In Part 1 of our video series titled Essentials of Partial Discharge Testing, Caspar Steineke, partial discharge (PD) expert and co-creator of OMICRON MPD technology, discusses the importance of knowing the insulation condition of electrical assets, how partial discharge plays a role in insulation deterioration and eventual failure, why regular PD testing is the preferred method for insulation condition assessment, and how PD testing provides users with the information they need to plan effective timely action to prevent equipment failure and costly outages.
00:00 - Introduction 00:14 - Why is insulation condition critical to know? 00:46 - What are partial discharges? 01:21 - What does PD activity indicate? 01:50 - Why should you perform PD measurements? 02:27 - How are PD measurements non-destructive? 02:45 - Conclusion and contact information
Partial discharge (PD) is a reliable indicator and major cause of deterioration in electrical insulation which can result in equipment failure and costly outages. Regular PD testing is a non-destructive and highly reliable method for assessing the insulation condition of electrical equipment, and it provides users with vital information to plan timely action that ensures their continued reliability and availability.
Hi, my name is Kasper Steinecke. I'm a co-creator of the original MPD technology
and I'm here today to share information on partial discharge testing with you.
Well, the failure of electrical energy systems or assets, that's what we're looking into here,
is almost always caused by the failure of the insulating system. Whether that's an XLPE cable,
a transformer insulating system, or a rotating machine, or even other assets, it's always about
the insulating system. When that fails, the asset fails. So that's why we need to look into
potential failure mechanisms of all these electrical assets. Partial discharges are
small electrical discharges that do not completely bridge an insulating system. That is, if you have
a flashover, you have a discharge from the conductor to ground. With partial discharges,
you have small discharges on the outside or deep in the insulating system. These discharges
can be quite destructive on a very small scale and then widen into major damage over time.
Well, we want all insulating systems to be PD-free in an ideal world. That is not
doable with many insulating systems that will see significant PD, like rotating machines.
Some insulating systems, we really want no PD at all, such as in XLPE cables, but any amount of PD
is potentially dangerous. And we need to look at it to determine whether that's the case.
Well, when we're looking at insulating systems, again, those are the chief culprit in any failure
of major electrical energy assets. There are actually very few indicators that would indicate
future failure. So we can look at integral indicators like tan delta that would indicate
aging over time, but they will not give us individual points of failure. And PD
is one of the very few ways of looking into an insulating system in order to prevent future
failure. Partial discharge tests are non-destructive. They're taken at nominal
operating voltage or slightly above. So we can safely test for these phenomena without
affecting other operating parameters.
I hope this information was of interest to you. Omicron has over 20 years of experience
in partial discharge testing, and we'd be pleased to work with you in this area.