Hello everyone, welcome back to Mark's Home YouTube channel.
There are many of you who are watching the show or are planning to build a house,
often ask about the cost and budget of the construction of your house.
So in this video, I will show you the cost and budget of a house.
And this is also the general application method and the way we apply to build a house.
One thing to note is that when you watch this video, we should not tour,
because if you tour, it will be very difficult to understand and waste your time.
Don't forget to hit the like and subscribe button to receive more videos from Mark's Home.
Currently, Mark's Home is designing and manufacturing wallpapers across 63 provinces across the country.
In addition to the YouTube channel of Mark's Home, we also have a fanpage of Mark's Home on Facebook
with the name of the company of Mark's Home architecture and construction with more than 46,000 views.
In addition, you can also call the number of hotline phones we are showing on the screen
to contact us to get the latest information.
Now let's get down to business.
The cost of building a house depends on 4 factors,
which are the location of the land, the type of architecture, the quality of the material, and the time of construction.
With the location of the land, let's see where we are in the North or South.
Even in the North or South, each province will have a different price for building a house.
Secondly, with the location of the land, let's see if our land is good or bad,
whether it is fertile or weak,
whether it used to be close to the river or fertile land.
This will affect how we choose the construction plan.
For example, we will choose to build a bridge, a dam, a dam, or we will only build a single dam or a dam.
Thirdly, the location of our land is on the road or in the alley.
On the road, we will construct at a different price,
and when in the alley, we need to calculate the part that we construct will be different.
Secondly, when it comes to architecture, we want to do it temporarily or permanently.
Normally, people want to build it permanently, but no one wants to do it temporarily or temporarily.
We care about the design, so we usually want to build it permanently.
Secondly, we want to do it in a modern or classic style.
In a modern style, the cost will be lower,
but if we want to do it in a classic or modern style,
we will definitely need a higher cost.
Thirdly, the type of shape we want to do is Japanese, Thai, or flat.
Usually, the cost will be arranged from flat to Japanese or Thai.
For Thai, we will need a higher cost than for Japanese and flat.
Thirdly, it affects the cost of calculation, which is the quality of the material.
For the quality of this material, we will want to use what type of sand, what type of stone, what type of cement.
This will affect the quality of the material.
In addition, it will affect the construction of the foundation later.
And finally, it's about the construction time.
This construction time will affect, first of all, the manpower,
and secondly, the price of the material.
As you know, if you build it at the end of 2019 or the beginning of 2020,
the price of the material will be lower than it is now.
Quite a lot, especially the iron.
If you work in the construction industry or if you build a house,
you will understand this very clearly.
OK, the first part is to determine the factors that contribute to the cost.
Next, we will come to the part where we will have some rules and some general formulas.
This formula is the general formula of the construction industry,
so I have summarized and given it to you.
In terms of calculation, it is about 90-95% accurate.
First of all, with apartments that we have as a basement,
the concrete level of the basement from 1 to 1.5m is temporarily calculated at 150% from 1.5m.
The basement from 1.5m to 2m will be calculated at 200%.
With a bigger basement than 2m, we will calculate at 250%.
For the floor, the unit floor will be included in the price list.
For the roof, we will calculate at 50%.
For the floor, the unit floor will be included in the price list.
For the roof, the unit floor will be calculated at 50%.
For the roof, the unit floor will be included in the price list.
The concrete level of the concrete roof is 100%.
With a smaller basement than 10m, we will calculate at 100%.
With a bigger basement, we will calculate at 50%.
And for the floor, we will calculate at 50%.
In terms of construction cost, we usually calculate that the total cost of the work will be from 3.5 to 4 million per square meter, and the building cost will be from 5 to 6.5 million per square meter.
In order for you to understand more clearly, let's go to a specific example of a house that we have designed and built.
For example, a Japanese two-story house.
First, we need to determine the location of this house to proceed with the calculation.
For example, this house will be built on a weak, flat surface.
With a house on a hard surface, we will use slabs or slabs.
On weak surfaces such as dirt or land near rivers, we should use a flat surface.
For some buildings, we will use concrete slabs.
And secondly, we will use bamboo slabs.
If you choose to use bamboo slabs, the land should be in an area with a lot of water.
Because if you cover it with water, it will take a long time.
If you cover it with water, it will take a long time.
Welding field märchandising
Welding field marketing
We will contain a number
Set to a load of 4 cm
Start welding
Total Area 177m
Total Cost 5.5M
Total Cost 973M
Total 973M plus the Plus and Minus
Plus 63x5.5
Total Cost 31.5M
Total Cost 3.2M
Total Cost 18x9m
Total Cost 250.000
Total Cost 20M
Total Cost 40M
Total Cost 113M
Total Cost 750M
This is how to calculate the cost of a project
If you want to know more about the house you want to design
You have to do it step by step