Abonnez-vous à la chaîne ! https://bit.ly/47Vhx2q Viaduc de Millau : le pont le plus haut du monde ! - C'est pas sorcier [Intégrale]
Fred, Jammy et Sabine prennent de l'altitude pour nous présenter l'un des chantiers les plus impressionnants de ce début de 21ème siècle : le viaduc de Millau. Il enjambe depuis peu la vallée du Tarn sur 2,5 km de long et surtout à 250 mètres de haut. C'est le plus haut viaduc du monde !
« C’est pas sorcier », le magazine de la science et de la découverte présenté par Fred, Jamy et Sabine. A bord de leur camion laboratoire, les trois présentateurs nous emmènent vers des sites insolites et spectaculaires pour nous expliquer le monde qui nous entoure.
Yes, yes, thank you very much.
Thank you very much, yes, yes.
Great!
What are they saying?
We're invited to spend the weekend in Spain.
Oh, great!
Where is Fred? We're leaving right now.
He's not here. He told me he was building the bridge.
No, I'm not building the bridge.
I'm building a bridge, or more exactly, a gigantic viaduct.
Come join me. I'm in Millau, in the Aveyron.
You know, in the south of France.
Come on!
OK, Millau.
It's on the road to Spain.
Exactly!
Come on, Marcel, go!
To Millau!
I'm here, Jamy.
I took a bit of altitude.
I'm just above the city of Millau
and I'm going to show you one of the most impressive construction sites
of this early 21st century.
Millau's viaduct.
It spans the Tarn Valley for 2.5 km long
and is 250 m high.
It's the highest viaduct in the world.
Wow!
And seen from above, it's even more impressive.
The bridge will connect the mountain,
which is just below what we call the Red Cross,
to the Larsac plateau on the other side of the valley.
And all this is just a few kilometres from Millau.
Ah, Millau, on the road to the south.
Here, in the Aveyron department.
You just have to pronounce this name
and it's already a bit like a holiday.
I'm not going to do it for everyone.
Let me explain.
For years, the vehicles that wanted to connect
northern Europe to Spain
didn't have a choice.
To do all this without leaving the motorway,
they had to go through the A6 motorway,
then the A7 motorway,
and then go west again through the A9 motorway.
In short, make a hook.
To avoid this detour,
there's only one solution.
Take the A71 motorway,
then the A75 motorway.
But in these conditions,
they had to consent to taking the motorway
at the level of the Tarn,
at the height of the city of Millau,
and expose themselves to endless traffic jams,
especially during the holidays.
It happened to us.
Right, Marcel?
So, to avoid the hooks and the traffic jams,
the state decided to complete the A75 motorway.
And as the goal was to avoid isolating the city of Millau,
well, the Tarn was crossed
near the city of Véronaise,
at a place where the valley stretches
over 2.5 km,
which explains the length of this bridge
and its height of 150 m.
Before deciding to build this bridge,
there were a few years of reflection,
because the motorway had to cross magnificent landscapes.
Once the route was chosen in 1989,
it was necessary to find the best solution
to cross this huge valley of the Tarn.
And that was not an easy task.
The first idea we had
was to wedge the motorway
into this small valley,
which is called the Saint-Marc Valley,
to rest on the edges of the Tarn,
on this cliff,
and to go up via a viaduct
and then go back up through a tunnel.
It was this solution
that gave us the idea
to go directly from one cliff to another.
To meet this technical challenge,
a competition was launched.
Very different forms were proposed,
such as this entirely metallic viaduct.
But the jury finally chose
the project of the English architect,
Lord Norman Foster,
and the French engineer, Michel Virlejeux.
In December 2001, construction began.
Trucks and cranes invaded the valley.
These titanic works had to be completed
in just three years.
A deadline so short
that several hundred workers
had to be hired to manage the site.
Before starting to lay the viaduct platform up there,
that is, where the cars will run,
batteries had to be built.
In total, to cross the valley,
there are seven that are 342 m away from each other.
And to make the site move much faster,
they were all built at the same time.
That's why we multiplied by seven
the number of teams and the number of cranes.
As a result, in just a year and a half,
all the batteries were built.
And it's solid.
Each of them rests on a sole
that is five meters thick.
