OMICRON is an international company that works passionately on ideas for making electric power systems safe and reliable. Our pioneering solutions are designed to meet our industry’s current and future challenges. We always go the extra mile to empower our customers: we react to their needs, provide extraordinary local support, and share our expertise.
_
Would you like to find out more about OMICRON, our passions, and our products?
Hello and welcome. This video is one of the how-to video series of Station Scout.
My name is Burak. In this video we will see how to test our skater design
basically HMIs and R2s without having any physical IEDs with Station Scout.
So let's have a look on our system under test before starting the test. As you see
this is a typical substation utilizing IC6150 for glues and reports. So on
the upper side you will see the clients of the substation such as a local HMI
and a gateway for protocol conversion of signals to be transmitted to control
center over 104. So in our setup today we have a local HMI running on a PC and a
Station Scout running on MBX and controlled by another PC. So Station
Scout is simulating all the IEDs in the substation to test if they are sending
the correct signals to HMI and HMI is using the correct addresses of the
signals to process, visualize and log. So the assessment here can be made visually
by observing the necessary page of the HMI. Finally Station Scout will give a
test report for documentation purposes and also you will be able to save the
same test plan for FAT and SAT as well as after firmware updates and during
maintenance tests to execute instantaneously. So how will we create
the test case? As you're familiar with the user interface of the Station Scout
simply we go to the IED where the signals are contained and click on the
plus icon in the test case tab. Then there will be another window popping up
and now here we select signal test which is our aim in this video. After that we
have simply three steps to run every type of signals to be tested. We can
import our signal list with the names in any language or we can alternatively
push some signals from the IED overview. So I will prefer in this example the
importing method for ease of use. Then Station Scout will automatically create
for you the test steps to be executed. You can modify the test steps according
to your needs. You can add or remove some of the test steps or the signals. Then as
we are used to from Omicron products to run the test is just a click to the play
button and now as last step we will check the reaction of our HMI in the
corresponding page like LEDs of pay page in this picture. In the same manner
we can test all different signals to verify the communication and correct
addressing in different page such as mimic diagram of the HMI and moreover
you can also check the command direction if it's working correctly by issuing
some commands from HMI to Station Scout. Last but not the least as mentioned you
can check different assessment destinations such as single line
diagram, enunciation LEDs on the HMI or event logs and alarms. Okay so after this
introduction we can now switch to our test setup and run the test. So I
started with loading the SCL file and now you can see the entire substation in
the zero line diagram. So it's a big substation around 70 IEDs. So as you can
imagine the scenario is now I'm at the office with my HMI and writing my first
test to check my HMI design. To create a test case for this purpose I click on
the IED that I want to create a test plan. So then clicking on the plus icon
and select signal test. Now as we are working with the simulated IEDs I should
select the option of simulate signals then here comes the part of adding
signals. So there are two ways to add signals to the test case. The first way
is I can select some signals from the IED overview like I click here some
groups that I want to push some signals out of that signal here and I can select
the mode or I can go back and select another group like interlocking and push
enable open signal. So the first way is like this and alternatively I can use
add from signal list button to add signals from a signal list. To do so I
click on it and now I switch to my signal list. So in my signal list here
which contains 6150 addresses and the names of the signals that means I can
also take the signal names in the local language to visualize them with my
custom names in the station scout project and then I see the names become
clearer. So if I click on some signals like this copy it and then paste it to
here and click on add and now signals appeared here. So now I can go to the
next step. Next step is called test steps. So here you see station scout is
offering a predefined test steps to be generated for me. So you see that all
different statuses for different data types are offered. For instance for
enumerated values we have all the statuses these are defined. For single
point signals we have a false true false cycle. For positions we offer starting
from closed and ending up with closed again. So please notice that we always
finalize the last step as the same with the first step to go back to the initial
state. This will help you later on for ease of notice which equipment is tested
and which is not yet tested. You can deselect some of the statuses that you
don't want to test as per your requirements. In the execution tab we
have only one option that station scout offers to set the values automatically
which means each state change will be made automatically by station scout to
help saving time during the test. And now we can click on finish setup to review
our test case. If you want to add additional steps you can add in between
the test steps by hovering between the steps. Now you will see a plus icon
appears. So let's assume that we want to add another test step here. I click on
the plus icon. Now I select another value here and I click always set expected
values. Now I can go back and I see that this test block the new test step has
been added. And I also noticed that there is a red asterisk which means that this
test step is modified by the user. It's added. You can also delete some test steps
if you want by clicking on the step and then clicking on the task icon. So for
the analog values if you want to test we can also add some analog value. So go
back to the measurements of the IED again. So select an analog value like
synchronization voltage running. So I can add this also test step. You see that it
appears here. And finish the setup again but before that you will see that
numeric sigmas also appeared. We don't offer any numeric sigmas but if you want
to add some desired values you can also do that via clicking on the plus icon
and setting some different values like 400 kV and again clicking on the set
expected values. Now if I go back to test case setup and scroll down all the way
then you will see that value with 400 volts or kilovolts have been added. So
okay now we can go online and run the test sets. Now we can start going
online and start the simulation and run the test cases that are already prepared.
