DIY Epoxy River Table (Part One) How-To Woodworking

Blacktail Studio
97 followers
107 Video Views·Jan 8, 2023
Hey this is Cam with Blacktail Studio and this is my how to make a river table youtube build.
Just finished this black walnut with black epoxy,
used eco epoxy, got the walnut from Gobi Walnut from Gobi Walnut. I'm going to get into all those
details and a lot more. Everything you need to build this table in your garage. This one as
you can see is a little bit of an unusual design but I think that'll help for the instructional
purposes because really you build a form, cut your wood, drop it in, pour some epoxy.
A little bit more to it than that but I'm going to get into all the details. If I left anything
out ask me in the comments because I have another larger eight foot black walnut dining table river
build coming up that I'm really excited to get started. So let me know what you think and
hopefully this is helpful. Thanks. I used to buy my slabs all over the place on craigslist at random
suppliers and now I find myself it's just, it's actually not even that much more expensive just
to go to a place where I know it's been dried properly. I know there aren't bugs in it. Gobi
Walnut's 20 minutes from my house but they ship internationally. They've been really really good
to me. They'll send me pictures of inventory they have. They'll hold stuff for me. So I pretty much
always just go to Gobi Walnut now. One of my followers on instagram saw this slab at Gobi
and called it the fish slab and I thought that was pretty fitting. The very first thing I do when I
make one of these river tables is I make a template. It's even before I pick out the slab I'll
generally go make one of these templates out of just simple one by twos or whatever I have
laying around. Don't waste a lot of time making these. Just down and dirty. A couple brad nails.
Just make sure you get the size fairly close. Doesn't even have to be exact. It's just to give
you an idea to visualize. Then when you go to select your layout really take your time here.
Try every layout. Don't go in with your original biases. This was kind of my original layout. I
had in mind and ended up finding another layout I liked a lot more and luckily the client agreed.
Kind of surprised myself when I brought this around like this because this is the
layout I ended up choosing and I really really liked it but not at all the original design
that I had in mind. But even though I liked the way this looked right now I wanted to keep going.
Test out every other possible layout. Make sure there wasn't going to be something I liked a
little bit more. So the nice thing about these templates is it makes it pretty easy to see if
there's a design you like because it really frames it nicely. Shows you what it's going to look like.
None of these ones ended up working so as I looked at it I ended up coming around to that design
right there. That'll do. Next thing I do is I mark just with a pencil the outline of
this layout so I can make my cuts. I like to make it a little bit oversized. At least an inch if not
maybe two inches. That way when I cut it down I can guarantee I get the
size I set out to get. Next thing I do is prepare the slab to make all my cuts. As you can see here
this slab wasn't very light. It started out at two and a half inches thick which is a little
thicker than most of the slabs I start out with. I'm fortunate enough to have a Festool track saw
makes this really really easy. I have built a number of river tables with just a regular old
circular saw so don't think you have to have a tool like this but having it does make things
quite a bit easier. You see I'm making some multiple passes there to prevent some binding
that can happen when you try to make one big deep pass. Now that I have the main section of my river
cut to size I can set my template back down and find out how I want to orientate the second part
to this river. This slab didn't have as many options as I did for the main river so it's
pretty clear which way I wanted to do it but I still wanted to test out all the possible layouts.
It's always a good idea to have one really flat side so when you put it in your mold it sits down
flat doesn't twist on you and how I'm doing that is with a it's called a router sled. It's a really
simple jig that you can make. This one cost me maybe 10 or 15 dollars. There's lots of YouTube
videos, lots of places online you can search to make one of these yourself. I really recommend it
because most of these slabs aren't going to be able to fit in a planer that you have access to
so this is an inexpensive way to get one side completely flat. After that I like to clean these
up with a wire wheel. Sanders tend to kind of remove the contours from the live edge slab and
these wire wheels leave the contours but clean all the debris off. This is one step I see a lot of
people on Instagram and YouTube skipping and I would never skip this step so I recommend you
either. What I'm doing is I'm sealing the edges with epoxy. I do two coats of just regular quick
drying epoxy on these edges and the reason I do this is when you pour the epoxy it will prevent
any of the bubbles from forming. That's where they want to form is right near the wood so if
you seal it you won't get any of the little bubbles. Now that you're ready to start building
the form I like to use melamine which is this white sheet material you'll see. Epoxy doesn't
really like to stick to it very much it also stays really really flat so I like this over
using something like a plywood. Definitely wouldn't use an OSB. When you're building the sides make
sure they are at least one inch taller than the total thickness of your table so you don't have
to worry about it overflowing. This is a called Tyvek tape it's a house wrap. You see a lot of
guys using the red stuff that's called tuck tape. The only difference is that stuff is sold in
Canada this stuff sold in the US. Same type of stuff either one will work and this will prevent
the epoxy from sticking to the mold which can be a nightmare if it happens to you. I urge you not
to skip this step this is from a lot of experience or I should say bad experiences. It doesn't take
very much to get a leak going in this epoxy it's pretty thin so I go kind of overboard on sealing
this. I try to make it just as tight as an aquarium. Put a little pressure with the brad nail
make sure you get a good watertight seal because these epoxy leaks are killer and anybody who's
made any of these tables has had these leaks and knows how painful it'll be to see a thousand
dollars worth of epoxy running on your floor. Here I am adding some caulk. Silicone would
probably been a little bit better but both of them will work just fine and this is maybe a
little bit overkill but I've had leaks before and I refuse to ever have one again. This is another
step I see a lot of people on Instagram and YouTube skipping but another step that I would
never skip. What I'm doing is I'm sealing it with shellac this is a de-waxed shellac.
Either one will work for this purpose though the de-waxed or the original
and why I'm doing this is to prevent any of the dyed epoxy from staining the wood. Just a couple
drips can really penetrate this wood especially if you're doing a lighter wood the walnut's not as
bad as showing but if you do get some drips accidentally and you will get some drips accidentally
on your slab it can penetrate quarter or even a half inch down and you'll never sand it out and
can actually ruin a project. Don't forget the sides and the end grain I've forgot those before
and especially the end grain will really soak up that color so pay special attention to the
end grains and the sides. Now you want to just scuff up this epoxy to give a good bond. Anytime
you're pouring epoxy over epoxy you want to give a good scuff with 320 sandpaper make sure it has
something to adhere to. This is probably the most common question I get when people ask me about
making their own river tables because epoxy is so expensive and they don't want to waste any
so what I do is I take a measurement every four inches and then I take the average
of all those measurements and I do this for the top and the bottom if I have a slab that
is sloped like this so here's the bottom and there's my average width across the bottom
there's my average width across the top and I just add those together divide find the overall
average width now that I have my average width I just take the length and with that length I'm
going to go find a rectangle volume calculator there's lots of those online and you'll see a
screenshot of the one I found and this is the volume needed for the main river two inches by
36 by whatever my average width was and I do the volume in liters I had to google how to find the
volume of a triangle but that's the volume for that triangle section so this will be my total
volume in liters needed for this entire epoxy pour not too bad now that you have your volume figured
out you're going to get everything nice and clean you don't want this chalk getting mixed in with
your resin also don't want any of the dust I'm using a tack cloth a microfiber works really good
for cleaning off all the little dust particles from where we sanded those epoxy edges just make
sure it's nice and clean air hose is good to blow everything off with too all right suit up for part
two which will do the epoxy pour the finishing table base mounting even the photography method
I use when these tables are done thanks and as always please subscribe