Can you go, Jamy?
It's concrete!
And again,
it is only the visible part of the iceberg.
Indeed, under each sole,
four wells have been dug
to reach the rocky base.
These wells can reach 18 meters deep.
Then they were filled with concrete
and in this way,
all the weight of the batteries and the platform
rests on the rocky base,
which allows to anchor the work
on an extremely stable base.
And now I present to you
the nail of the site.
No!
Yes, yes, the nail.
It's the highest battery in the viaduct.
Bear in mind that it measures 245 meters high.
It's even the highest battery in the world.
Incredible!
Wow, it's really high!
But Fred, where are you?
Did you see that, Jamy?
It's curious.
The batteries are hollow inside.
It resonates!
And then they put ladders to visit.
Come on, let's go for 245 meters.
I wonder how they did
to build such high batteries.
Well, contrary to what one might think,
these batteries are not mounted
from prefabricated elements, no.
They are poured on site,
bit by bit,
by successive slices
of four meters in height.
In the jargon, we speak of lifting.
A mobile formwork system
acting as a mold
allows progress in this way.
When a slice is dry,
the workers install
metal fittings,
called cages.
Then the formwork
goes up along the battery.
Those placed outside
slide on the rails.
Those placed inside
go up
by a crane.
Once the device is adjusted,
the concrete is poured
inside the formwork.
So, of course,
you're probably wondering
why we use so many
metal fittings.
Well, it's because concrete
is a material that resists
compression very well.
However, it resists
traction and chiseling
very badly.
And only a metal fitting
allows it to hold up.
Let's go back to our battery.
Once the concrete is dry,
the workers install
a new cage
with waiting posts.
Then they move the rails.
The formwork goes up by 4 meters.
And we start again.
So, Fred, where are you?
Have you reached the top?
Are you kidding me?
I'm not up there yet.
Here we are at the place
where the battery doubles
to form a fork.
This way, the formwork
will have two points of support
to rest.
I still have at least 90 meters left.
Come on, I'm going on.
Wow, that's impressive.
Did you see that?
To be able to work,
they hung huge scaffolding
on top of the batteries.
I think it's over there.
Oh yeah, I'm just below
the formwork.
One more little effort
and I'm there.
And here I am, Jamy,
I'm at the top.
I'm on the highest battery
in the world.
Now I'm going to show you
how to position the formwork.
It must be very precise,
obviously, so that the battery
is perfectly even.
And this positioning
is done by satellite.
It's incredible.
Hi Lionel.
Hi Fred.
So explain to me,
what is this device?
This is the GPS cane
that allows us to control
the formwork
to have a good position
of the battery.
Does it give you a positioning?
A positioning with coordinates.
Okay, which are displayed here.
Exactly,
with a precision of 5 millimeters.
5 millimeters of precision,
do you realize that?
And this setting is done
by satellite
on several points of the formwork.
Because a formwork
is made up of different plates
that fit together like a puzzle
to give shape to the battery.
And the position of each of these plates
must be very precise
so that the lines of the battery
are perfectly even.
But the engineers
ran into another problem.
One of the problems
that we quickly posed
before starting
the execution of these batteries,
we said to ourselves,
these batteries are exposed
to the sun on one side
and are in the shade
on the other side.
So they will tend
to expand.
That is to say
that the battery
on the heated side
tends to move
and be shorter
on the side
that is in the shade.
The battery tends
to follow the sun
and to rotate
like a turntable.
So we anticipated
this phenomenon
to try to adjust
our formwork
in the best possible conditions.
So it's good,
everything is well adjusted?
Okay,
come on,
send the concrete.
There you go.
The beams are recovered
on the ground
by the crane
that drags them to the top.
It takes a whole day
of concreting
so that the battery
grows by 4 meters.
Once finished,
we reassemble
the formwork
and the planks
and we move on
to the next step,
the masonry.
To lift
these huge batteries,
it took hundreds
of thousands
of cubic meters
of concrete
produced in a factory
specially built
on the site.
And be careful,
it's haute cuisine.
We mix the ingredients,
gravel,
sand,
cement
and of course water
by following
a very precise recipe
because it gives the concrete
not only its resistance
but also its color.
