parties,
it is a game for repayment in 20-25 years. It will be a changer,
we cannot pay at once, the income will also
come from the first year,
if there is water, we can complete it in three years.
After this project, Ballapalli did not do it, we
called for tenders, what has not happened, the work
has started, but it has been nominal work,
not Ballapalli, then
we gave it to Mega, we gave it to Sir Additional.
How much area will be irrigated Part One
How much additional area will be irrigated How much additional area will
be irrigated Sir this project is
still the sky is the limit for you all
what happened to you i.e. wherever you have water
all your ayakattu will come for irrigation
from there we have to
put up smaller lifts we now it
will go up to kuppam till kuppam till now all the ayakattu
will be stabilized then Kurnool Anantapur Kadapa
Chittoor Old Districts all
districts It is enough if we put small lifts where the water comes and
take it a little distance
Unmeasurable According to my calculations, our
people are just counting the water that goes aside,
is it not? This
is water in all the reservoir.
Also it doesn't work
because if you create a new eye patch
you say new eye The existing reservoirs will be closed and the existing reservoirs will be
moved to the next enhancement.
Now this year we have
received good rains. Water has also come from Srisailam. We have
operated carefully. There
is 750 TMC of water.
All of them are also
various canals some are
not yet completed they are also to be done they are also Let's
do a workout, there are some small reservoirs which are
not canals,
what should be done for that too. Now if you look at the example,
when I brought all lift
irrigation function, now
50% of lift irrigations are
defective. 10 lakh acres
are under lift irrigation out of which four to five
lakh acres
are defunct. Is there a calculation, how much
will it cost, how much will be produced per acre,
how much will the cost effect be measured?
Socio-Economic Survey But now we
have taken 30 lacs,
30 lacs per acre,
if you told me this is the
whole state for stabilization, they
said it is the same system.
Hybrid not project is not hybrid,
we have to go automatically depending on the levels, if anyone gets funding,
they are private If it comes, then if
they also take some, we will
get income, so we will pay.
Now we have invested
181 thousand crores in the industry. Today, we have shown that if
you look closely, you will
get jobs for 2 lakh 80 thousand people. We are
giving them incentives again to return the income so that
economic activity goes in the multiplier effect
that is where we are.
Thinking now there is BPCL,
they say we will spend 92 thousand crores
in five years, we want to do it in four years, we are
giving back 75% of the income given to them and we are giving them incentives.
Did you do it in Rajasthan,
how much Rajasthan project sir how much 25 20 thousand
crores 20 thousand crores, do you
have any idea how much 20 25000 crores means
what mode of repayment will the government pay them?
Now once the income has increased, the
GST will increase, won't it be difficult to
pay when the per capita GST increases?
Years
but double income does not come that is where
opportunity cost and
returns Both you have to work it
out sir. Second class
diaphragm. Second class diaphragm.
What is private investment
in their handover Reserves
completed reservoirs their
handover Their
reservoirs are not in their handover, they
will give us annuity only if they give us their water in the last time,
that means they have to do the maintenance too, that is, they are just
paying for the journey. Will
it be with us or will it be with us?
The project will be with the people. Suppose
the government has a road now We
gave the road to the private people, what
did we give them, we gave the road for 20 years, he
takes the money that comes there and they
do this. In this model, we
give money, they maintain it, they give
water, if they don't give water,
they don't get money.
After looking at all the investments they make on water, we
will pay this amount and if any private
investors come, we will give some.
Viability Gap Funding We will
invest as much as we can, from there we will give ₹10.
No, we will not invest it on the consumer.
State Government. Barrett.
I will get an indirect benefit. I
can spend it on that benefit, not
directly. Because here, we
spend money and build projects.
Only in Rayalaseema, above the backward area.
We don't want you to spend money Ask them sir, the
water coming from the best system projects, have they
all been done in this, sir, have they all been done,
we will take all the water from where it comes,
Tungabhadra, Tungabhadra, Srisailam. We
are conceiving a cost effective model so that the incoming water should also be put in it and we are
making DPR We are doing concept
paper before sending it to Government of India and
then we
will prepare PR also in one to two three months we
will call for tenders Sir the
project will be complete in three years but if the amount
is all then in how many years will we
get the returns i.e. the total cost is
80000 crores in how many years we will
get the return by produce it is called economy
multiplier In effect, the CAGR will
go down. You pay that money now If
you look at the cost every five
years it doubles think 40 50%
increase in 10 years it will double
this again we can't build the second one
now after three years we will
get returns now we
don't even have the chance to build such a project by other people
we have a chance only the reason is very cost
Effectively, the second is that
there is water in Godavari, so in
how many years do you think the return of 80000 crores will come?
CALCULATION
15% GROWTH BASED ON ECONOMIC ACTIVITY
I HAVE SHOWN YOU 43TH000 USD
PER CAPITA INCOME BY 2047 20 YEARS
IN 23 YEARS 2.4 TRILLION US DOLLARS
ECONOMY OF ANDHRA PRADESH
