【精彩】潘焯鴻:23條立法前 我度假踢爆! #Lucy連線

《看中國》香港頻道
2696粉絲
5 次觀看·2024年2月23日
🔥請加入乾净世界 https://www.ganjing.com/zh-CN/channel/1f6j576aqao3taCY3b7gv3NXG1540c<br>🔥請加入我們的Patreon,http://www.patreon.com/visiontimesHK<br>🔥請首選Stripe捐款:https://www.secretchina.com/kzgd/donate.html<br>🔥請加入榮譽會員: https://www.secretchina.com/kzgd/subscribe.html<br><br>香港巨變、新聞自由日益收窄,同香港人一齊經歷過槍林彈戰嘅我哋,國安法後要面對更多嘅挑戰同打壓,加上FaceBook Youtube等嘅種種限制、黃標甚至關閉,「報導真相,揭露邪惡」變得越嚟越艱難。<br><br>不過,無論前路有幾咁艱難險阻,我哋永不忘初衷,荊棘路上繼續為大家深挖真相,還公民知情權!<br><br>感謝你哋一路以來嘅不離不棄,請繼續支持我哋,加入我哋嘅Patreon,成爲我哋嘅榮譽會員,願榮光早日歸於香港!<br><br>本視頻僅代表嘉賓或受訪者本人觀點。<br><br>聯絡我們 [email protected]
On November 28, before the Office of Housing and Rural Development approved the introduction of the Wei-Nam-Tung case,
did the Office of Housing and Rural Development approve all the applications?
This is a very simple principle.
After the Office of Housing and Rural Development completes the engineering project,
it is necessary to inspect the building.
This is called OP inspection.
Sometimes it is called 13 or 14.
Let's see if it is TOP or OP.
This inspection itself needs a basis.
The basis is based on the land,
the building regulations,
and the requirements of each department.
The Office of Housing and Rural Development should approve,
including structural layout,
structural design,
architectural layout,
GDP total,
and other conditions that meet the requirements of the land.
The application will be reviewed in the form of a drawing.
The Office of Housing and Rural Development will conduct a real-estate inspection,
which must be based on the drawings that have been reviewed,
comply with the law,
comply with the requirements of the land,
and comply with the requirements of the relevant departments.
That is to say, when the Office of Housing and Rural Development goes to the land,
it should hold a drawing,
which is the actual drawing of the building.
The drawing should comply with all the laws
and all the design regulations of the land.
That is to say, when the Office of Housing and Rural Development goes to inspect,
in theory, the last drawing of this project
should have been approved.
It is impossible for it to appear
that you have issued an OP,
that you have issued an entry permit,
and then re-approve the drawing.
I have asked the Office of Housing and Rural Development
about this procedure in the process.
The Office of Housing and Rural Development did not dare to answer this email.
In fact, I know what happened when they did not dare to answer the email.
If you pay attention to my Facebook page,
I once asked the Office of Housing and Rural Development to answer the email in public.
The Office of Housing and Rural Development immediately gave me the email,
saying that the surveyor was on vacation,
so he could not answer the email.
Then another superior replied to me within a day.
At that time, the superior replied to me that
before issuing the OP,
that is, before issuing the entry permit,
all the drawings had been approved.
But we found out that
after the entry permit was issued on November 28,
there were still drawings to be revised and approved.
In this process,
in the land search document,
there was an entry permit pending
in the land search document.
Of course, there are many reasons for pending.
When the entry permit is written,
it can also be pending.
If you write the wrong number 44,
or the wrong name of the institution,
or a lot of documents,
you can also have this entry permit pending.
But I suspect that this is related to the approval of the drawings.
Because in theory,
you have not approved all the drawings,
so it is impossible to do the inspection based on the drawings.
Because of this,
it is impossible for you to issue the entry permit to Wai Nam East.
Anyway,
after the pending,
it may be that the House of Commons
approved the drawings in the process.
Then we found the drawings.
The drawings are suspected to be related to GDP
and smuggling.
If these two items
are enough to prevent the House of Commons
from issuing the entry permit on November 28.
In addition to the entry permit,
we also found the key points
in the design of the whole item
on the land registration terms.
The key point is
around Dong Yuan Street.
In this land registration,
it is also in the area of land development
on the east bank of Wai Nam.
In fact, it is between the stone mill
and the second building
between the east bank of Wai Nam and the second building,
a pedestrian crossing facility is built.
If this pedestrian crossing facility is built,
the stone mill
will not be able to operate.
If the residents of Wai Nam East Bank
or the neighborhood
look down,
it is best to be wet now.
Because when the stone mill cars come out,
their tires are covered with water and mud.
So there will be a very clear track
on the road surface.
Now I count,
there are a total of
nine car passages in this stone mill.
Three are located on Dong Yuan Street
facing the other building.
