We bought an abandoned farm in Italy - One year progress

Life in houses in harmony with nature
399 followers
At the end of January 2023 we got the keys to our farmhouse in the north of Italy.
After years of saving up to buy our first and hopefully forever home,
we somehow got ourselves into buying 16 hectares of land with seven buildings that between them
have a dizzying built surface of 1200 square meters and a total of 27 rooms.
There's the main house with a u-shaped floor plan, the winery, the chapel, the hen house,
which really is a whole cottage in itself, two warehouses and as if all of that wasn't enough,
a small cabin tucked away deep in the woods. This is what it looked like on the inside.
The farm has sat empty for 15 years but even before that only a small part of the property
was still lived in while the majority of the buildings were slowly decaying.
We've now lived on our Italian farm for a year.
As we spent the first six months following buying the farm, splitting our time between
the Cascina and the Netherlands, this is essentially a 52 week or sort of a year overview.
This is the story of our imperfect progress during those 52 weeks.
Our first priority once we got the keys was to get the house ready to move into six months later.
Because our rental in the Netherlands was about to be demolished,
we had a pretty tight deadline for moving. That meant getting the water and electricity back on,
sorting out a solution for internet as there's hardly any reception at the house
and getting a new gas tank installed. We managed to dig water off the to-do list fairly quickly
but with no electricity and heating in the middle of winter we chose to stay in a holiday cottage
in a village nearby. We did set things in motion for electricity and got quotes for gas but the
installation would have to wait a few more weeks. Our farm was still full of things when we bought
it. Each item telling stories of daily life on this hill over the past hundred years. We had
to start cleaning out and reorganizing the stuff that was left behind to make space for our own
things. So we began what would become an endless game of renovation Tetris. Moving things to a new
place and then moving them again and again later. We're the sort of people who'd rather
move a bunch of stuff three times than throw anything away that we might regret later.
There's already enough stuff on this planet and much of what you need is right under your nose
if you take the time to look. While rummaging through old things is something we thoroughly
enjoy, cleaning is a less favorite job. So to switch things up we took on a few other projects
with the tools we found around the house. The biggest one was clearing all the leftover hay
out of the old hayloft so it wouldn't attract moisture and rust the steel beams underneath.
We also took down a few branches of a tree that was damaging the roof.
In our enthusiasm we went at it with a handsaw but a few weeks later we'd finished the job with
our first chainsaw. March was a pretty big month as we finally got electricity and spent our first
nights sleeping at the farm. A few days later we also had internet and gas. For cooking anyways
as a problem with the water pressure prevented us from connecting the boiler. The current heating
and hot water setup in the house runs on gas and while we hope to switch to another heating system
in the future, for now this was the easiest, fastest and honestly the only solution that
one non-negotiable was finding a place that was at least partly livable. We didn't fancy the idea
of living in a tent for ages while renovating the property and renting nearby is costly and
limited in options. Plus being in the space as we work on it gives us a better feel for how we
naturally use it and what changes we want to make. The clearing art that we had started in January
continued in the kitchen and bathroom and in the old farmhouse that we'd planned on using
as temporary furniture storage during the move. We dropped off the first van load of old stuff
including possibly the most stinky sofa of human history at our local recycling plant.
Many more van loads would follow throughout the year. In June we made a final short visit before
the actual move in July. The mission for this visit was fixing the water pressure.
Washing yourself from a bucket of water heated on the stove is bearable for a little while but
the aroma of it wears off rather fast. Two chaps from the water company came over and fixed the
pressure but then we discovered a leak under the courtyard. It turned out that the old iron
pipe was completely corroded and leaking in multiple places. We decided to leave the proper
fix for later but with help from one of our neighbors we put in a temporary above ground
pipe before heading back to the Netherlands. In between all the episodes of fixing leaks,
digging further, finding yet another leak, waiting for the plumber and considering
alternative solutions we did manage to tick off a few other projects.
We cleared out the last of the bedrooms so that our moving team
could have a comfy night's sleep a few weeks later.
Replaced the pretty grim toilet seat with a new one and cleared out the hen house.
Back then we still thought that this was the first building we were going to renovate
into a holiday cottage and we were so looking forward to get started with it.
