Japanese Woodworking - Insulation with Natural Ventilation [Season 2 - Part 1]

Shoyan Japanese Carpenter
89 followers
8 Video Views·Dec 19, 2022
Hello, Shoya here. I'm a Japanese carpenter.
I'll be working at a new site this time.
The framework is already completed. I'll start with the installation work.
It's been a while since I finished at the last site,
and I start working on a new site from today.
The framework is already done,
and the exterior load-bearing walls are constructed using moist boards.
I'd like to start with the installation work first.
This is a styrofoam installation for the walls.
I'll install it between the columns and the studs.
It's 60mm thick and 800mm wide.
Divide it in half, and then cut it to fit the dimensions
between the columns and the studs.
Then, install it firmly in place.
Of all the styrofoam installation materials,
pink styrofoam is said to perform the best.
It's also recyclable and can be disposed of.
I'll cut the styrofoam with a handmade tabletop circular saw.
It's dangerous, but this is the best way to cut it.
Some may say this cutting method isn't good,
but it's actually the same as the small splitting method used by a joiner to cut wood.
Now, I'm going to install the installation that I cut earlier.
It needs to be 1mm wider than the distance between the columns.
If it were 2mm wider, it will never fit.
It's rather thick, so it's quite difficult to install.
Just 1mm too wide would make it awkward to install.
I'll use a piece of furring strip to widen the middle,
and make sure the styrofoam is firmly installed.
Also, install the installation under some windows.
I'm taking measurements now as all 5 or 6 windows are different heights.
The stashes are standardized,
but the windows vary in size and height according to their use.
As you can see in the video, it takes a lot of force to push and tap.
After 2 days of this, my body is exhausted,
my muscles ache, and by the 4th day, I can't move at all.
The roof tile maker is here today,
and they are lifting the tiles onto the roof.
It's so much easier to lift the tiles nowadays.
When I was a new carpenter,
I don't think such a wedge existed for ladders.
In one-story houses,
we used to carry the tiles up to the roof by hand.
Install installation in the small triangular part of the room.
A triangular part can be a bit tricky.
I'll cut it according to the slope of the roof.
Both sides will have the same dimensions from the middle,
so you only need to measure the height of one side.
I'm checking the dimensions now.
Use a slope ruler to determine the angle.
If you mark one dimension for the high or low point,
you can easily cut it using the edge of the ruler as a guide.
Install the triangular part so that it fits as tight as possible.
The ventilation system, which will open freely,
will be attached to the wedge.
I'm now cutting out that part.
As you can see,
the installation for the roof was installed
when the building was first erected.
The roof installation is 70mm thick,
10mm thicker than the wall installation.
The wall installation is now installed.
I hit the styrofoam pretty hard from the inside,
so it's sticking out more than it should be.
So, I'll hit it from the outside with lumber
to move it back into position,
and then nail it to the studs.
The nails are 50mm end nails,
which are driven in at 100mm intervals
on the inside and the outside.
So, the wall is stronger than the typical load-bearing wall.
Now, I'll attach the same pieces of styrofoam
around the styrofoam wall using caulk.
Press the styrofoam firmly against the wall
and apply caulk around it.
Surround the wall with the same pieces of styrofoam.
It's like Zoukin Zui.
When installing the same material around it,
caulk only the columns.
Then, press it down and make sure it's glued to the caulk.
That way, even if the wood shrinks,
there will be no gaps.
It's attached to the columns or studs
and not connected to the styrofoam wall.
So, even if there's an earthquake and it moves,
it'll move back.
Fill the narrow part of the wall with urethane.
It's difficult to install styrofoam
into this narrow space.
At the same time,
fill the gaps between the mendo with urethane.
Then, fill the upper part of the triangular section as well.
When filling them with urethane,
if you only fill them with the same layer
about 1cm thick,
then they may crack.
Therefore, it's necessary to spray
more than 2cm.
Install the same thin styrofoam pieces
around the large wall.
Where the styrofoam was cut,
it has a crumbly surface.
Because of this,
it attaches to the caulk more easily
when pressure is applied to it.
It sticks nicely without moving.
However, because I have to press hard
to get it to stick,
my fingertips will be smooth
so it won't leave any fingerprints.
After 2 days of work,
my fingertips will start to bleed.
It's an easy job,
but it can be very tough and painful.
Also, cover the hardware with urethane.
Heat will be transmitted
from the foundation to the anchor bolts
and then to the air layer.
That's why I cover all the hardware with urethane.
This is my favorite snack time.
The owner of the house always brings us these.
Thank you very much!
It's sweet.
It's burning.
Now, install the foundation vents.
These vents are manually opened and closed.
Open and close them twice a year
in spring and fall.
Close them in winter
and open them in summer.
Now, put up the foundation insulation.
It's cut to size in the same way.
The thickness is 25 mm,
which is not as thick
as the insulation used in the walls.
I'll put it on the foundation
in the lower part of the house.
Heat will be transmitted into the house
from this concrete.
This type of foundation insulation
prevents that from happening.
As you can see,
I am using a lot of caulking material
to attach the styrofoam insulation.
The caulking material smells a little
like paint thinner until it hardens.
But it's completely harmless
after a week of hardening.
Of course,
after installing the styrofoam,
make sure that the air can circulate
both inside and outside.
If the air circulation stops,
then styrofoam sweats
and the wood will rot.
That's why we let the air circulate.
The air doesn't enter the living space.
It's kept within the walls
and is then circulated
to the highest part of the roof
that looks like a smoke vent.
Carefully apply the urethane
around the ventilation.
If I apply too much,
the vent won't open and close.
Therefore,
apply a thin layer of urethane
around them carefully
to make sure that they can open and close.
And finally,
apply urethane neatly
between the foundation,
the base,
and the styrofoam.
Now the styrofoam is completely installed.
Later,
about 100 holes will be drilled in this wall
and a damper with a valve
will be attached to it.
This is a very labor-intensive method
of installation,
but it works very well.
So, I've finished
the first-floor installation work.
I'm only halfway through.
I have a long way to go.
Next time,
I'll be working on the sash and the eaves.
That's all for today.