hi I'm Jonathan I'm Ashley and we are
tiny shiny home today our family is
going to share a story of how we built
the most adorable composting toilet ouse
how it failed and how we ripped it apart
and rebuilt it into a cozy modern Moon
Room complete with a flushing toilet
washer and dryer and a hand washing sink
what ready let's go the defecation
station the dooky Den the drop spot poer
the hazard Hut the whz palace the booty
Bureau the kodo boat human H Inda
hooptopia crapper Barrel leaning tower
of poopa flatulation station got too
Chateau Oval Office the casad Kaka as it
came to be known was an ambitious
months-long project a hyper Adobe
earthbag ouse using recycled materials
and the watered Management's permitted
composting toilet plants we wanted to
have a place for visitors to use the
restroom to try composting our own waste
and we wanted to experiment one more
time with Hyper before we started our
house yes and while the building turned
out beautiful the composting part not so
much now we aren't strangers to
composting toilets we've been using the
Nature's head in our renovated vintage
Airstream since 2017 it's a long time
for no flushing toilet it's a very long
time but it became very clear to us that
the design of this permitted stationary
system may not be ready for prime time
basically we had three major issues yes
first of which is bugs guys we went and
followed these directions to at using no
seam screen on all the vents and seals
around everything every time there was a
a seat or a lid or a piece that
connected to the barrel we had seals on
it even all our Windows had no seam
screen on them yeah turns out it didn't
work um I don't know once one bug I
guess got in it turned into quickly
millions of bugs like a cloud of bugs
number two we decided for our system we
wanted to actually divert the urine so
that the solids could compost a little
bit faster right
however the plan's called for/ quter in
fuel tube um if you know what quarter
inch is it's not very big very tiny so
one piece of sawdust gets in there the
whole tube is clogged and there's no way
to get to it to unclog it and I remember
when we put it in we were like we were
thinking this is too small this doesn't
seem like it's going to work yeah and it
it didn't now the only Silver Lining
here is that as part of the permitting
process and the urine diversion our
County made us run those urine lines to
our septic this is going to unlock lots
of upgrades here on this project and
finally we sized the whole system for
our family of six and also on diverting
the urine so now that the urine was
going in there and we had all the bugs
it just smelled real bad yeah it was so
gross turns out when um everything's
mixed together it's not good mm- we end
up talking to a few other people and
they all had a lot of the same issues so
to be honest we're not 100% sure what
happened I think that it's a combination
of a few things way too small urine
diverter tubes should have used like one
inch PVC that would help um and you know
maybe because this building is enclosed
that created more problems yeah maybe
these need to be more open air and even
though we put a bunch of vents in like
maybe we were just compounding the
problem because we enclosed it so well
we built a nice tight little building
and not a lot of things could get in but
if one thing got in then it couldn't get
out so we covered the barrels and we
just forgot about it why because we were
pissed we were we were super frustrated
and also we built that building and then
we moved right into the house and then
we started building the goat bar
container and the super W Dome and like
we just didn't have the brain space to
even think about it no so that building
sat unused for about a year yeah we
brought in a porta potty for one of our
workshops and it just stayed here yep
cuz we didn't we didn't want to deal
with our poo anymore to be honest we
were just going to leave it we weren't
even going to touch it until the house
was done but your dad he pushed us a
little bit Yeah he was like you know you
got the septic line already run we could
just put in a flushing toilet maybe wash
and dryer I mean like you could actually
use this building and they were coming
in October for a visit and he said I
think we can do it in that time frame
and with that it is time to begin the
deconstruction of the casad de Kaka
let's go
[Applause]
[Music]
day one of the Kasa deaka deconstruction
begins as you can see we have all this
material all these barrels in here first
step is going to be we got to dig out as
much of this dirt as we can so we can
get the barrels loose then we got to
empty the barrels and take them out and
then keep going down until we get to our
original Plumbing which is it's pretty
far down going to be a lot of material
tiny space should be
[Music]
fun not nearly as heavy as I thought
they let's see this one's a little bit
cool yeah okay so we thought these were
going to be crazy heavy but they're not
as bad as we thought not at all I think
we can get them out let's see ready
[Applause]
okay this one's heavier hold on right
ready on two oh no my finger slipped is
