Continue, this project will be completed,
whatever the PP4 industry has
come,
think about it. We will
take up that town now. In the first phase, we will
take up that town and then we
will do it all over the state. We will launch it in January. Have you
seen the project estimate,
now there are four births, they
will continue, whatever the estimates
are, there is no need to increase them now, in my
opinion, anyway, I will review.
Industries should come in connection with the court. We
will see what can be done.
If they come, it will be
picked up immediately under anchor industry. If as an alternative,
we will work out what else to do. Is it
enough? That is, if it is necessary, we will
acquire land and if possible, we
will do it all. If the
port comes first, this will be a lot.
Now you have seen the national highway, it will
be easy. If the
railway line is coming up to Raypalle tomorrow, the connectivity will
be easy. In this way,
we need to do all this by connecting Machilipatnam. If the
port is fine tomorrow, all these
will come automatically. Sir, there
is an MP next to you. Let's work out that for Bhogaraju Patta Sita Rao's building
in the past. In
every place they have taken two acres and
they are in poor
condition. What kind of estimated
cost have they built? Is it a
private contractor who has given the land to the proposal
from the government?
Permission to
Construct You didn't talk now,
sir, I asked, sir, we asked,
sir,
all of
you were there then, sir, because I am a national media, because I don't carry about everything.
If you are fighting so much, it means you stopped it or you couldn't stop
it. We will definitely take action on what to do.
No, not for this.
We all fought. You fought.
What should we do something else
Ambedkar no government definitely
I understand what you are saying it
has come to a situation of looting people's property at will it is not correct what should
I do sir this is 100 years
ago I told this a lot
you should save something one of the best college
this is this We
will nationalize it immediately, the state government
will take it, we
will take it and take it forward in any way we can, not
even nationalize it, not even a private college. We
will develop
ok endowment so we will remove it
immediately we will remove it
thank you time time time no time already I do
n't have another flight again
hello
everyone ok ok
hello everyone today I
came here to do programs in Swachh Andhra Pradesh you saw here
four
roads four roads in the junction
heaps heaps heaps
heaps of garbage waste There is a situation where everything is being stockpiled,
such
piles are piled up,
but wherever you look, the whole state welcomes
you. There is a situation where 85 lakh metric tons of dry garbage is dry waste. This is very bad. At
this time of doing programs everywhere under Clean Andhra Pradesh,
a few million metric
tons of waste have been generated and started everywhere in these five years,
I do not understand what this government should do with the government. I do
not understand what the government should do. If we want to
do it, it will
take us one or two years, two or three years, but for the
cleaning, the
future programs will take more time.
However, all the systems will be stream-lined.
This project should be completed in PP model with a cost of crores of rupees. It
needs to be completed by October 2025
but the works are 26% completed so far.
24%
works worth 865 crore rupees have been
completed. In
this too,
when I went there, I saw a note was also given that the
government land should be given 20 32 acres and
6 acres 36 cents
should be acquired and the total should
be 38 acres 36 cents for the project. I also
told the collector that the work will be
completed immediately.
Four husbands will come.Ultimately, there will
be a possibility to go up to 16 in the master plan.In the final project,
3600 196 acres of land will also be
speeded up. It is
possible to reach here in 45 minutes to an hour from the nearest port, so if this port is
developed in all ways, it will be
very useful not only for the people of this region but also for the capital, we will
make a stream line for it, either external roads
or the same, or stream line
in the police training center which is required here.
Water supply
and all these are also pending.
Second, there is a shortage of sand.
Even now, I am
giving instructions to the collector. If there is no raw material or facilities for this project
on a fast track, then it is
a responsibility to complete everything and complete it within the planned time. We
are putting it in and we will complete it. Not only will we
complete this project but
also the industries in this region will
come to export if we grow.
If we can develop it under container port, but from Nagpur or
from Telangana or from Telangana, there will
be opportunities to integrate it under dry port.
There are various opportunities not only in our state. We will also do
all the
states that have land in the neighboring state.
Ultimately, we want to develop this port
into a good port and we will
do the
same and the city
has commitment to all the works that I have said before. We
will definitely do
this.
You couldn't come to reach you.
Many movements have been made for this.
