Extreme Constructions The Meraviglia Cruise Ship Free Documentary

Science & Tech
69 followers
18 Video Views·Jan 7, 2023
Extreme Constructions The Meraviglia Cruise Ship Free Documentary
This video is brought to you by NordVPN. Surf the internet safely for 70% off,
cutting the monthly price to only $3.49, plus an additional month free at nordvpn.com.
315 meters long, 65 meters high, a total weight of 80,000 tons.
This is the Meraviglia, the latest jewel of the Atlantic's shipyards.
A cruise ship equipped with all the latest technology.
A design that employs an incredibly high performance system
of simulation calculations and an army of engineers.
A giant puzzle made from 300,000 pieces of steel.
Huge sheets of metal had to be cut and then soldered to perfection.
A huge construction site, starting with the huge gantry crane,
the most powerful lifting machine in Europe, capable of lifting blocks of 1,200 tons
and positioning them to the nearest millimeter.
The Meraviglia involved building a real self-sufficient city for several thousand inhabitants.
Four years of research and work for a delivery with a strict deadline.
The Meraviglia, Italian for marvel, is not only a giant of the seas,
but also one of the most ecological liners ever built,
despite having unequal propulsion power for this type of ship.
For this crazy venture to succeed, the ship required six million hours of work.
Thousands of men and women with one mission,
to build the biggest cruise liner in history for a European ship owner.
After four years of construction, take a look behind the scenes at an extraordinary achievement.
A 600 million euro giant of the seas filled with innovation, the ship of the future.
The Saint-Nazaire shipyard is located on the west coast of France,
less than 60 kilometers from Nantes.
At a size of 150 hectares, it is the largest shipyard in Europe
and one of the six largest in the world.
On this site, military vessels, tankers and new generation cruise ships are built.
Always enormous constructions.
The location of the yards is ideal for designing these giants of the seas.
The Atlantic Ocean is a stone's throw away and its depth at high tide
allows the largest ships in the world to be launched from the construction site.
For the construction of the Meraviglia, the shipyards have to meet very strict specifications.
The stability of the vessel at sea must be exemplary.
Seasickness is the last thing the passengers want
and so one of the priorities of engineers is to limit the pitch of the vessel.
The vibrations felt in the rooms and also on the deck of the ship
must be as limited as possible.
Also, the customers must not be inconvenienced by the smoke
coming from the huge chimneys of the ship,
so the ship owner demands that particular attention be paid to this.
And it is not only the comfort of the passengers
that is the subject of such precise studies.
The energy consumption of this new liner was reduced by 20%
compared to ships in the same category.
This means a fuel economy of several hundreds of thousands of euros per year,
but also fewer gases released into the atmosphere.
The delivery of the Meraviglia was planned for less than four years
after the signing of the contract, a strict deadline.
If the liner is not ready, the penalties for delay are exorbitant.
More than 100,000 euros per day.
In order to succeed in this crazy challenge,
the shipyards have developed revolutionary techniques and impeccable organization.
The boats are split up into various sections.
The first stage begins with the arrival of the metal sheets
needed for the Meraviglia's construction.
They arrive directly in a hangar at the end of the building site.
The sheets will be cut in this 300 meter long building.
This is where the liner comes to life.
The 300,000 pieces of the puzzle, cut out day and night, take shape.
Robots take care of the cutting work to the 10th of a millimeter on high resistance sheets.
These steel plates respond to a growing demand from ship owners.
Cruise ships, unlike military vessels, are in open sea configurations.
The ship must give an impressive sensation of lightness.
The sheets are therefore very thin.
Another advantage is that the lighter the liner is,
the less fuel it consumes while moving.
This cutting process takes three to four months.
In three to four months, we have to cut all the pieces that will make up a ship.
Cutting the pieces is the first challenge for the building sites.
Some sheets can be up to 20 meters long.
For engineers, the challenge is to get as many elements out of each sheet as possible.
To minimize waste, the cut of each piece is calculated by a computer,
which sometimes requires complex cuts to generate unusual pieces.
Like this one.
The bulb alone is a steel monster.
It has two purposes.
To increase speed, thanks to better penetration of the water by the ship,
and to save hundreds of thousands of euros of fuel each year.