And this color
was chosen
so that the work
fits best
in the landscape.
In the end,
the 7 batteries
were completed
in time
by beating
the highest kiln record
in the world.
And all this
was worth
a superb fire
of artisism,
wasn't it?
It's beautiful.
Oh,
it's very high,
tell me.
Fred,
where are you?
Where are you?
Here I am.
I'm here,
the little voice.
I'm happy.
I arrived at the top
of one
of the highest
cranes
on the site,
about 250 meters
high.
So,
in principle,
a crane
does not exceed
89 meters.
But here,
for it to hold well,
look down
what we did.
Well,
we fixed it
on five different points,
we fixed it
to the battery.
So,
well,
in principle,
this crane
holds perfectly.
However,
the structure
bends a lot,
especially when
the arrow moves
to go get
the charges.
So,
it's not over
because now,
to go see the crane,
you have to climb the ladder.
How high is it,
Philippe?
Another 20 meters.
Well,
another 20 meters of ladder
and we're there.
No.
Let's go.
How are you,
little voice?
Do you have vertigo?
Absolutely not.
So,
you'll see,
it's amazing,
we're really
well equipped here
because the crane
still goes
seven hours in a row
on top of its crane.
So,
here,
there's a small room,
a small dining room,
let's say,
with a coffee maker,
with a microwave.
Some people also
sometimes put
the television.
Here,
there are toilets.
Well,
it's more practical
when you spend
seven hours here.
And here,
you go down
completely
above the void
and it's
the work cabin.
Hi,
Brahim.
Hi,
Fred.
How are you?
I'm fine,
and you?
Let's say you live
at the end of the world.
Have you done many
heights like this?
No,
this is the first height.
So,
tell me,
do you ever have vertigo here?
Vertigo,
no,
but still,
we do
a few craters
from time to time.
So,
there's something
that amazes me.
How can you
at 250 metres
high?
We're helped
by guys
with radios
all over the place
and a camera
that allows us
to zoom in.
What's the heaviest load
that you can lift
with this crane?
It's 20 tonnes,
maximum load.
20 tonnes?
So,
when you lift 20 tonnes,
the arrow
has to bend,
right?
How does it work?
We have a feeling
that the crane
will prick your nose
like this,
and the arrow
can go down
four metres.
Okay.
So,
you have to have
a strong heart.
Do you mind
letting me handle it?
I'd like to make
a little joke.
Listen,
it's my pleasure, Fred.
I'll take your place.
Come on, let's switch places.
So,
I'll try to do
what you told me.
So,
here we go.
I'm going down.
I'll try to hang it
from behind.
Try it,
that's it.
I think I got it.
Yes, you got it.
Hey, hey, hey,
Fred!
We're going backwards,
let go of it,
Fred!
Come on,
it's just a joke.
Listen,
let's put it down.
Let's put it down.
let's put it down.
Oh, that's better.
Hey, tell me,
more seriously,
I'd like to know
how to mount
a crane
at the same time
as the battery.
So,
when we see
the size of the cranes,
it's true
that we ask ourselves
questions.
And we imagine
right away
the helicopter's
waltz
carrying the elements
in the sky.
Well, no.
The cranes
grow on their own.
At their peak,
they are equipped
with a slide,
this white piece.
Now,
as its name suggests,
it slides
inside the mast.
When the crane
is in operation,
the base
of this slide
is firmly fixed
at the top
of the mast.
To enlarge,
well,
the telescoping cage,
this yellow piece
that envelops
the slide,
goes up slightly.
Then,
the crane
will itself
look for
an additional element.
It is fixed
above the previous one.
Then,
the telescoping cage
goes down
and itself
is firmly
fixed
at the top
of the last piece
that we just placed.
Then,
the base
of the slide
is detached
and thanks
to a system
of cylinders
inside
the telescoping cage,
the slide
goes up.
Then,
the base
of the slide
is fixed
at the top
of the last element
that we just placed.
The telescoping cage
goes up.
The crane
has grown
of 8 metres.
While we are building the piles,
well,
you have to know
that on each side
of the valley,
we are also building
the deck of the bridge.
So,
this deck
is like
a huge
metal snake
that we assemble
to the ground
piece by piece.