there something is it still attached
with the tube oh wait yeah yeah good
call good
call I was like why is not m going to
say like this was not that much
cool still it needs to get out of its
little dirt cave if we can pull hold it
back this
way the last one wasn't very full it's
is like gripping spot the question is
can we get it up
there one oh let's do
together probably one that's why we in
gloves one two three okay there's one
ready one two three
on let's just get it to the door
[Music]
see I like a bucket of
poop can you just like twist it sideways
yeah just yeah you go here I got mine
you go here I got
mine nice thing about the plastic is it
just like Falls away from
it
okay we're going to have to take these
Lids out
[Music]
[Music]
that's all we've
done yeah it doesn't look like very much
well we had part of the PIP one
covered and we lost it you can't see it
right
now there it is yeah there is so we
still have I mean it's going like 10
times faster than I thought so much
faster this dirt is so
loose so nice to dig
out
so yeah we still got a bunch to dig out
but we might get it done today I don't
know about that maybe tomorrow not
[Music]
today you
[Music]
got
[Music]
man uh what do you think of our progress
so far I can't believe you pulled those
out I thought they were going to be
crazy heavy in such a pain and you just
like had them out yeah
good job thanks look how much we got
done in here I
know yeah you only have two more sheet
to go down no just a few
inches okay we're already at the pipe
uhuh yeah
really it's probably only another hour
or two see that means we might get to
work on the house this week we might do
you want me to take a turn we're going
to take a quick break and you get back
to it okay I'm want to move these
[Applause]
that's the heavy one this is the heavy
one I think so oh no
problem so what what are we doing with
this I want to cry we're just going to
set it to the side for now under the
solar panels and deal with it later yeah
let it compost we're going to deal with
our stuff
[Music]
later what'd you find yet found the
corpses of so many Beetles behind the
wooden posts weird I have no idea
they're just stacked and like smooshed
up in here so maybe we don't put wood
down into the ground I guess not
[Music]
look at
that almost there so close it just drops
right there it goes down and through the
[Music]
wall oh my god oh wait there it
is these found it he's found it and in
one day we have been Victorious we have
found the sewer pipe it's right there
it's right it's right there we still
have a little bit to do but this is a
good stopping point for the day dogs got
to come out and then tomorrow we're
going to finish this up and now then we
got to go to the outside and get to that
pipe on the outside too it's getting
excited exciting I can't believe we made
this much progress It's So Much progress
[Music]
day two of the cad Kaka
deconstruction we made really good
progress yesterday I can't believe we
got basically all the inside dug
out now we're to the outside so we have
a cleanout right here and we have the
pipe that goes through the wall and then
we have a PE trap that we put on the
outside just because we didn't want the
uh septic smells coming up through those
urine tubes all that's got to go so we
got to get in down in here get this
completely cleared out to where we can
really get to it cut things replum them
uh that'll be the first step and then
I'm going to use this area that's going
through the wall to also deal with our
electrical we're going to be trenching
that's a whole other thing but first we
got shade we're going to start here
[Music]
you want to tell people what I'm doing
no okay you work on the inside I'll work
on the outside you
[Music]
[Music]
we thought about building a whole other
solar system in here because we're going
to need to put a water pump in we're
putting a washer and dryer in we want to
have a few outlets and stuff like that
but we didn't want to build an entire
solar system so here's what we're doing
solar
shed it's about 60 75 ft away so what
we're going to do so we're going to
trench a line all the way over there
pull some wire in put a little box
inside the ouse and then that way we'll
just have 120 volt power from our big
system which we'll need cuz you know
even though this is a very small washer
and dryer I think it's going to use
about 1,500 Watts so want to make sure
we've got nice thick lines coming from
the main system so that means we got to
dig across right where we
drive which is not going to be fun
wishes
[Music]
luck all right Jackson I came to the
hardware store to get a few fittings and
some 3in PVC pipe turns out we brought
the Prius and they come in 20ft lengths
so this should be
interesting well we got it to
F at what
cost this is a very tiny car so two 10t
pieces do fit in a Prius Jack y now
where are you going to sit probably just
back
here ready yeah
he
[Music]
so yeah we're back out early this
morning we are trying to finish this
trench we got some stuff we got to do
later today so I'm really hoping we can
get these trenches dug lay the cont do
it pull the wire and then be able to