Loic Morand worked on its development.
We see here the first wave that is created by the bow of the ship.
As speed increases, the wave increases, and this mass of water will slow down the ship.
With the addition of the bulb, a second wave will appear below the bow.
With the disappearance of the enormous wave at the front of the ship,
less energy is needed to move the ship forward.
The size and form of the bulb adapts to the bow of each vessel.
The selection of the most effective profile for a bulb
is the work of hydrodynamic engineers.
A bulb with the best possible profile decreases water resistance by 20%.
This process has been specially developed for very large vessels.
The other part of the liner that also experiences water resistance
is the hull of the ship.
Like the bulb, the shape of the hull of the Meraviglia has also been subject
to considerable research and, as such, has benefited from a new system for its design.
A world first, the Meraviglia benefits from software that allows settings of the hull
to be cross-referenced with sea conditions.
This software takes advantage of new high-performance algorithms called CFD calculations.
This new technology for the study of fluid mechanics has shown spectacular results,
which has allowed the hull of the Meraviglia to be designed with the perfect profile.
CFD is Computational Fluid Dynamics.
It consists of solving the Navier-Stokes equations,
which are the equations that manage the mechanics of fluids,
with certain turbulence hypotheses that allow us to determine the flow
through the entire shape of the hull, through all points, in a numerical way.
These calculations of the turbulence acting on the hull of an ocean liner
are a revolutionary part of the Meraviglia's design.
The results obtained inform engineers about the speed of the ship with different hull shapes.
They allow designers to model more than 150 different hulls,
according to the researchers' experiments, to finally arrive at the ideal shape.
On several giant models, sensors are installed to measure the resistance of the water at a given speed,
a process that has existed for several decades, but that is probably seeing its final days.
This is because the results obtained by the computer are astounding.
For the first time, the figures given by computer calculations
are just as precise as those measured by the sensors of the model.
And it is not just the hull of the Meraviglia that benefits from this innovation.
It is also the propellers.
Known as the weights, they are the second revolution of the Meraviglia.
They are responsible for advancing the enormous mass of the ship.
Monsters of steel, about 20 meters high, coupled with gigantic propellers.
They have a propulsion power that has never been seen on a ship like this one.
Combining speed, new perspectives in travel and increased comfort of passengers,
they are the future of cruise liners.
The Meraviglia is at the forefront of this formidable revolution.
Miquel Legal is the man who will run the tests of the Meraviglia at sea.
The addition of these mobile propellers offers him a smoothness and control
never seen before.
Before, we had diesel engines with shaft lines and a propeller.
That's what we knew about old boats.
These diesel engines were later replaced by electric engines,
which were much more flexible in terms of maintenance and operation.
And now we have an electric engine directly in a small nacelle,
or pod in English, it means nacelle.
So we imagine two big balls at the back of the boat,
with the propeller not at the back, as on an outboard,
but at the front, so that it can really suck in the water
and have a well-channeled engine flow.
Each of the two electric motors produces 20 million watts,
the equivalent of 7,000 washing machines,
the highest electric power ever produced for a propeller of this size.
On the lower rear part, a wing controls the direction.
Powered by the engine, the propellers drive the liner forward
with a maximum speed of 25 knots,
an impressive feat for a ship of 80,000 tonnes,
the equivalent of nearly 6,000 buses.
But this is not their only feature.
They also give the ship incredible manoeuvrability.
The result?
The Meraviglia will be able to dock in ports
that would have been impossible with the old style of propellers,
a real plus for the passengers.
Another innovation is the automatic control of the engine power,
which has been improved by the engineers,
to avoid any risk of catastrophe, as seen here.
A cruise ship more than three times the size of the Meraviglia
with 4,000 passengers,
leaves a small port on the coast of Messina in Italy.
The captain has apparently not measured the power of his pods.
The port experiences giant waves, destroying several ships.
The damage costs several hundred thousand euros.
In addition to their power,
these new generation propellers allow for fluidity of navigation.
There are almost no vibrations felt on the ship.
It's a revolution, a revolution.
And for us, there are only advantages with pods.
We don't have any seams linked to a tree line
or a chair arm that holds the tree line,
which is the main generator of turbulence,
which is very poorly perceived by the propellers
and which increases the pressure on the hull.