So,
we start there
by welding
the metal boxes.
This is the
backbone
of the deck.
Then,
we will add
the side boxes.
So,
it will enlarge
the bridge
and it is on these
side boxes
that the cars
will be able
to move around.
Then,
we give a little
paint job
and finally,
we install
all the equipment
such as
the safety barriers
or the windscreen.
And that's the job.
Here,
our deck is finished.
We just need
to add
the bitumen.
Follow me.
Did you see that,
Jamy?
When the bridge
is finished,
we will be able
to cross it
inside the deck
and make
maintenance
or maintenance
Here,
there are 36,000 tons
of metal.
How many times
does the Eiffel Tower
Four times
the weight
of the Eiffel Tower,
Fred.
And yes,
all the elements
of this deck
are built
in an Alsatian factory
in Lauterbourg.
Here,
huge steel plates
are delivered
to be cut.
This factory
must have been
completely reorganized
and modernized
to meet
the delivery deadlines
imposed by the factory.
Once welded,
the pieces
are transported
by exceptional convoy
to Millau.
They are unloaded
at each end
of the viaduct
at the level
of what is called
in the jargon
the culées.
These are actually
the two anchoring points
of the deck
with the mountain.
So there is
the south culée
and at the other end
the north culée.
On both sides
of the valley,
there is a factory
where the workers
assemble the metal elements
made
at the factory.
One by one,
these plates
are welded
to the central case
to form
the four
circulation routes.
And a slice
of the deck
is one.
It is a real
giant mecano
2.5 km long
on which
cars
and trucks
Hey Jamy,
I am the king
of the world!
But what are you doing
Leonardo?
Are you taking
the large or what?
Exactly.
We are going
to take the large
because once the deck
is finished
or partially finished
we are going
to make it cross
the valley.
In fact,
we are going
to make it slide
progressively,
stack by stack
at a speed
of 6 m per hour.
The deck
will move
171 m
per month.
Isn't that
incredible?
Yes,
but to make it slide
we have to
take some
precautions.
Indeed,
if we just
pushed it
from the culées,
because of the friction
the deck
would tear
the supports.
Fortunately,
thanks to the translators,
pieces placed
on supports
themselves
fixed to the piles,
the deck
can move
without
encountering
any resistance.
How?
Well,
look for this mark.
At the beginning,
the deck
is at this level.
The translators
are made
of two wedges
designed
to slide
one on the other
thanks to a
slight slope.
They are moved
by wheels.
The first wheel
pushes
the first wedge.
The second
lifts
and lifts
the deck.
Now,
there is no more
contact
between the deck
and the pile.
The second
wheel
pushes
the second
wedge.
The deck
moves forward
and the wedges
return
to their
initial position.
The deck
moves forward
by 60 cm.
In fact,
there are four
translators
per support.
They all work
at the same time
which allows
the entire deck
to move forward
regularly
by successive steps
of 60 cm.
The problem,
Jamy,
you will understand,
is that between
two piles,
there is exactly
342 m.
So,
as we push
the deck,
it will have
a tendency
to pinch the nose.
That's why
we installed
temporary pylons,
what we call
pallets.
This is what
we see here
in red.
This way,
there is twice
as little
way to go.
But do you realize
what a job!
Everybody ready?
Let's go
for a launch,
as they say over there.
Look,
the deck is moving.
Yes!
Let's maybe
speed it up a bit.
The operation
is very precise.
All translators
are controlled
by a central computer
to be perfectly
synchronized.
And here,
there is not really
the right to error.
A small misstep
would risk
destroying the piles.
So,
shh,
maximum concentration.
In total,
a launch phase
lasts about
three days
to link
two successive supports
171 m away.
Are you following me?
Once the operation
is finished,
back on deck
to rebuild
171 m
of deck.
That's it.
And so on.
What a job!
It's the first time
we are moving
such a mass
over such a length
of mass,
such a width.
A complete work,
painted,
which is set
at an altitude
of 245 m
for the largest pile.
So,
it's an exceptional
it's a very
endearing work
and everybody
works
so that
this work
is in place
at the right date
and without problems.
This new
launch system
was specially
designed
for this site.