close this back up cuz right now uh we
kind of can't drive over our
driveway it's not very safe so yeah
we're working on it still got a ways to
go though
[Music]
okay I'm about done
digging so we're going to come back to
Plumbing because that's the lowest
lowest thing here so you can see we had
our initial connection it came here it
went to the cleanout and then we put a P
trap in which I don't know if that was a
good idea but it doesn't matter cuz it's
going away and then you can see there's
a 3in PVC sleeve that goes through the
rubel trench Foundation before we
started laying bags so we need to cut
all this out and we actually need to
pull out the PVC and then we'll just
pull a 3-in piece of ABS back through
and just reconnect it all so this should
be cleaner we just we got to make sure
that the drop is right right we want we
want the Poo to find its way down to the
septic that's very important so it
should be because we were going from 2
in to 3 in we just want to double check
uh so we're going to cut this gently and
then start disassembling everything
[Music]
[Music]
got to cut it from the inside too so we
can pull everything
[Music]
through you say wonder wonder green two
shots in the airom B
i p
[Music]
only hoping we don't have a a mass cave
in over at the other hole outside I'll
tap
gently we only want to make we don't
want to go War only make we don't want
to go War
[Applause]
[Music]
all
right
Walk In Motion
[Music]
why are we not building a whole new
solar system over at the ous well they
get expensive turns out we're not that
far from the solar shed just took a day
of trenching we're just going to pull
some heavy duty wire through this wall
since we had room right to the side of
the um the septic line right here we're
going to pull our electrical line
through the same hole under the
foundation in separate conduit in
separate conduit we're just going to
hook it all up run it down make the turn
go in pull the wire and then we'll be
done for the day easy peasy no problems
at all should take two minutes
[Music]
right everything's going to be all
right I see that you've been
[Music]
crying you know I'm always on your side
oh
oh come on come on come on come on put
down all the way from the
day
[Music]
yeah go on go on go on go on and tell me
what's been blocking
[Music]
youz I know how it feel all right we got
it they're here I just got a text they
said they are on our road headed our way
any
[Music]
second then I look at
you and I know I'll make it do
oh my parents have been here all of 6
hours and we're already at the hardware
store we getting all the supplies we
need to get this bathroom done
[Music]
[Music]
[Music]
[Music]
all right today is a first day with my
parents here first morning they got here
yesterday and last night my dad and I
went to the hardware store and got all
the
supplies we have drawn out plans for the
bathroom how the plumbing will go how
the electric will go so that is the goal
for today to get everything roughed in
and possibly even the ground compacted
with AB mix to where we're ready to pour
a concrete slab which means another trip
to Tucson because we were there so late
we didn't we weren't able to get the
concrete so I still need 20 more bags of
concrete but we'll see how far we get
today ready let's get started
[Music]
no
[Music]
[Applause]
[Music]
[Music]
the name of the game is don't fall in
the hole don't fall in
the do you think it needs more more what
screws yeah yeah more the better I would
put three in it it's got three holes
doesn't it
yep that's not going
anywhere that's the first of many times
we'll say that you want to just go ahead
and connect those three wires we have it
now yeah we're good good cuz you already
cut
okay yeah I cut it before you even said
that oh did
you when you walk he's like uh I already
cut
it I'm a bit of a fixer raer a couple of
these doors don't close but tell you
that the attic haunted in the kitchen
far is broke it ain't got that curb
appeal this should be interesting to see
how many trips to the hardware store we
take during this project you can plan
and plan and plan and think you have
everything turns out you don't so here
we go trip number
[Music]
one 16 in over aren't
we yeah I think so um 16 inches below
ground is where we wanted to be put it
right on that
Mark and then level
it okay from the bottom I'm about 16
and2 you want it to be at least
16 it should be
close I'm going come back this way how
much a good bit right a little
more that's pretty close
okay it's good enough for who it's for
after hooking up the sub panel it's time
to start Plumbing those sewer lines so
the goal here is we've got that 3in main
trunk line we're going to run that to
the toilet and then we're going to
Branch off to the washer and the sink
and the
Overflow so if we put that
there is that pretty close to the center
right
there is that doorway in the side
[Music]
[Applause]
[Music]
no you know you can use those to cut
copper pipe too okay we're pausing this
video for a quick funny story um back in
2016 Jonathan and I pulled our Airstream
into my parents' driveway to renovate it
for 6 months yeah we really never