The result?
Cruising at speed does not bother the passengers on the ship.
But the pods are not the only ones to provide energy to the Meraviglia.
Four diesel engines on the ship act as a power station.
The Meraviglia, with its 2,500 cabins,
casinos, theatres and other leisure facilities,
is very energy intensive.
If you add to that the energy consumption of the 7,000 people living on board,
it's clear there are very different needs to meet.
We'll start at the bottom with 11,000 volts.
Then we'll power each of the sides of the ship
as a load-bearing transformer.
We'll lower the electric current to 400 volts or 440 volts,
depending on the needs.
Then we'll end up in the passenger's cabin,
at 230 volts, like at home,
to plug in his razor in the morning or my wife's hairdryer.
The pods, as well as the four engines manufactured by subcontractors,
were transported here to the construction dock
where the assembly was carried out.
The floors of the ship that have been assembled
are brought here to this 900-metre construction zone.
Like a giant's construction game,
the blocks are stacked on top of each other.
It is impossible to imagine this without this machine
that allowed them to be moved.
A large gantry crane, called the TGP,
is the largest lifting machine in all of Europe.
A giant weighing over 5,000 tonnes,
the equivalent of 10 A380 aeroplanes,
a structure made of ultra-resistant steel at 100 metres high.
At maximum capacity, it can lift nearly 1,200 tonnes.
The Meraviglia would not exist without it.
The TGP allows us to save several weeks,
or even less, of docking time.
It's just an exceptional tool.
The first block we lay is generally a block at the bottom,
roughly in the middle of the ship.
Then we put a block in front, a block behind, a block on top,
and little by little we go up in a pyramid
until we have assembled about 50 blocks.
This giant moving bridge works with two carriages.
In each of the carriages,
two lifting systems are positioned at the ends.
In each lifting system,
there is a single 1,400-metre-long cable
that is lengthened or retracted
to raise or lower the load as required.
Each of the cables passes through a lifting beam,
which makes it possible to adjust its length
to the nearest centimetre.
At the other end of the cable,
five anchoring points are attached.
Once the four lifting beams are connected
to the gigantic structure,
it is lifted a few centimetres
and the balancing of the entire structure
is done at this precise moment.
Once the balance is perfect,
the block is lifted,
moved over to the construction zone
and then placed on the ship.
High-precision manoeuvring.
On the ground, the slingers direct the operation.
They give precise indications to the gantry crane operator
so that the gigantic structures fit perfectly together.
We always have to be prepared for the unexpected,
especially because we put more and more
pre-armaments inside.
We try to put in pipes, ventilation hoses,
exhausts, big equipment.
So it is possible that sometimes
we have a few interferences
and that when we put the block down,
we have to disassemble and cut
two or three elements that we have put in.
Perched 100 metres above the action,
Jacques Perri is the pilot of the gantry crane.
He has been working on these construction sites
for 16 years.
Thanks to its very easy handling,
the gantry crane takes less than three hours
for a block of more than 1,000 tonnes
to fit perfectly into another.
It took only nine months
for the Meraviglia to take its definitive form.
But although it is fast,
manoeuvring these mountains of steel
is still dangerous for the workers underneath.
Jacques Perri has no margin of error
when he is moving a giant block
with a simple joystick.
The blocks assembled by the gantry crane
were lifted a few metres away
in a hangar over 900 metres long.
This building is entirely dedicated
to welding the 300,000 pieces of sheet metal.
This is a stage where workers are needed
to replace the less skilled machines.
Mariannique has been a welder
on the building sites for five years.
For the Meraviglia,
everything must be extremely precise.
Yet other welds can look perfect,
but conceal serious imperfections
because the metal can change shape or retract.
These welding problems are difficult to detect
and become much more serious
when the liner is already assembled.
The assembled sheets become increasingly sophisticated
as the first fittings are added.
1,500 kilometres of cable
will be concealed in the ceilings of these panels.
The aim is to assemble the blocks
that are already equipped
with maximum functionality.
This saves a considerable amount of time
compared with assembling the floors of the ship
and then equipping them.
But this strategy is only effective
thanks to the gantry crane that dominates the port.