So for starting the simulation in this system basically I can click on the
substation, the entire substation and on the right hand side I have the
simulation slider. I will click on it to switch it to the enabled and now I have
the opportunity to deselect some of the IEDs which I don't want to simulate. In
this case I don't want to simulate the HMI which is the main server here. I
deselect this one and other than that I don't need to deselect any IEDs so this
means that all the IEDs here have been prepared for simulation. So here I have
the opportunity to send the goose with simulation flag if I'm in a live
energized substation not to affect primary equipment but this is not the
case for us now. And now I can go online you know that when to go live you have
the live status slider here and for doing that you need an IP address in the
same range of the substation that you have so I already filled it out and this
also saved in the ACC file when you save it and then I can click on it simply to
start the simulation. And on the right hand side I have the ES Agile system and
it waits for me to go online and then when I go online you will notice that
already some positions will become available because of the simulation has
started for some base and some base are still continuing. And you can see the
status here on the very bottom of Station Scout that it's the 23 now going
on out of 67 IEDs to be simulated. Okay so this shows us a hint that which IEDs
we expect to see the positions and all the other signals which are communicating
out to the SCADA and when the HMI system comes online and we can switch to the
single line diagram which is the general overview of the HMI that shows us all
all the base and all the positions within the base so now you see that some
of the base have the valid positions taken from the Station Scout online and
some of the base have not still appeared then therefore you see them with the
question marks which means the invalid status of this base and switch. So I
think it's just one bay left yeah that's also fine so now you see all the switch
positions are available here I can also check the disconnector for example I
can send a command from this connector to the Station Scout so for doing that I
click on the disconnector and I select it so when I click on operate you will
see that 89 L will be okay so it will be open now okay with this way we can
test all the positions and I prepared the test case to test this so it's the
mimic diagram which will be tested now so this is this one and I click on this
test and let's have a look on the test case what we prepared here so I see that
it's the circuit breaker positions the single phase ones it has a closed open
closed cycle and the circuit breaker the three phase position it has all the
possible statuses and you can have also yeah delayed some of them or add the
ones that you want to test it's all possible as we mentioned before and 89A
which is the disconnector here you can see it 89A is closed here and also we
have some icons that represents the interlocking release signals and with
these icons we can also test it's single point status symbols so to run the test
I just click on the execute test case and observe from the HMI screen so now I
see that the circuit breaker phase A is closed I see also here A, B, C these are
the single position phases of the circuit breaker it's closed so I will
follow a closed open closed cycle and you see that the screen now it's opened
okay now phase A is closed and I see that it's closed again so in the phase B
I see that it's closed yes that's true now it should be opened that's fine and
it's closed one after other we can imagine that all the switch positions
will be red that shows us they are tested and at the end I will have the
mimic diagram all the closed positions that would mean that I tested each and
every position and when you have a bad state position in this reaction matrix
of the HMI I map this to receive an alarm for that and I receive this alarm
that means I can have also multiple destinations like the first destination
to check would be the mimic diagram the second one would be alarm and you can
also have some more to check the event log if you want to check you can check
all and you can enter a command with that so I can enter a command like
single line diagram checked or you can say okay and the bay overview okay the
alarm okay so with that you can have this commands in your test report so now
I say passed and it's back again to its closed position so it's okay for me so
now I'm switching to this interlocking permissive symbol or icon now it's false
and click on past and now it's true and now it's false again okay so this works
well so I think we come to the end of our test we can now export a test report
for documentation purposes click on the IED and on the right hand side you will
see the export test report button when you click export test report button
this will create a test report containing all the necessary details
that you need such as signal names timestamps and the values and test
report so after that you can copy this test report to clipboard and then you
can paste it to an text editor or any application that is accepting the HTML
data it can be a Microsoft Word for example so if I paste this test report
to Microsoft Word then I see the contents of the report and also the
navigated headings for easy reach and now I can switch to my next test which
is the let's say let's test metering values so metering values you can see
some strange values here these are the already prepared or actual status here
but I prepared the test case for current of A, B, C following the face-to-face
voltages and then some active power reactive power frequency so just to show
you the all different possibilities that in this small small diagram to be
tested so now we can start testing our metering values so now the phase A
current should be 0 now I see that it's 0 I can say that it should be 100 yes
that's true with that you can test all your values I will not going to go
further it's the same nothing different but this is just showing you how to test
the metering values all right so we have more or less all the tests that possible
in this VCU now we can switch to the protection signals in this bay so for
that I click on this protection signals this is another IED and we also have the
fault distance here okay I also added this and I have the protection LEDs and
whenever we want we can switch to alarm overview to see the values so this is
alarm overview the annunciator that to check if the signals are also mapped to
the annunciator values okay let's go back to bay overview and now we start
test with fault distance now it should be 0 yes that's true now it should be
hundred kilometer now it should be 23.25 so now I catch that we don't have the
nothing more than the decimal values so it doesn't support any more yeah values
than the decimal values here okay that's a finding for me and now I have the
differential operated as false now I expect to have it as true okay so maybe
we can also check in the line differential so now it's working fault
distance now we can see the event log so we can take some notes on that or we can
move on so now I see that differential operated LED is false so this can move
on like this and I hope you enjoy testing with stations code