In Part 3 of our video series titled Essentials of Partial Discharge Testing, Caspar Steineke, partial discharge (PD) expert and co-creator of OMICRON MPD technology, describes the various methods used to detect and measure potentially failure-causing PD activity in electrical equipment. He also explains when offline and online PD testing is performed and highlights the time-saving advantages of performing multi-channel PD measurements for more complete assessments of insulation condition in electrical equipment. Lastly, he describes which international standards are applied to guide in the setup and performance of PD measurements on electrical assets.
00:00 - Introduction 00:12 - How is PD detected and measured? 01:09 - What equipment is required? 01:42 - When are offline and online measurements performed? 02:32 - What is the advantage of multi-channel measurements? 03:23 - Which international standards apply? 03:56 - Conclusion and contact information
Partial discharge (PD) is a reliable indicator and major cause of deterioration in electrical insulation which can result in equipment failure and costly outages. Regular PD testing is a non-destructive and highly reliable method for assessing the insulation condition of electrical equipment, and it provides users with vital information to plan timely action that ensures their continued reliability and availability.
Hi, my name is Kasper Steinecke. I'm a co-creator of the original MPD technology
and I'm here today to share information on partial discharge testing with you.
When we measure or detect PD, and this is an important difference, we're looking into the
emissions from PD. So when there is partial discharge occurring, we get emissions of light,
sound and electrical waves. Light, well, can typically not be observed except for external
PD. That's where ultraviolet cameras, UV cameras come into play. Those are sometimes used in
looking at overhead lines and insulators. We can look at acoustic emissions. This is done
in transformers, for example, to locate PD and we can look at electrical emissions. However,
light and acoustic can really only be used for detecting PD. When we want to measure and
quantify PD and work according to international standards, then we need to look at these
electrical emissions. For a typical PD test, we need the device under test, we need a high voltage
source and a PD measuring instrument. Typically, you connect the high voltage across the insulating
system of your device under test and then decouple the PD signal using a coupling capacitor.
That's actually very simple. You connect a capacitor, a high voltage capacitor, in parallel
with your acid and at the base of that capacitor, you connect the PD instrument. Partial discharge
measurements can be taken online and offline. Online measurements are taken on electrical energy
assets in operation. Offline measurements require taking these assets out of operation.
Initial measurements are always taken offline, that is quality assurance at the factory when an
asset gets manufactured. Offline measurements require having a voltage source on site. Online
measurements operate with the voltage that's already present. Online measurements typically
come with restrictions because we do not have access to all terminals. They're often performed
on built-in sensors in assets and on permanently installed means of decoupling the PD signal.
Performing multi-channel PD measurements offers great additional insight. That is, imagine
commissioning a cable system where you have multiple geographically distributed partial
discharge measurements. Imagine having one measuring unit on every joint of that system
and looking at all of them in real time. Imagine having a partial discharge measuring unit on every
phase of a multi-phase system. That is, looking at a rotating machine or transformer in real time
and using multiple points of measurement to collect more information more rapidly
and correlate that information as to be able to pinpoint defects within that asset
faster and more precisely. The most important standard for taking PD measurements is IEC 6270.
With IEC 6270 we have certain defined frequency ranges. We have a defined means of calibration
and we can compare PD performance across different measurements. There are then other standards
that govern individual assets like for example 60 or 34 for rotating machines.
I hope this information was of interest to you. Omicron has over 20 years of experience
in partial discharge testing and we'd be pleased to work with you in this area.