Investing in this 30 million euro steel giant
was a superb choice for the shipyards in Saint-Nazaire.
Coupled with the giant assembly dock
that allows the construction of two ships,
it has made Saint-Nazaire
the most efficient shipyard in Europe
and one of the quickest in the world.
Only around 40 months are needed
for each giant of the seas.
But it is also the research programmes
and technological innovations
developed by the shipyard's engineers
that seduce the owners of the Meraviglia.
For example, these gigantic openings
at the level of the bulb.
These are the bow propellers of the Meraviglia.
Installed at the front of the ship,
these propellers direct it
and, coupled with the pods at the back,
increase the manoeuvrability of the liner even more.
On a liner like the Meraviglia,
there are two ways to manage the water.
Taming the water on the outside of the ship
so that it doesn't slow it down
and also managing the water on board.
This is a major challenge for a floating city.
7,000 cruise passengers and crew
are getting on board the Meraviglia
Between the swimming pools,
passenger showers and ship maintenance,
an average of 200 cubic metres of water
per person per day is required,
which means 1.4 million cubic metres of water
have to be produced daily,
the equivalent of 5,600 baths
of drinking water per day.
It isn't possible to store
the amount of water needed
for each week of a cruise.
In addition, to consume as little fuel as possible,
the vessel must try to keep its weight
as low as possible.
This water will be stored near the engines.
The heat released is such
that the thousands of cubic metres
pumped in from the sea end up boiling.
Steam then forms,
and this seawater,
which has become freshwater,
will be recovered in tanks.
From 100 litres of saltwater,
30 litres of distilled water is obtained
thanks to the system developed for the Meraviglia.
This process will be increasingly used by ship owners,
as transforming this seawater into drinking water
uses the heat of the engines,
which is both an economical
and non-polluting technology.
The heat is free, in fact.
That is to say that the engines
that produce electrical energy,
like your car engine,
produce heat,
and it is this heat
that, instead of being dispersed in the atmosphere
as it is for a car,
or dispersed in a water circuit and a radiator,
this heat is used.
But this method cannot meet
all the needs of a cruise.
And so it is impossible for the ship
to collect clean water in a port.
The engineers in San Azea
have responded to this challenge.
When the Meraviglia is docked for several days,
another system takes over.
A high-performance membrane,
a sort of giant filter
that is so sensitive
it can separate salt from water.
These machines, called osmosis,
with their incredible water-filtering membrane,
are a solution for small quantities of water,
but only the boilers are capable of producing
the 1,400,000 cubic metres of water each day
that the ship requires during a cruise.
The quality of the ocean water
is a major environmental issue.
The Meraviglia must comply
with strict international guidelines
when releasing its water into the sea.
It is treated to not add any more pollution
to the ship's crossings.
The Meraviglia is not a ship
It is a ship that is meant to be used
It is not a ship that is meant to be used
The Meraviglia is a ship that is not meant to go to Alaska
and yet the plant that is used on board
is capable of processing used water
and of rejecting water of such quality
that it could be rejected in Alaska.
The waters around Alaska are under extreme surveillance
regarding pollution caused by large ships.
The toxic waste authorised in this region
is the lowest in the world.
But if the Meraviglia travels from one ocean to another,
from Alaska to the Mediterranean,
another problem that could arise
is the potential transportation of harmful species on the ship.
Mathieu Lorange works on environmental issues
at the Saint-Nazaire shipyards.
On board the ship, there are boxes
that are dedicated to the ship's ballasting.
That is, we need to fill or empty them
depending on the different conditions on board.
The quantity of fuel and its distribution throughout the ship
varies throughout the journey.
The engineers have found a way to counter this
and maintain a steady balance on the ship.
Ballasts.
To maintain stability,
a good board and a good yacht
will fill certain boxes with seawater.
This water could contain species that are dangerous
to the natural balance of sensitive regions,
like the Mediterranean.
Not to mention bacteria hidden in the water from other seas.
On this ship, there is a system that allows you to treat these ballasts.
The seawater during ballasting,
when you suck seawater in,
the seawater will be filtered
to remove the biggest parasitic organisms,
then sent to an ultraviolet chamber
to destroy the last organisms,
bacteria and others,
that can contaminate an area.