Our move was a little bit of a logistical circus because we weren't just shifting things from point
A to B. Our stuff had to come from several different places. First there was everything
at our house, then we had all the items from Bertha's workshop. Plus there was some antique
furniture of mine that had never made it to the Netherlands, stashed away in my dad's cellar and
my grandma's garage. The easier thing would have been to let go of most of it but that would have
meant parting with a tool collection built up over 20 years, several family heirlooms and 500 kilograms
worth of art, archaeology and history books. Using a moving company felt like a logistical
nightmare and way too much pressure so instead we rented two big vans and packed our horse trailer
and did everything on our own timeline. With the unpacking we then filled the spaces that
we had cleared out a few months before so it really looks like nothing changed there
and they have been in more or less the same state ever since.
Our friend Marijn couldn't resist and chopped down 10 dead trees around the cantina before
driving straight back to the Netherlands to return the vans,
clean up our house, hand in the keys and take the last van load back with us.
Driving 5,000 kilometers in a week on barely any sleep left us absolutely knackered so the
first half of August was all about catching our breath after that intense move. We allowed
ourselves some time to settle in, spent an inordinate amount of time looking for things
in boxes despite keeping neat packing lists and improvised an outdoor lounge and garden table.
We patched up the biggest hole in the cantina roof and we also did some basic house improvements
in the bathroom and kitchen and finally got hot water. There was quite a lot of pleasant
distraction with family and friends visiting and somehow we managed to also rent a digger
and open up the courtyard for the new water pipe right in the middle of a heat wave. Having to dig
through the beautiful ancient paving and a few inches of solid rock meant we needed to do quite
a lot of manual digging after the digger was done. In the future this pipe is only going to serve the
two garden taps connected to our off-grid cistern. We're planning to run new water pipes behind the
house sometime in the next year. September rolled around and we finally installed the new water pipe.
We closed up the trench, laid stepping stones and shifted some of the massive
papers that came out when we dug the trench. By this time the disordered workshop was driving
us mad with its chaos so we decided to sort it out. We spent hours organizing tools, not just our
own but also the ones we inherited from the previous owners. It took ages but it's not exactly
riveting content for a video. Living out of boxes was getting annoying so we tackled a few small
projects in our bedroom, fixing nightstands and adding shelves to the old wardrobe.
Finally we could unpack our clothes and stop dressing out of cardboard.
We also did a bit of sprucing up in the guest room to make it more welcoming for Bertha's parents.
So
in October we tackled the last steps of closing the trench which was honestly getting on our
nerves by this time. We expanded the water valve pit to fit the new tubes which was also my first
time laying bricks. We picked up 400 kilograms of compost and planted the trench. I'm so happy I
ignored all the common sense and went ahead with it. The logical thing would have been to wait until
after we redo the facade or until after we replace the asphalt with something less ugly
but it's been such a joy this spring to see flowers bloom and butterflies flutter about.
Our other main project for the month was restoring the bathroom window.
This one was a test run. We wanted to see if our woodworking skills were up to the task and if we
were ready to retrofit all our single glazed windows on the first floor with double glazing
this summer. We're ordering said double glazing as we speak.
November was a short month because we needed to go to the Netherlands to wrap up some loose ends
there. We did build firewood storage and filled it up with five cubic meters of oak ash and beech.
We also started clearing up on the west side of the garden,
December was the month of painting all our metal exterior doors. We had been craving a
quickish project with a big visual impact that would make the house feel a little bit more like
ours and this was the perfect job for it.
Bertus set about clearing up the attic staircase that was buried under a foot of dirt. This job
was part of a bigger mission to clean and insulate the attic of the new house this year
and to fix some leaks in the roof of the old house. I'm feeling like an archaeologist. Maybe
I should call Isis because she's the one of the two of us that is an archaeologist.
We have a pair.
Then followed a month of wintering. We both caught a flu one after the other. Just as we
started to feel human again, a small skittish tomcat appeared in our lives. We named him Velutton.
Our blue tiled bathroom got a bit of a makeover with a fresh coat of paint on the ceiling,
walls and radiator and we turned an old wooden ladder into a rustic towel rack.
Bertus tackled insulating the big iron workshop doors, a job meant for December but delayed due
to a late delivery. We had the chimneys cleaned and finally got our Italian residency, Italian
ID cards and social security paperwork done. And in between all that, we sat down to revise our
plans for the house, draw new floor plans and talk to our geometer. Initially, we thought we'd create
several smaller holiday units, each with its own private kitchen and garden. But after a few months
of living here, uncovering its history and hearing our neighbors nostalgic tales of the Kashina from
20, 30, 40 years ago, we realized that it should once again be a place that brings people together.