Few movements have been
made over the years. If there were movements for two years or three years, if
I started the port on that day, they
changed the port that was started. But now
I don't want to disturb it
again. It will be destroyed.
Situation we
will complete this project.Continue this project will be completed.PIPIA
is also P4.
Shall we increase the project estimates?
Now there are four births,
they will continue. Whatever the estimates
are, there is no need to increase them.
My opinion is that I will review.
Industries should come in connection with the water court. We will
see what can be done. There
will be a clarity, if they come, it
will be picked up immediately under the anchor industry. If alternatively,
what else to do,
we will work out all that. Is it enough? If it is necessary, we will acquire land and if possible, we will do it all.
We will plan all the ways. Industrialization is very
necessary. If the main
port comes first, this will
be a lot. Now you have seen the national highway,
it will become easy. Tomorrow, if the
railway line will come up to the village, the
connectivity will be easy. In this way,
we need to do all this by connecting Machilipatnam.
If not, it will be 8. Tomorrow's
competition will come automatically if everything goes well. There
is an MP next to you.
They have talked about Bhogaraju Pattala Sitaram's building in the past. They
took out and
built this, sir, their office has been
built everywhere so far, they have taken two acres and they
are useless.
What kind of estimated
cost did they build? Is it a
private contractor? Is it land to proposal
from the government?
What about the original
permission was taken from you or not?
MUNICIPALITY PERMISSION WHO
GIVES THE PERMISSION WHO GIVES THE PERMISSION TO
CONSTRUCT YOU DID NOT SPEAK THEN
SIR WE ASKED SIR WE ASKED HIM
SIR SIR THEN ALL OF YOU
ARE GAMMU SIR BECAUSE I AM A NATIONAL
MEDIA BECAUSE I DO NOT CARRY
ABOUT EVERYTHING OK
YOU ALSO DO NOT SPEAK OUT OF THE HOUSE It didn't come
against everyone. If you had come and fought so much since then,
you would have stopped it or not. We will
definitely
take action. Not for this. We all
fought. You fought. We also
fought. We all fought. I will tell you
how those buildings were built and they
can be changed. It is something different.
Ambedkar. What government is definite.
I understand what you are saying. It is
not correct. What should
I do? Sir,
I have said this 100 years ago.
One of the best college,
this should be preserved, we
will nationalize it immediately, the state government will
take it, we will take it,
we will take it in any way we can take it forward, not even
nationalize it, not even a private college.
Let's beautify it, let's develop
it in a way that will be remembered to give it its former glory.
Okay, it's endowment, so we'll
remove it immediately.
Thank you. Okay, hello to all.
Today, I came
here to do programs in clean Andhra Pradesh. There is a
situation where
such
heaps are piled up,
but wherever you see it, the whole state welcomes you. There is a
situation where 85 lakh metric tons of dry garbage is dry waste.
This is very
bad. At
this time when programs are being carried out everywhere, in
these
five years, a few crores of metric
tons of waste have been generated and
stored somewhere, I do not understand what to do with this government. I do
not understand what to do with such a government. There will be a
situation where it will take two to three years for the clean-up,
but the future programs will take time from there.
In PP model, this project should be
completed
by October 2025,
but the works are 26% completed so far,
24%
works worth 865 crore rupees have been
completed.
Also, when I
went there, I saw that a note was also given that the
government land should be given 20 32 acres,
6 acres 36 cents
should be acquired and the total should
be 38 acres 36 cents for the project. I also
told the collector
that work will be completed immediately.
In the ultimate master plan, there
is a possibility to go up to 16. In the final project,
3696 acres of
land is also
needed. It will be speeded up now. If
this project is fully speeded up and completed again, there will be an
opportunity to contribute to the development of Machilipatnam. It is
possible to reach here in 45 minutes and an hour, so if this port is
developed in all ways, it will be
very useful not only for the people of this region but also for the capital.
They also said that some are pending and secondly, there is a shortage of sand. Now I am
giving instructions to the collector. If there is no
raw material or the
necessary facilities for this project, we are making it
a responsibility to complete it within the planned time.
We will not only
complete this project but
also the industries in this region will be able to export if we
can develop it under container port, from Nagpur or
from Telangana or from Telangana but there are possibilities to
integrate it under dry port. If
the states are there, we
will do all that. Ultimately, we want to develop this port
into a good port. We will
do that too.
