Terrasse selber bauen - Schritt für Schritt Anleitung

Florians Gartenwelt
51 followers
12 Video Views·Dec 11, 2022
So greetings friends and first of all as always a very warm welcome to my new video
As you can see in the background we have built a small terrace using natural stone slabs
And I have recorded the construction as always with the camera
And I'm making this video into a short tutorial video
That means if you want to build a terrace in any way the video could be interesting for you
I will say a little something about the technical background knowledge that is needed
And I will then explain everything to you step by step so that you can do it yourself
Then I wish you a lot of fun with the video
Yes a big thank you again to Heter Naturstein
They have kindly provided these really beautiful natural stone tiles for this video
This is our office terrace where we
can also relax and wind down after work
And yes we will certainly have a lot of fun with it
Yes as I said it's supposed to be a kind of tutorial video
And I will now guide you step by step through the video
And we will then look at each individual work step
And I will also say something about it beforehand
Yes first of all it should naturally be clarified where the terrace is even planned
Once you have a clear understanding of it you can mark
it off and if necessary change the positioning again
If that is clear and fixed one precisely marks the area
adds the heights and especially the vanishing points
Then one begins the excavation work
I didn't film this either because we are doing it in a let's say
More or less a nighttime and fog operation
Exactly but it's not really interesting anyway
In principle I would recommend having a excavator on hand for such a large one
And maybe a small device can be made to transport the excavated material away
Maybe you could also store it in the garden which would be even better
You generally need to dig about 30 cm deep
for such a terrace 30 cm is always the minimum
That means when you have excavated 30 cm and then realize
Okay there's still organic material there so you'll have to dig further
Until there's no more organic material visible
Because organic matter is not load-bearing
Approximately 30 cm because 20 cm of gravel is planned
8-10 cm concrete
Then there is another plate depending on the natural stone plate also about 2-4 cm
Also I'm just going to throw 30 cm into the air That 's
at least what you should have for such a terrace
It is very important to dig out the entire area 10-20 cm wider
That's simply because you have now set the size to 4x4 meters
In fact it was not yet considered that some joints are
also planned somewhere and these must be added later
So naturally an extra few centimeters are added
This way naturally there is also the option to later attach back supports
Concrete back supports or edge stones that also stand on this wider gravel foundation
So once you have excavated the area it's time to build the yield layer
Choose a mineral mixture of 0-45 mm or 0-32 mm
Just what is available regionally with you and what is not so expensive
You can also choose water-permeable materials if that is required in your case
However most gravel which is coarse is also very water-permeable with a size of 0-45 mm
But in case of doubt there are also sifted mixtures available with particle sizes of 5-45 mm
They can then also be installed
Generally if you don't have a suitable heavy vibrating plate you should install the gravel in layers
We had 20 cm here and we only had a shaking plate that weighed 120 kg
and for this 20 cm it was also a bit too much all at once
This means we have installed two layers a 10 cm one and then also compacted them separately
Make sure the gravel is wet in order to achieve optimal compaction
If it's completely dry now you can install it and then just hose it down again
Shortly before you shake it moisten the surface
Then you end up with much better compaction than when you compact dry material
It is important that the base layer is laid as flat as possible without any large gaps or bumps
If that's the case a bit more work is still needed
Please also plan a slope in the load-bearing layer of at least 1.5%
So that water which is pressed through the joints and accumulates on the load-bearing layer can drain off properly
That is why it is important that a base layer also drains the water itself and not just the surface layer
Because water that stands on the base layer and expands when freezing in winter can naturally cause damage to the surface
and that is something we definitely want to avoid
In the next step I will show you how to mix the glue
We always use pure cement which you can get at the hardware store
It's not expensive you don't need to be sold any expensive glue
I can guarantee you that this lasts better or at least as well as all the adhesives you can buy at the hardware store for a high price
Also buy a pure trass cement which comes in 25kg bags
We still mix it with an adhesion promoter
I also mix the products right away
We always mix a sack of trass cement which is 25kg
Mix it thoroughly until it's smooth you'll see that right away
We always put 1.5 liters of bonding milk or primer on a bag of trass cement
and mix it then into a homogeneous mass
Then the bottom of the plates is coated and you can then glue the plate into the grout mortar
Then we can now move on to the exciting part which is ultimately laying the plates