Ultraviolet light is actually used twice in this way,
to kill bacteria on cruise liners,
a security measure that is enforced by the authorities
just as the treatment of fumes that are released into the air.
The fuel used by the Medevilla and all cruise liners
is a heavy fuel of poor quality that is usually quite polluting.
Cruise operators have therefore been asking research laboratories
to develop a system that can limit this air pollution as much as possible.
In particular, the large amount of sulphur
that is present in the smoke emitted by the chimneys.
The Medevilla takes full advantage of this research with the scrubbers,
a kind of giant shower designed to limit the pollutants released into the air.
They alone remove 97% of the sulphur oxide
emitted by the liner's diesel engines.
The scrubbers are responsible for trapping toxic fumes
by mixing them with seawater before they escape through the chimneys.
The sulphur is mixed with a special solution.
Once neutralized, the mud-like result is stored on the ship
and then unloaded onto land to be treated.
It's new. It's a technology that has been tested on smaller ships
for a certain number of years, but now it's becoming more and more common.
All this to be able to build a cleaner, more ecological ship
and meet the requirements and challenges of the future.
Polluting waste is a major problem for the environment,
but can also be one for the passengers.
In the design specification for the Medevilla,
the ship owner wanted to optimize as much open air space as possible for the customers,
the aim being to gain as much space as possible on the deck of the ship.
The walks on the bridge and the tanning sessions by the pools
are the most popular activities for the passengers.
A computer simulates the trajectories of the gas leaving the chimneys of the liner.
From these results, the exhaust chimneys of the Medevilla have been inclined in such a way
to avoid the fumes falling back onto the decks.
There have also been openings made in the chimneys
so that the air that enters cools the gases,
as it is difficult to control where hot gas falls.
By lowering their temperature with cold air,
the fumes, that are often foul-smelling, no longer surround the decks of the ship.
Measurements are constantly being taken in the areas where holidaymakers like to walk.
The comfort and the safety of the passengers come first.
But the gases produced by the engines
are not the only consideration on the decks of the liners.
To simulate all types of wind,
a computer is also used to calculate the air penetration on the ship.
As well as the corridors, the wind can blow down.
The shape of the ship, combined with protective systems such as large panels,
is optimised so that the wind takes different routes, far from the holidaymakers.
To offer their guests the pleasure of sailing on the open sea,
miles away from the mainland with no inconveniences,
is the challenge for the Meraviglia,
and the passenger experience must be flawless.
With this in mind, and to combat the terrible sensation of seasickness,
another innovation has transformed the experience on this cruise ship.
A process that is invisible for the passengers,
yet very impressive when viewed from underwater,
where the ship benefits from huge stabilisers, like airplane wings,
measuring an impressive 17 square metres each.
The stabilisers orient themselves as the ship rolls,
generating a force that is opposed to the movement of the rudder,
and stabilises the movement.
When the ship is in the harbour, the stabilisers are in the entry position,
otherwise there will be a problem with the position of the keel.
So in the harbour, below 6 knots, the stabilisers are usually in the entry position.
By limiting the vibrations of certain parts of the ship, or the effects of rolling,
the new giants of the sea, such as the Meraviglia,
do all they can to eliminate every annoyance, starting with seasickness.
The 80,000 tonne ship can finally leave the assembly dock.
A total of 6 million hours of work are needed to construct the Meraviglia.
Today is the beginning of testing, and the start-up of the engines.
To begin with, they have to fill the dock where it was assembled,
to transfer the giant to another part of the site, just a few hundred metres away.
An important moment for the ship.
And there it goes.
The ship is floating for the first time, and starts to leave the assembly dock.
This can only happen when the tidal coefficient is at its highest,
and the weather conditions are as calm as possible.
At this stage, the Meraviglia is ready to leave the assembly dock.
The ship is still an inert giant, with no functioning motor.
It has to be towed.
The liner is not going on a long trip,
but it has definitely left its assembly dock for another,
which does not have a gantry crane.
The Meraviglia settles into its new home.
Although from the outside it may look ready,
inside, the workers of the Saint-Nazaire shipyard continue their work day and night.