touched a tool before for the most part
and we started demoing it cuz we had to
rip all the old stuff out yeah and
there's like you know copper lines all
over the place yeah water copper water
lines in the trailer and so we got the
pipe cutter and we just started chopping
away turns out it's a PVC pipe cutter
not for copper we might have broken the
blade sorry Dad and the inside come
on how you know my impatience comes from
Dad do it again on got hardly any of it
oh my
goodness good yeah
okay good job babe I'm good job babe I'm
not a
[Music]
professional 12 in right there
[Music]
going to have to push that
[Music]
that's good for now just let it go
[Music]
big progress on day one of the
rebuilding of the casad de Kaka okay
what happened so we
replumbed all of the waste water right
so we have a
toilet we have
sink we have washer
and we have an overflow drain in the
middle of the building then we went
ahead we had already pulled all the
electrical from the solar shed but we
went ahead and connected the
Box we ran all the conduit here
underground and we popped up to a few
plugs need one for the washer and dryer
one here in the middle one for the water
pump over there and one for light switch
cuz we're going to put some more lights
in and finally we had to rerun the PEX
line because the original one wasn't
long enough that took us the most time
out of the day because apparently we
stucko the old PEX line in so we had to
chip it all way it took forever ran a
new PEX line through and then we have
run all the other pecs that we need for
the washer the sink the toilet I think
that's it a lot of that's going to run
underground and go under the concrete
pet so that's why we had to do all of
that now so we're done for the day
tomorrow filling this all back in
putting down AB pourn concrete
[Music]
[Music]
[Music]
[Music]
well it's been an eventful morning
moving tons of dirt which is power for
the course here uh we brought in I don't
even know how much AB mix but we're
using AB mix here so that we can compact
it there was just a bunch of sand in
here so we're pretty close to having
this up to the level we want so that we
can start laying the concrete floor um
we're going to break for lunch and come
back this afternoon clown what are you
doing in there
[Music]
have a floor bye tomorrow
[Music]
[Music]
yeah yeah
[Music]
now you may be wondering why the heck
are we pouring this floor in two
sections Well turns out the building is
too wide for me to reach with a trout
and we do not have a Bull Float we
really need to get a Bull Float one day
and second we need that floor near the
Overflow drain to slope to the drain you
know so that water goes into the drain
so that little frame actually worked out
pretty good it allowed us to to make the
outer part where everything is setting
level and then drop right to that
overflow dink good plan dad nice nice so
uh now it's time to run the breakers and
then we'll finish the floor
[Applause]
[Music]
[Applause]
[Music]
[Applause]
[Music]
[Applause]
[Music]
[Applause]
a
[Music]
[Applause]
[Music]
[Music]
[Applause]
[Music]
[Applause]
[Music]
[Applause]
today is day four we are putting all the
things inside the bathroom and hooking
them up
okay just right straight in front of the
window H right there right here yeah
[Music]
[Music]
he we're going to be washing all the
things we are moving up in the we're
going to have a plushing toilet and a
washing machine what how long has it
been who are we 10 years 10
years hey why did you cover up the drin
so it doesn't smell and so you don't get
to in
it we're puning a hole through the wall
that's true we're going to get dirt
everywhere that's true it's pretty solid
right what that looks good
there I think you're pretty good all
right should we like Mark on the floor I
would where the front feet are it is a
big day washer and dryer are being
installed today it has been almost 10
years since we've had a washing machine
or dryer so we will still be using that
hand washer from layman in the summer
but this is mostly a winter setup our
clothes have a hard time getting dry in
the winter and it's just way too cold to
be washing clothes by hand and we are
done with wand mats except for all the
big blankets that we have to wash every
now and then so this is exciting
want to buy any washer and drill holes
in it no that's what we're doing
[Music]
[Music]
[Music]
boy that's different not stepping down 2
feet yeah it's a little nice all right
here we go another trip to the hardware
store I think this is the third time uh
we got the toilet
out and the tank is cracked so taking it
back getting another one it's a whole
hour and a half trip there hour and a
half back
not too happy but they're going to stay
and get stuff done while I run errands
so hopefully by the time I get back
we'll be ready to not put the toilet in
cuz we can't do that yet but we are
going to be able to start punching a
hole through the wall for the dryer Bend
that's the plan
[Music]
[Music]
love
[Music]
easy all right
[Music]
[Applause]
[Music]
I thought you'd be done with this by the
time I got
back we've been on our own set of
Adventures yeah trying to find things
