This Engine Will Change Aviation Forever
venhata
1 follower
#Hydraulic Press
The XWB is one of the most popular and powerful engines in the world.
It produces 97,000 pounds of thrust and powers giant airplanes like the Airbus A350-900 and
Airbus A350-1000.
The engines are assembled in Derby, England.
It all starts with an idea and design.
Teams from all over the world work together on design activities, looking at the problem
from different angles and levels of detail.
Depending on their position in the supply chain, they focus on the entire product, its
service aspects or specific components.
After designing the engine, the assembly is a complex but repetitive task.
It all starts with the fan disc.
Each one has slots where the fan blades will go.
Between each blade, they will include annulus fillers.
After completing the fan, it's time to move to the turbine and the shaft.
This is the back of the engine.
Turbine blades spin the shaft, which is connected to the fan.
While the modules of the shaft are being built, the low-pressure turbine at the back of the
engine is constructed while suspended vertically.
In the meantime, the fan is placed inside a special case that has many wires and pipes.
To ensure that not a single wire is misplaced, the workers use a computer map to see where
all the parts go.
Once the core is ready and the fan is placed inside the fan case, they're ready to be
married together.
The engine is then placed inside a testing facility, and from inside a control room,
they will test the engine's performance.
It's suspended in the air and secured on a platform.
Then they perform the various tests.
To simulate a heavy storm, Rolls-Royce will use water ingestion testing.
Simply put, this is a test where the test operators will flood the engine with thousands
of gallons of water to see how the engine performs in severe weather conditions.
Fan blade off tests include purposefully destroying a fan blade to see if it causes serious damage
to the engine.
The blade must be contained within the system while still preserving the engine's functionality.
Bird strike testing simulates bird strikes that planes encounter during takeoffs and
landings.
Since this is the most common way airplane engines get damaged, passing this test will
ensure the engine is safe even when birds fly into the engine.
Cold start testing is the most difficult test to perform because the engine needs to be
frozen.
They bring a massive fridge, put it around the XWB, and wait.
After 24 hours, they will jumpstart the engine to simulate starting an aircraft in cold weather
conditions.
All the test results are provided to the contractor, and if approved, the engines are ready to
be installed.
The GE90 1995 engine changed the face of aviation.
It was comprised of carbon fiber composite fan blades.
After the Gen X, General Electric changed aviation again with the GE9X.
This project was announced in 2012, and the engine was intended to power the Boeing 777X.
This engine will be made up of only 16 fan blades.
However, they will be 4th generation carbon fiber composite fan blades.
Despite being thinner, they are more durable, wider, and longer than the previous models.
The compressor has a compression ratio of 27 to 1 and set a new standard in aviation,
calling them an industry-wide game-changer.
They will incorporate a lean-burning combustor that can withstand the highest temperatures
inside a jet engine.
To manufacture most of these parts, GE is utilizing the power of 3D printing, which
allows them to create parts that were never possible before.
The ceramic matrix composites will weigh only one-third of the metal but will have twice
the strength.
This will reduce noise and 10% less fuel consumption, making it a greener engine.
As soon as GE completed the core of their new engine, they took it from Jupiter, Florida
to Evandale, Ohio.
They placed it in test cell 44 and secured it inside a special pod where they conducted
most of their tests.
Before equipping the Boeing 777X with the GE9X, they had to expose it to icing tests.
They logged 162 cycles before approval.
Seven months before schedule, GE placed their GE9X at a testing facility in Peebles, Ohio.
The certification testing began in May of 2017.
After passing all of the tests, the GE9X was equipped on a Boeing 777X and flew for the
first time on January 25, 2020.
The flight lasted for 3 hours and 52 minutes.
The F-35 Lightning IIs are the most powerful fighter jets known to man.
They are stealth fighters that cost $75 million to build.
The U.S. Air Force has been using Pratt & Whitney's F-135 Low Bypass Augmented Turbofan to power
this juggernaut through the skies.
It is an upgrade of the Pratt & Whitney F-119, which powers the F-22.
Even though some of the F-35 Lightning II fighter jets use the F-136 engine model from
GE, these are still not in production.