The other six are located
at the intersection of Dong Yuan Street
facing the second building
on the east bank of Wai Nam.
These six entrances,
including the last one,
I noticed that
they usually enter Ying Lai.
Because the Ying Lai car is particularly large,
the curve at the end
is particularly large.
That is, the radius or diameter is particularly large.
So it must use the sixth entrance
to enter Ying Lai.
This road is directly
stepped into the street of Wai Nam East Bank.
I am not talking about the road.
It is directly stepped into the road
of Wai Nam East Bank.
It's very simple.
If according to the map,
according to the terrain,
and then because of the terrain,
and the map of the road,
in fact, between this stone mill
and the second building in Wai Nam East Bank,
a pedestrian crossing installation
is also called a triangle island.
In the middle of the road, there is a triangle island.
At the end of the road, there is a one-in-one-out.
This is for pedestrians to cross the road.
But if this installation is easy to build,
the process of building
will hinder the entrance of the
six entrances of the stone mill.
It is impossible to enter.
If it is easy to build,
look at the road
where the stone mill
is now,
it will block
the entrance of the six entrances
of the stone mill.
Or if you want to get out of the car,
you have to keep
turning the steering wheel to pass.
For this special
large English car,
is it possible to enter the area of the stone mill?
I don't think so.
Because the road is
exactly on the track
of the large English car.
If you build it,
it can't get through.
The car can't get through.
That is to say,
if it is built according to
the requirements of the land registration,
that is, between the stone mill
and the second building,
the stone mill will not be able to operate.
Because the vehicles
including the English car
and the stone car
are not able to pass.
That is to say,
it is easy to build a one-in-one-out
to block the entrance of the six entrances.
This is extremely strange.
I don't know what happened.
What is the problem in the middle?
We found a special design
of the R6.
This design also shows
that in the land registration
of the Wai Nan East Coast,
there is a decision
and a design for
the requirement of the road.
The second building
and the stone mill
have to build a one-in-one-out.
The third building
has not been built yet.
If it is not built yet,
the Land Registration Office
will not issue
a Certificate of Compliance.
In fact,
the Land Registration Office
will not issue
a Certificate of Compliance
on December 28,
less than 28 days
after the OP.
Because there is a Christmas holiday
in Hong Kong,
it is absolutely rare
and very urgent
to issue a Certificate
of Compliance.
In general,
any project,
even if it is so large
and large-scale
and has the status of江湖,
it may take at least
three to six months
to get the certificate
after the OP.
There are a lot of procedures
and documents to check,
and a lot of departments
are involved.
But the Wai Nam Dong case
is very unique.
It took more than 20 days
to get it done.
I believe this is the
first speed in Hong Kong.
In the process of speed,
if you do everything right,
no one can blame you.
Now we see
that the Wai Nam Dong case
does not exist.
It seems that
the Road Administration
used the Terms Contract
to build another
intersection
that does not interfere with
the entrance of a car.
This is very important.
This decision
has two effects.
The first effect is
that it is not easy
to issue the consent form.
But the consent form
has been issued.
So I think that
in addition to the entry
and exit documents,
the consent form may also
have procedural justice.
This is a matter of officials.
On the other hand,
why not build it?
If it is built,
it can become a waste.
If there is no car entrance,
it will be used to supply
the car to other places.
If the car can't
enter the parking space,
it can't be operated.
But the problem is
when I went to the Wai Nam Dong case,
I saw that the car factory
was constantly upgrading its factory.
It didn't want to give up.
It kept upgrading
to improve the factory.
At the same time,
someone facilitated
a key road
for the car factory
to continue to operate the car factory.
If at that time
the developer of the Wai Nam Dong case
or the General Construction Company
or the relevant government departments
were looking at this document
and asked the developer
to build a pedestrian crossing,
the residents of
the entire Yau Tong East
do not need to be
disturbed by this car factory.
This car factory has been abolished.
It can no longer supply the car.
Because the road it needs
is blocked by the pedestrian crossing.
But why did the pedestrian crossing
disappear?
Why did it still appear?
I personally think
this is a big incident.
It is not related to the National Security.
However, it is related to the five mines,
including Hwa Ying.
Hwa Ying is a branch of Zhejiang Construction.
Zhejiang Construction and the five mines
are all related to the state-owned enterprises.
Although it is related to the state-owned enterprises,
it is not related to the National Security.
Now, the transportation plant
is called China Transportation Land,
but it is a Hong Kong-funded enterprise.
It does not belong to the state-owned enterprises.
But the problem is
I will talk about this incident
next week
to let everyone know the problem.
What is the topic today?
Today's topic is Hong Kong-funded enterprises.
Hong Kong-funded enterprises are quite cunning.
Mr. Lee and Mr. Kim
may be responsible for this incident.
Mr. Lee may be responsible for this incident.
Hong Kong-funded enterprises are quite cunning.