Thanks to it,
the two parts
advance
one to the other
to join
more than
250 m
above the tarmac.
Ah yes,
indeed,
you have to aim well.
And that's it,
it's finished.
Champagne for everybody!
Bravo, gentlemen!
As it is
being built
and when
it is finished,
the deck
is firmly
attached
to the piles
which are below
with big cables.
Oh,
it's moving a bit!
Hi, it's me!
So,
this operation
is called
the nailing.
But to show you
what it looks like,
I have to go
under the deck
and get into
the pile
over there.
Here we are!
So,
did you see?
On each pile
there are 16
big cables
like this
which are
stretched
and deeply
anchored
in the concrete.
So with that,
it shouldn't move
in my opinion.
Well,
you're wrong, Fred.
Even with that,
a deck moves.
Under the effect
of the heat,
it expands
and under the effect
of the cold,
on the contrary,
it shrinks.
And as this deck
is firmly
attached to the piles,
well,
depending on the weather,
the piles
deform.
So not all
in the same way
since the material
expands
in the direction
where there is
the extremity
of the deck
where there is
the most deformation.
Consequently,
the piles
closest to the piles,
P1
and P7,
deform the most.
Here,
this one,
for example,
can move
60 cm
in one direction
as in the other.
Do you realize?
1.20 meters
of impact.
Tell me, Jamy,
if the deck
shrinks
because of the expansion,
will there be a hole
between the bridge
and the road?
No,
because the builders
have placed
what are called
expansion joints
that follow
the movements of the deck.
In winter,
when the deck contracts,
the joints stretch.
In summer,
when the deck expands,
well,
on the contrary,
the joints contract.
But there is not
only the expansion
of the deck
that must be monitored.
And yes,
the viaduct
must also face
sometimes very violent winds.
Before the design
of the work,
the engineers
of Météo France
placed a model
of the Tarn Valley
in a hydraulic channel.
The movement of the water
simulates the flow
of the wind
around the work.
It was thus possible
to dimension the piles
and the deck
according to the wind
at which
they would be subjected.
Additional studies
in the wind tunnel
were then carried out
to modify
the shape
of the deck
so that it can
withstand
winds
of 200 km per hour.
Ah yes, Jamy,
I had forgotten
a detail
for the solidity
of the bridge.
Above each pile
that carries the deck,
they added
a pylon
that is 90 m high.
These pylons
allow
to stretch
high benches,
that is,
huge metal cables
that are solidly
anchored
in the deck.
Without this,
the deck
would risk
deforming
or collapsing
under its own weight
and under the weight
of the vehicles.
Because we must not
forget
that there is
still
a gap
of 342 m
between each pile.
It's huge!
And yes,
this huge
gap
the high benches
to recover
the forces
and transmit them
to the pylons
that transmit them
to the piles.
And in this way,
the deck
cannot bend
under the weight
of the vehicles.
In total,
to recover
all these forces,
there are
11 high benches
on either side
of each pylon.
And once
all the pylons
and high benches
are in place,
the loads
are then
evenly distributed,
the temporary
load
is then
And from up there,
you have a view
of this pretty
little village
whose inhabitants
have a view
of the Viaduct.
It's true
that it takes up
a lot of space
in the landscape,
even if everything
has been done
to reduce
the number
of piles
and refine
the deck.
It is visible
from all the
corners of the valley
and in particular
from Milleau.
Obviously,
it changes the scenery.
This was before
and here it is
today.
So, boys,
are you done
with this bridge?
Because we are
always waiting for it
in Spain.
It's moving forward,
it's moving forward
very well.
Do you want us
to finish this bridge?
Yes!
You can go
to Spain!
Extraordinary!
Let's go!
Great!
Let's go!
Let's go, Marcel!
Zou!
On our way
to the big crossing
and thanks to this viaduct
we can now cross
the valley
in less than 20 minutes.
But don't forget
your wallet.
Crossing
is not free.
In summer,
you have to pay
a little more than
6 euros for a car
but for you,
Marcel,
with your truck,
it will be
a little more
than 24 euros.
It's the price
to ride on
the highest bridge
in the world.
Imagine,
343 meters,
almost 20 meters
more than the Eiffel Tower.
Wow!