and trips to the hardware store and
making things up as we go yeah yes
[Music]
[Music]
he
[Music]
all right other than setting the toilet
because we're still waiting on concrete
to cure we're hoping that this is the
last day of working on the bathroom
fingers crossed this is the step that
we've been dreading for the entire
project we need to punch a 4in hole
through 16in hyper Adobe walls yeah it
just made more sense for this dryer
instead of trying to go up and out the
ceiling to just go straight out it's
just better if you have fewer turns in
your pipe right however we have never
punched a hole this big in any of our
hyper Adobe walls before and this
building is not stabilized nope just our
soil and some additional clay so like is
it going to collapse what's going to
happen I don't know what's going to
happen let's find out well actually we
do know what's going to happen cuz we
we'd already done it may you just ruined
all the suspense okay what's going to
happen
[Music]
next well that's pretty hard hard for
just
clay you want me to push it
through yeah it came right in the same
hole pretty
[Music]
impressive I know we call
line it's hard to it
[Music]
know okay yeah that wall was pretty
solid yep it took us about 2 hours to
drill through our 16in hyper Adobe wall
that is not stabilized now granted we
were being very careful um you know we
wanted to have a really snug circular
hle so that when we push that went
through you know there wasn't a much of
space on the outside but yeah I mean I
think if we had any concerns about the
strength of our walls we're good we're
good everything's fine everything's
[Music]
great for my
[Music]
Restless please give me a way to escape
this we're going
astray we're going
oh my goodness guys we did it but you
know how at the end of a project um you
just want to get it done and then you
forget to record well yeah I mean your
parents are here we're trying to spend
our last few days with them not doing
stuff and then we had a big rainstorm
and there's all kinds of things going on
and we did bunch of stuff right at the
end really fast and we just didn't
record it y but guys guess what we have
a sink we have a toilet we have a washer
and dryer and we have table and we have
lights we have lights and we have
Outlets oh my goodness I can't believe
it all right would you like to see our
new Cay Kaka and laundry and laundry yes
please
[Music]
[Music]
Oh Come Back Down to
Earth it's just as good as up
there going to keep you
near
cuz welcome to the new Cay
CA look at this running
water flushing toilet
water pump hold
on maybe if you snap your
fingers wait wait wait wait wait
wait we have tables with storage you
want to talk about your tables not
really I mean I do they're great okay so
look we take laundry out and look I can
fold it right here it's fantastic yeah
um we have tables on each side washer
and dryer obviously storage for soap
guys look you even made it match the
curve of the side of them it's pretty
impressive thank you yeah this is the
only one that looks really nice so get a
shot of
that the other one is a little bit off
and I was um a little bit angry about
this one but it's okay now we have
concrete floors guys no more dust in
here oh it's so nice we have a rug we
have a drain on the floor we have trash
can
and vacuum storage nice the vacuum is no
longer on my side of the bed I like it
also I see you've added some hooks we
added hooks we added a little thing here
we have
Decor but still the very most impressive
thing is this bottle brick window yeah
this time of day it lights up and it's
just like little gyms shining in our
bathroom okay time for the nerdy pass
right okay so under here is where all
the magic happens right you got the pump
you got PEC coming up we had to run the
pecs in from there and we came up and
then we teed out into the sink into the
pressure tank into the toilet and into
the washer then of course on the
plumbing side we have our drain here
we've got the drain over at the toilet
at the washer and then the Overflow but
something we didn't really talk about
during the build is that when we did the
composting toilets we built in a bunch
of vents so there's a vent that runs up
here there's a vent that runs here and
then a vent that runs in this other
corner and so we were actually able to
Plum the washer into that for the vent
which is worked out perfectly and then
this was actually built for the sink so
we just reconnected to it this one we're
not using at all but I thought it was
pretty cool that we at least built the
Vincent it's the one thing we did right
right um from an electrical perspective
come over here we ran 120 volts from the
solar shed uh we've learned we ran THHN
inside of conduit it was so much easier
I don't know why we were in Rox before
anyway we pulled it in put it in here
and then we put four circuits in right
so there's one circuit for the washer
one circuit for the dryer one circuit
for this plug and the light and then
there's a couple of plugs over at the
sink for the water pump and then there's
actually one behind the sink so you can
plug hair dryers or whatever you want