And the city
is committed to all the works.
Many movements have been done,
few movements have been done over the years.
Continue, this project will be completed,
whatever industry has
come, we are
also recording PP4.
We will do the project estimation,
now there are four births, they
will continue, whatever the estimates
are, there is no need to increase now, in my
opinion, anyway, I will review it.
Industries should come in connection with the court. We
will see what can be done.
If they come, it will
be picked up immediately under anchor industry. If it is special and
what else to do, we will also work out all that. Is
it enough? If it is necessary, we will acquire land and
if possible, we will do it all.
We will plan all the ways. If the
port comes first, this will be a lot.
Now you have seen the national highway,
it has become easy. Tomorrow, the
railway line will come up to the village tomorrow. It
will also happen tomorrow. If
all these things go well, they will
come automatically. There is an MP next to you. Let's work out
for Bhogaraju Pattala Sitaram's building. Let's
work out that too in religion. It's a little bit
cornered again. OK,
they are YSRCP.
So far, two
acres have been built everywhere and they are being
used. What is the condition of
them? What kind of estimate cost do they
go to them and build? Some
private contractor land to proposal
from the government?
What about it? Did
they take permission from you or did they
give permission from the municipality? Who gives
permission? Who gives? The Permission to
Construct You didn't talk then,
sir, we asked him, we asked him,
sir, all of you were there then,
sir, because I am a national
media, because I don't carry about
everything.
If you had fought so much, if you had fought so much, would you have stopped
it or
not?
All that can be
brought out and changed. It is something
else. Ambedkar. No government.
Definitely. I understand what you are saying.
This is
not correct. It is not correct. What should I do?
Sir, this is 100 years ago.
It should be protected, it
will be nationalized immediately, the state
government will take it, we will take it, we
will take it, we will take it forward, it will not be nationalized. This
way we
will develop it
ok endowment so we will remove it
immediately we will remove it
thank you ok
hello everyone today when I
came here to do programs in Swachh Andhra Pradesh you have seen here
four
roads four roads in the junction piles piles piles piles piles piles piles piles piles piles piles piles piles piles piles piles
like piles like piles
piled up.
Wherever you look, there is a situation where the whole state welcomes you. There is a
situation of 85 lakh metric tons of dry garbage and dry waste.
This is very
bad.
I do
n't understand what to do with this government if they have generated a few crore metric tons of waste in five years and stored it anywhere. The
situation is coming
but for the cleaning, the
future programs will take time from there, but the
situation will take time.
However, all the systems will also be stream-lined.
Just now, I have
gone to Machilipatnam port, I have seen the port, and I have
come for a surprise inspection. It
needs to be completed by October 2025
but the work is 26% completed so far
24%
of the work worth 865 crore rupees has been
completed
Repo developer called me and
told me that under any circumstances we will
speed up the project to complete it by 25.
Also when I was there they
gave me a note. I have seen that the government
land should be given 32 acres and
6 acres 36 cents should be acquired for the
whole project and 38
acres 36 cents should be given
to the collector. There
is a possibility to go. In the final project,
3696 acres of
land is also
needed. Now it will be speeded up.
It will be speeded up completely and
again. If this project is completed, there will be no
chance to contribute to the development of Machilipatnam. Also, it is the capital
port.
If this port is
developed in all ways, it will be
very useful not only for the people of this region but also for the capital.
They told me that there is a shortage, but now I am
giving instructions to the collector, but if there is no
raw material or the
necessary facilities for this project, we are making it
a responsibility to complete it within the planned time. If
we encourage industries in this region to
export, if we
can develop it under container port, from Nag port
or from Telangana, but from Telangana, there
are opportunities to integrate it under dry port.
Ultimately, we want to develop this port
into a good port and we
will do the
same. I told the city before that we
have a commitment to all those works. We
will definitely do it. Briefly, with the intention of emphasizing more about this port.
A few movements
were made, for two years or three years, movements
were made. On that day, if I
started the port, the port was
changed again, but now
I don't want to disturb it again, it will
be destroyed.
P4 p4 p4 We will
take up that town now. We will take up that town now. We will
take up that town in the first phase and again we
will do it all over the state. We will
launch it in January. We will start the program under
Nimmakuru first project under the proof of concept.