That's why we will focus on the Pratt & Whitney F-135 model.
After careful design, the government contractor proposed their F-135 model for the engine
in the 90s.
Engineers had to carefully design all the engine parts without actually building the
engine.
The compressor, combustor, and turbine were the first fit together on paper.
After that, the company used advanced computer simulations to model and optimize the engine.
Only after proving their concept did they get the contract to build the engine that
would power the entire fleet of F-135s in 2001.
It was called JSF, or Joint Strike Fighter Program.
Once they were selected, Pratt & Whitney signed contracts with different third-party manufacturers
to build the parts.
Different manufacturing facilities used advanced techniques such as additive manufacturing,
3D printing, precision machining, and advanced materials to build each part.
If any of them are lost, damaged, or late, the production process will grind to a halt.
This is why Pratt & Whitney ensures there are no delays.
All of the spare parts are tracked by the team inside the command center.
They track everything from the giant parts to the smallest screws and bolts until they
arrive at the assembly facility.
45,000 different parts are tracked every day.
First, they assemble the engine's core, which includes the compressor, combustor, and high-pressure
turbine.
The fan and low-pressure turbine sections are later built into the engine.
Once the engine is complete, it must undergo strenuous testing in something called a hush
house.
There are several of these across the U.S. and one in Japan.
There are testing hush houses in California, Florida, Texas, Virginia, and Maryland.
Inside these hush houses, the noise generated by the engines is reduced using enclosed test
cells, all while also improving the airflow into the engine.
This reduces noise pollution when keeping the aircraft inside a controlled environment.
The engines are subjected to various tests including performance, stress, and environmental
tests including extreme temperature and pressure conditions.
The engines undergo rigorous testing to ensure they meet strict performance and safety standards.
If all the benchmarks are met, the F-135s are installed into the F-35 airframe during
the final assembly of the aircraft.
The process takes place at Lockheed Martin's assembly facilities where the F-35 airframes
are constructed.
After the engine is installed, the F-35 is not ready to fly just yet.
It must undergo a series of final checks including engine integration checks, avionics tests,
and system verifications.
This ensures the aircraft is safe to fly and won't encounter unexpected problems midair.
After several retrofits since the B-52 Stratofortress was introduced in February 1955, it was time
for a new pair of engines.
On April 23, 2020, there was a new proposal for retrofitting.
The U.S. Air Force needed 608 engines for their fleet of B-52 bombers and some additional
spares.
The plan was to find a government engine contractor by May 2021 so they could start building the
engines.
But things didn't go according to plan.
All three major engine manufacturers, Rolls-Royce, General Electric, and Pratt & Whitney submitted
their approvals.
Pratt & Whitney proposed the PW800 model, Rolls-Royce proposed the F-130, and GE came
up with two turbofans including the CF-34-10 and the Passport.
After some careful consideration, the U.S. Air Force awarded the $2.6 billion contract
to Rolls-Royce and their F-130 engine.
The company was contracted to build 650 engines, 608 of which would replace the current engines
on the B-52 Stratofortress and the remaining 42 would serve as spares.
When building the engines, Rolls-Royce had to pay close attention to how they were constructing
these engines.
These were dual engines, something Rolls-Royce had not tested before.
The B-52 fleet needed to keep the dual engine design because going from dual engines to
single engines would require changes in the bomber's controls and systems.
And we all know what that means, more tax dollars being spent upgrading a very old fleet
of airplanes.
The F-130 engines will serve the B-52s until the end of their service life.
In March of 2023, they started testing the first F-130 engine at the NASA Stennis Space
Center in Mississippi.
All of the engines will be constructed at the Rolls-Royce facilities in Indianapolis.
The two F-130 engines will be tested simultaneously in a dual pod configuration.
They'll subject these engines to rigorous tests like every other engine.
They'll be tested in crosswind airflow conditions and they will also confirm the operations
of the engine control system.
After the testing, they'll have to disclose all of their results to Boeing and the U.S.
Air Force.
If the benchmarks are satisfactory, they will proceed to the next step, which is mass-producing
the F-130 engines that create 17,000 pounds of thrust, enough to power a heavy plane
like the Stratofortress.
Bye for now.