into it also importantly because that
run is pretty long from the solar shed
we've learned our lightning lesson so
there is a midnight solar SPD connected
and we have another ground rod right
outside the building that all runs down
under the foundation and we're good to
go
[Music]
it has been almost a month since we
completed this project can you believe
it I can't even believe it's been a
month so how's it going a month of
luxury in a word this whole building is
just great um really like it yeah we
have been doing laundry like we put our
laundry in a washing machine and set a
timer to come back in 30 minutes and get
it out yeah we we did our hyperd
Workshop right after this we were doing
laundry while we were teaching at the
workshop oh my gosh you know what
else we poop in a
toilet it's Game Changer guys we have a
actual flushing toilet it's been almost
10 years since we've had a flushing
toilet has it really been 10 years 10
years in April well I think it's a
little less than that because our our
big RV did have a Flushing that's true 9
years 9 years who's counting it's been a
real long time guys I think we've
earned the flushing pooper yeah yeah all
the drainage is making its way to our
septic which is very exciting so big iy
was worried about that one I don't know
why you were we sloped it the right way
we did everything we've never done it
before and I just you know anyway it the
stuff flows where it's supposed to yeah
high five us the power is perfect the
dryer uses about 15 00 Watts which is
right in line with our system we've been
able to continue to run all the other
things we need to run and dry stuff and
you know in the summer when we're
running more air conditioners we'll
probably be putting that stuff out on
the line anyway so it should all work
out we always have more power in the
winter so now we're actually using it
now the one regret that I do have is
that we do not have hot water it would
have been an extra luxury to have hot
water but let's be honest we haven't
washed our clothes in hot water since
ever yeah it's more for the hand washing
because washing your hands in the winter
with freezing cold water it kind of
hurts it is a little cold our last
regret oh yes is that well it's not
really a regret it's just that now that
this is being used this way the 500
gallon rainwater catchment tank isn't
quite big enough yes but there is a
solution we can get a second tank and
connect them together so that we can
store up to a th000 gallons yeah the the
problem was is the building is so short
and it's so close to the solar panel
array that we just couldn't get a bigger
tank probably the best thing about this
whole build is watching those purple
porta potties leave the property for the
final time it was so nice uh yeah they
just they just didn't fit here you know
they just didn't look great atically
it's not really our Vibe not really I
feel like this build was one of the
toughest fails we've had so far and
we've had a few I mean you researched
the heck out of this whole composting
process we followed it to a tea and then
we spent all this time building this
adorable little building and really
going the extra mile in terms of using
recycled like unique materials all the
finishing design touches I mean it's a
beautiful building and we just couldn't
use it yeah there's a reason why it set
unused for a whole year we were just
pissed but we also knew that no matter
how humbling or embarrassing or
frustrating this whole process was like
people needed to know we were going
crazy until we talked to some other
people that had the same problem and
even if we don't know 100% why this
building failed and why the composting
didn't work hopefully by sharing our
story it'll give somebody the right idea
to fix it on down the line can we just
give a huge shout out to your parents
yes please um Mom and Dad thank you so
much you drove all the way from Indiana
all the way to Arizona and uh you stayed
with us for eight days making sure that
this project got done and that we could
live a little bit more comfortably out
here while we're building our house a
lot more comfortably friends were
pooping in toilets where we're washing
and drying our own clothes we don't even
know who we are anymore this has been
the year of removing annoyances and
adding big upgrades to our property and
I think we might have saved the best one
for last yes but you know what it's time
to get back to work on our hyper Adobe
roundhouse next up we share our
week-long hyper Adobe workshop and the
continued progress we've been making
since then we will see you
soon everything's going to be all right
I see that you've been
[Music]
crying you know I'm always on your side
oh come on come on come on come on put
down all the way from the
day
[Music]
yeah go on go on go on going to tell me
what's been blocking you a
cuz I know how it feels when the walls
are breaking loose when it's dark and I
don't know what to do then I look at
you and you laugh feels up
through then I look at
you and I know I'll make it to oh oh
[Music]
the times when you are
falling I will lift you
up and when you're feeling
tired I will feel your cup