Now there are four births,
they will continue, whatever the estimates
are, now there is no need to increase it, in
my opinion, anyway, I will review the
connection to the water court, the
industries should come in connection with the court,
let's see what we can come up with. If
it comes, it
will be picked up immediately under anchor industry. If as an alternative,
we will work out what else to do.
Is it enough? If it is still necessary,
if there is a possibility to acquire land, then we will
do it all. We will plan all the ways.
It will be very much.
Now you have seen the National Highway has come
because of that it has become easy. Tomorrow if the
railway line is coming up to Raypalle, the connectivity will
be easy. In this way
we need to do all these things by connecting Machilipatnam.
If it is good, they
will come automatically, Sir, there
is an MP next to you. Let's work out that for Bhogaraju Patta Sita Rao's building
in the past.
They are taken below and are unusable.
What kind of estimated cost did
they go to and build? You
didn't talk then, sir,
I asked you, sir, we asked
you, sir, you are all worried, because I am a
national media, because I don't carry about
everything, I don't even talk to you.
You also didn't come out of the house.
We can't stop it, what should we do about it? We will definitely
take action. Not for this. We all
fought. You fought. We also
fought. We all fought. Of course,
I am open-minded. I will
bring information.
Other
Ambedkar as any government definitely
I understand what you are saying it has
come to a situation of looting people's property at will it is not correct what should
I do sir this is 100 years
ago I told this very much
you should save this one of the best college
this is this
it will be nationalized immediately state The
government will take it, we will
take it, we will take it forward, we will take it, not even nationalize it,
not even a private college. Let's
remove it. Thank
you. Okay. Greetings to all.
Today,
when I came here to do programs in Swachh Andhra Pradesh, you saw that there are
four
roads and four roads at the junction. There are piles of piles of piles of piles of
garbage. There has
been a situation of 85 lakh metric tons of dry garbage and dry waste. This is very
bad. I have told you many times
how much the administration
has corrupted the people of the state. At this time, while programs are being done under Swachh Bharat on one side and
under Swachh Andhra Pradesh,
some crores of metric
tons of waste have been generated in these five years.
If I want to understand the rules of this government, I do
not understand the rules of the government. Their
priorities can be understood from this. It is said that it will
take time,
but all the systems will be stream-lined.
Just now, I went to Machilipatnam port,
I saw the port and
came for a surprise inspection.
This project should be completed in PP model at a cost of 3669 crore rupees. It
needs to be completed by October 2025,
but the works are 26% has been completed so far
24% works worth
865 crores of rupees have been
completed. I will
call the developer of Repondo and
tell him strongly that in any situation we will
speed up this project to complete it by 25.
In this also when I
went there I saw that a note was also given that the
government land should be given 20 32 acres
one six acres 36 Cents
should be acquired and the total should be given to this project for 38
acres and 36 cents. I
told the collector that the work will also be
completed immediately.
After this, the total
starting four husbands will come here.
Ultimately, there will be a possibility to go up to 16 in the master plan.
In the final project,
3600 296 acres of
land will also be completed. It
needs to be speeded up now.
It should be speeded up completely and
again if this project is completed,
Machilipatnam will have an opportunity to contribute to development.
Secondly, this is the capital
port. If it is
done, it will be very useful not only
for the people of this area but also for the capital.
I am
giving instructions to the collector, but if there is no
raw material or facilities on fast track for this project, we are making it
a responsibility to complete all the necessary facilities and complete it within the planned time. It is
possible to develop it under container port but from Nagpur or
from Telangana or from Telangana but there
are possibilities to integrate it under dry port. There are various opportunities. Not only
in our state but also in the neighboring
states which have land, we
will make this port
as a good port ultimately. We
said that we want to develop it and we will do it,
and I told the city earlier that we
have a commitment to all those works, we
will definitely do it.
This is briefly with the intention of emphasizing more about this port. If
I start the port today they
have changed the port that started but now
I don't want to disturb it again
it will be destroyed the destruction done that day
can't be repeated again in any situation we
will complete this continue this project will be completed
ppini industries
whatever p4 that is also a record We are doing it
now we will take up
that town in the first phase we will take up that town and again we
will do it all over the state we will
launch it in January we will start the program under
Nimmakuru first project under proof of concept the
project
estimation is now four births
they will continue whatever the estimates
are also there There is no need to raise it now,
my opinion is anyway I
will review it.