This house needs a large kitchen that is the heart of it all, with a long dining table that
seats many. It could be a place for creative retreats, courses or family gatherings. But to
get there, we will need to take it in steps and the first step is to create a single self-catering
holiday apartment on the ground floor of the house. To make that happen, we need to move out of
the ground floor where we are currently living and moving the workshop out was the first thing
on our list. This week we're going to clear out the stables because we want to move our workshop
in there. When the previous owners abandoned the house, the workshop was at the rear end of the
new house, so we kept it that way for the time being. The old barn seemed like the best new spot for it.
On one of our many visits to the local recycling station, we found a small wooden table
that had the perfect size to turn it into a bathroom vanity.
Next, we salvaged the small lamp from the old farm and with a little effort gave it new life.
Because this bathroom will get a complete makeover later that will involve moving the
door to another spot, we're sticking with a minimal budget. Little improvements like this
are important to us though. This project is not just about renovating as fast as possible,
but also about making a home for ourselves right here and now.
March was busy with lots of visitors. My dad came over for a week to help with cleaning the attic
and chipping off the old cement blender on the barn walls. We supported a damaged bolt in the
cow manger, which took several weeks to complete. The fixing of the bolt would need to wait a little
bit longer for temperatures to rise to the minimum level for working with lime.
We were treated to some really lovely spring weather that we used to clear up the totally
the rotten torch behind the cantina. Remember those 12 trees we cut down last year? We finally
got around to processing them into firewood. We're nowhere near done yet,
but we're putting the rest on hold until fall rolls around.
On a rainy day, we took on the indoor job, taking down three tons of timber that were stacked on the
ceiling beams. We hadn't managed to paint the last metal door green before the first frost arrived.
The double doors of the big warehouse were saved for a few days in April when we had extra help.
Meanwhile, we were building our own dry stone terrace wall and ramp leading up to those doors.
A good friend of mine was more than happy to help us lock those big rocks in place.
By now, temperatures were high enough to work with mortar and we got around to fixing the
loose bricks in the vault of the barn, stabilizing it and preventing further decay.
In between the proverbial cracks, we also managed to partially clear out the top floor of the cantina
But before setting up our new workshop in the barn,
the barn doors needed some love and much needed extra latches and locks.
We patched up and painted the back door, then the front door.
We made our own natural mineral paint. It took a little experimenting to get the color just right,
but now we have settled on a recipe that we'll also use to paint our new shutters this coming winter.
We cleared out the old kitchen and sold the decades-old agricultural machines from the
big warehouse. And we turned this newly freed up space into a timber yard with all the wood
we found in our outbuilding. Bertus repurposed the metal pipes from the cow mangers to build
a shelving unit for our scrap wood and used the same pipes to create a shelving unit in
the barn for our tools. After cleaning out a Palio attic, we took out the ceiling to open
up the space and make it easier to replace a rotten rafter soon. Even though we're not
prioritizing a full renovation of this building, we still want to look after it in the meantime.
The workshop is far from finished and we'll keep tinkering with it whenever a project demands it.
The good news is that with the old workshop nearly empty, we're one step closer to our plan
of renovating the ground floor of the newest part of the house. Before we can start though,
there's always a before, isn't there? There are more pressing matters we need to attend to.
We knew when we bought the house that there were several leaks in the roof of the old farm,
but after a whole year of hardly any rain, it never felt too urgent. That was until we got
a super wet spring. The leaks have been there for many years and are the main reason why the
previous owners abandoned this part of the property. But if we want to prevent the roof
from collapsing before we ever get to replacing it in the future, we decided it's time to act.
We cleared out the old garage, put supports under a cracked vault and ripped out a rotting ceiling
in the room above to get a proper look at the problem. Fixing the leaks and replacing the tiles
is one of the things on the agenda for the coming months. As we were emptying out the garage and
needed somewhere to put all our garden tools, we decided we might just as well turn the now
clean polio into a lovely potting shed for the foreseeable future. And then the final job we did
just before summer solstice is spray a product on our stone walls that in the next months will
break down the lichens so that the walls will hopefully be clean when we start with repointing
them. We've been asked often about our plans, about what exactly our project is, about what
precisely our vision is. And we've come up with answers, but in truth none of them feel right
because all of it is still unfolding. We've bought this place because of possibilities
and not certainties. We've started this adventure because a life closer to nature, continuous
learning and building new skills feels like the journey that we need to be on. It's what feeds
our souls and it's what brought us together. Many will think that it's crazy and naive or perhaps
even stupid to take on such a big project with little experience and without a neatly laid out
plan. But to us it feels refreshingly liberating and it's a kind of freedom we'd like to see more
of in the world. The freedom to follow the road that you can feel under your feet without being
able to actually see it yet. This is the start of year two, simply putting one foot in front of the
other on that path.