The liner is far from being finished.
The 2,500 rooms, the restaurants, cinemas and nightclubs
are not yet ready to welcome the first passengers.
Thousands of workers and craftsmen labour each day
to ensure the all-important deadline is met.
As these numerous workers fulfil their roles,
simultaneously, the technical teams begin work on a crucial stage of the construction.
The computers are turned on.
We can now check that the Meraviglia reacts perfectly to the detection of a fire, for example.
A fire can break out at any time during the construction phase,
but a fire that starts while the ship is at sea can quickly become a catastrophe.
The ships are very close-knit.
By fire section, by deck.
The networks are autonomous.
They are really disconnected by section.
If we ever lose a section,
we continue to have electricity
and servitude in the other sections of the ship.
There is a lot of redundancy
that allows us to always ensure continuity of service,
even if there has been a major incident.
There is insulation everywhere,
behind the ceilings, the hatches,
everything is insulated,
either by fire or by sound,
but almost all the bridges and hatches are insulated.
Noise pollution is one of the major challenges
in the construction of new-generation cruise liners.
In addition to the propellers developed for the Meraviglia,
which considerably reduce noise pollution
compared to other ships in the same category,
at the heart of the ship,
the insulation work is extensive.
One of the criteria of comfort
perceived by passengers
is noise and vibrations.
This is extremely important.
If the passenger constantly has a noise
or feels the propellers vibrate,
if he is not comfortable,
he will not be able to rest.
So we work a lot
on the acoustics of the ship,
by either installing a floating floor system,
by insulating the sources of noise,
by putting sound insulation
everywhere
so that when the passenger is in his cabin,
he must not hear the cabin next door
or a permanent ventilation noise.
When he is at the restaurant,
he must not hear the noise of the engines
or the noise of the kitchen next door.
One of the main luxury criteria on a ship
is its silence and its comfort.
Tests in the fitting-out basin
are not enough.
A real outing at sea is required
to properly assess the ship.
And so the Medevilla
is going to leave the shipyard
to face reality.
We are going to put sensors,
piezoelectric sensors,
at different places on the ship,
at different velocities,
and we are going to see
how the ship vibrates.
It is mainly by the use of materials.
When a pipe vibrates,
we can imagine that if between
the support and the pipe
we put a piece of rubber
or a cushioning piece,
it will not make any noise.
So we avoid, in a very simple way,
metal-metal contacts
with decoupling systems.
During these tests at sea,
extreme manoeuvres are carried out
and the behaviour of the ship,
its stopping distance
and its turning radius are assessed,
even if the ship's intelligence system
limits the possibility
of going too far in these tests.
We are going to push the engines quite a bit.
We are going to do tests
that we don't always do.
We are going to imagine
that we have four engines in service
and then suddenly we are going to put
an emergency stop on one engine
and then we are going to see
how the other engines recharge.
There are automatic unloading systems
because we can imagine that if
the four engines are charged
and if we stop an engine automatically,
there can be a number of problems on board.
So the system will respond quite quickly.
It will cut off electric consumers on board.
It will try to regulate the charge.
So today we have relatively smart ships.
We are not like in the past
where before accelerating
we asked the chief mechanic
to put one more engine.
Here the system now reacts automatically.
The Medevillia has reached the final straight.
Inside, the finishing touches
have been carefully added,
all whilst keeping a close eye
on the schedule.
With €100,000 of penalty
for each day it is delayed,
the Saint-Nazaire shipyards
have been watching the clock
very, very closely,
as they do for the delivery of each liner.
The Medevillia is not yet out of the shipyards
and yet already,
a new series of liners
is under construction.
Following its lead,
and thanks to the numerous studies
that were carried out
to make this ground-breaking
cruise liner,
the new ships built on the shipyard
will be the first
to follow the path of innovation
and environmental protection.
This ever-present desire
to innovate,
as seen with the Medevillia,
will lead to bigger and bigger ships
being built in the future.
Less environmental waste,
widespread electric propulsion
and ultimately no more diesel engine
at the very heart of the liner,
even more efficient water management,
solar panels that are able
to operate an entire ship.
The challenges to come
over the next few decades
have definitely not finished
transforming these so-called
giants of the sea.