Industry should come in connection with the court.
Let's see what they can come up with.
BPCL has also given proposals. They should
also give
a report. If they come, there will be clarity. If they come, it will
be picked up immediately under the anchor industry. We
will also work out all that, is it
enough, if it is still necessary,
if there is a possibility of land acquisition, we
will do all that, whatever we need, we will plan all the ways.
Yes, tomorrow, if the
railway line is coming up to Raypalle,
connectivity will be easy. In this way,
we need to do all these things by connecting Machilipatnam. If
six lines are needed,
if not all six, then eight will be.
For Gari's building, they
also spoke in religion, let's
work out that too, it fell on the corner again,
ok, it fell on the corner, take it once,
they are YSR CP, they have
taken our court's police land out here and
built it, sir, their office has built it everywhere so far.
The situation is that what kind of estimate cost was originally
built? Is it a
private contractor? I planned to
propose from the government.
What about the original?
Did the permission was taken from you or the
municipality gave the permission? Who
gave the permission? Who gives the permission to construct? We
asked him,
sir, you are all angry, sir, because
I am a national leader, because I don't
carry everything, I
don't even talk to you, you also didn't come out of the house. We will
definitely
take action, no, not for this,
we all fought, you fought, we also
fought, we all fought, of course,
I am open minded, I
will bring information,
how those buildings were built, they were also
told, it was us, something else,
Ambedkar, any government, definitely,
I am you. I understand what is being said, it has
come to a situation of looting people's property at will. It is not correct. What
should I do? Sir, this is 100 years
ago. Let's
take it,
not even nationalize it, not even a private college. If
governments come, it's
under endowment. Again, we'll take it from the state. We
'll develop it
all. If there's benami, we'll also remove all the people. We'll
clean it up. Again, we'll develop
it in a way that remembers to give first.
Okay, it's an endowment, so we'll
remove it immediately. Thank you.
Okay, hello to everyone
today. When I came
here for programs to be done in clean Andhra Pradesh,
you saw here,
four
roads, four roads, heaps, heaps, heaps, heaps, heaps, heaps, heaps, piles, piles, piles, piles, piles, piles, piles, piles, piles, piles, piles, piles, piles, piles, piles, piles, piles, piles, piles, piles, piles, piles, piles, piles, piles, piles, piles, piles, piles, piles, piles, piles, piles, piles, heaps, heaps, heaps, piles, heaps, piles, heaps, piles, piles, piles, piles, piles, piles, piles, piles, piles, piles, piles, piles, piles, piles, piles, piles, piles, piles, piles, piles, piles, piles, piles, piles, piles, piles, piles, piles, piles, piles, piles, piles, piles, piles, piles, piles, piles, piles, piles, piles. There is a
situation where there is dry waste.
This is very
bad. I have told you many times
how much the administration has
corrupted all the people of the state. At this time when programs are being done under Swachh Bharat and
under Swachh Andhra Pradesh, in
these
five years, a few crores of metric
tons of waste have been generated and
stored everywhere. What I
want to understand is that I don't understand the rules of the government.
Their priorities
are understood based on this. If we are to
clean all these things in the future, we will have a situation where it will
take one or two years.
But for the cleaning,
future programs will
take more time.
However, all the systems will also be stream-lined.
Just now, I went to Machilipatnam port, I
saw the port, and I came for a surprise inspection.
This project should be completed in PP model at a cost of 3669 crore rupees.
865 crore rupees work has been
completed
tomorrow I will call the developer of Ellundo and
tell him strongly that in
this situation we will
speed up this project so that it
will be completed on the 25th. In this also when I
went there I saw that they also gave a note that the
government land should be given 32 acres and
a six acre 36 cents
should be acquired. Together we have to
give 38 acres 36 cents for the project and that too I
told the collector that work will also be
completed immediately
after this the total
starting four births will come here.Ultimately there
is a possibility to go up to 16 in the master plan.In the final project we
also
need 3696 acres of land.It will be speeded up now.
If this project is fully speeded up and completed again,
Machilipatnam will have an opportunity to contribute to the development.
Secondly, it is the capital
port. It is a port close to Amaravati. It is
possible to reach here in 45 minutes to an hour. Therefore, if this port is
developed in all ways, it will be
very beneficial not only for the people of this region but also for the capital. When a
useful situation comes, they will
make a stream line for that, either
external roads or the same as what they need here, such
as making a stream line in the Police Training Center, or water supply,
some of these are also pending.
Secondly, they said that there is a shortage of sand. If
they don't have the raw material or the facilities they need in fast track, we are making it
a responsibility to complete it within the planned time.
Either from Telangana
or from Telangana but there are opportunities to
integrate it under dry port. There are
various opportunities not only in
our state but also in the neighboring
states which have land.
Ultimately we want to develop this port
into a good port.
I told you earlier that the city
has the commitment of all those works, we
will definitely do it. This is briefly with the intention of emphasizing more about this port. I
came to you once again, but you could not
come. Many movements have been made for this over
the years.
Even though it has been changed, now
I don't want to disturb it again. It will
be destroyed. The destruction done that day
cannot be repeated again. In any case, we will complete this project.
Continue. This project will be completed.
What are the PP4 industries?
In the first phase, we will take up that town and then we will
do it all over the state. We
will launch it in January. We will start the program
under Nimmakuru first project under proof of concept.
Now there are four births and they will
continue. Whatever the estimates
are, there is no need to increase now.
I will review the
industries should come in connection with the court and
we will see what they can come up with.
BPCL has also made proposals now. They should
also give a report. If
they come, then there will be a clarity. If they come, it will
be picked up immediately under the anchor industry.
If necessary we will
acquire land and if there is opportunity we will
do all that. Whatever we need we
will plan in every way. Industrialization is very
necessary. Even when we are chairman,
then what is happening now is that if the
port comes first as the main, this will be very much. If it
also comes,
connectivity will be easy. In this way,
we
need to do all these things by connecting Machilipatnam. If
six lines are needed, if
not all six, then eight will be. Tomorrow, if the
port comes well, all these
will come automatically. Sir, there is an MP next to you.
Let's work out that too, it is a little bit
cornered again. Ok,
they YSR CP
took one of our court's police land and
built it here. Sir, their office has
built it everywhere so far. They have taken two acres there and it is
useless.
What kind of estimate
cost did they go to them and
build it? Private contractor
land to
proposal from the government, what about it,
did they take permission from you or did the municipality
give permission, who gave the permission, who gives the
permission to construct?
I am a
national media because I don't
carry everything, I
don't even talk about you, you didn't even come out of the house, if
you had come on everyone since then,
if you had fought so much, would you have stopped
it?
No, we all
fought, you fought, we also
fought, we all fought, of course,
I am open minded, I
will bring information,
how those buildings were built,
what should we do with them?
Doche
situation is not correct what should
I do sir this is 100 years
ago I told you a lot this is
one of the best college this is one of the best college
this should be preserved it
will be nationalized immediately state govt will take it
away we will take it and take it forward in any way
not even nationalize it private college too
No, this is government property, it
is in endowment. Again, we will take the state and
develop it. If there are benami, we will
also remove all those who are benami. When I
came here, you saw here,
four
roads, four roads, heaps, piles,
piles, piles, piles, piles, piles, piles, piles, piles, piles, piles, piles, piles, piles, piles, piles, piles, piles, piles, piles, piles, piles, piles, piles, piles, piles, piles, piles, piles, piles, piles, piles, piles, piles, piles, piles, piles, piles, piles, piles, piles, piles, piles, piles, piles, piles, piles, piles, piles, piles, piles, piles, piles, piles, piles, piles, piles, piles, piles, piles, piles, piles, piles, piles, piles, piles, piles, piles, piles, piles, piles, heaps, heaps, heaps, heaps, heaps, heaps, heaps, heaps, heaps, heaps, heaps, heaps, heaps, heaps, heaps, heaps, heaps, heaps, heaps.
I have told you many times
how much the administration has corrupted all the people of the state.
At this
time when programs are being done everywhere under Swachh Bharat and under Swachh Andhra Pradesh, they have generated
a few crores of metric tons of
waste in these five years and stored them everywhere.
What do you mean by this government? It does
n't happen that their preferences
are understood based on this and I am
very serious about it and
all this in the future