You will need the adhesive which should already be pre-mixed but not for too long because otherwise it will start to dry out
Now make sure you spread the dry mix evenly
Apply it in a layer at least 8-10 cm thick
It is important with natural stone that you lay it fresh on fresh because not all tiles are the same
That's why you can also see how we create a separate plan for each record
We cannot remove the entire area and then lay the slabs into a uniform bedding
But we always remove one row at a time one plate at a time and then adjust the plates individually
I also personally think that even if you removed it it would be faster with the hand plan
But that might just be a matter of taste
Each plate is then placed as mentioned fresh in fresh
This means the mortar is removed the plate is coated with adhesive
The underside which you have mixed and then the plate is worked into the still fresh mortar
As a small tip and you will see that we do it the same way too
For each row we always install a safety rope that indicates the escape route which can be used to align the plates
The cord also indicates the height of the plates
This means you don't need to measure much at all
Of course you have a level but basically you can always check the tiles you lay with a ruler
Always align with the string from both the height and the flight
Then the row that has already been laid
Of course you can go then after you have already laid a few tiles
And just place the straight edge or a level on top and simply
check whether you have laid the tiles straight without any bumps
So what you can see here is that we have been working in the half-stone alliance
And with natural stone it is usually the case that there are no half tiles at all
But you must trim your Rausseits
And do yourself a favor and your health
Cuts it using a wet saw
There are also dry cutters with suction which produce much less dust
Also I can only recommend it because the dust is really very very
harmful to health and also not particularly good for the environment
Yes a small tip for cutting
Mark the cutting line clearly with chalk or a pencil
Then it cuts this line first without really penetrating deep into the material yet
I do that partly dry because as soon as you cut with
water most pens including chalk will be washed away
That means you can first cut a dry line
just a little bit only remove the material
Yes and it really does serve as a visible edge but also
as a guiding edge where you can simply make the cut through
This cut will then be very very clean
So I would never recommend trying to cut through the full strength of the plate directly
It really doesn't look nice in the end unlike when
you first draw a really nice straight cut
line with the appropriate tool
So the availability is already in
place We have the plates firmly
laid here and this is an important rule that one should definitely remember
When laying with a fixed installation one should also fix it securely and when
laying with a loose unsecured installation one should also lay it loosely or unsecured
So here we have the 2K joint mortar from Heter in the color Basalt
Also that's another nice contrast because we have
a light tile and you can see the grout is dark
So one sees the record and appreciates the record as such
The groove creates a beautiful frame around the record
For a dark plate or a dark stone I would
always recommend a light-colored grout in person
In the following I will show you how we process it
I would ask you depending on the grout you use
Always pay attention to what the manufacturer explicitly recommends
and on every bag of grout mortar you will also find an instruction
But it varies from manufacturer to manufacturer
This joint mortar from Heter the most special 2K paving joint mortar
I really can only highly recommend it
You can also buy it there
You will also find the product manual or processing instructions on the page
I will now show you how we carried it out properly
and actually doesn't want to say much more about it because
really every grout has its own processing instructions
It is also very very detailed
That would also somewhat break the video here
Still a few more notes from me
It is important that the surfaces are really extremely clean beforehand even dust-free
because the epoxy resin in these grouts which seals the stones also seals them a little b
And every dirt that is still there gets bound to the surface even more
And then one of the most important pieces of advice I can only strongly urge you to take to heart is
Hold a transparency ready you will see it in the video
A strong chill ran through us and if we hadn't had the tarp
Then the opportunity would have been gone then we could have done it all again
Because the mortar must be protected from
moisture and heavy rain in the first 24 hours
Hello friends I hope you liked the video so far and
that you've finished building your own building block
I am often asked what the situation is with impregnations
I would like touch on this topic again briefly in this video
because many people currently have the problem with porous
natural stones that stains or dirt adhere more easily
Yes sometimes you can take a bit of preventive action with a
waterproofing treatment which now also lasts for a very long time
but from my own experience I say there is no impregnation
It now lasts for decades but rather only up to 2 or 3 years at most
Exactly and of course you can apply a waterproofing treatment
en the plates are protected from oil dirt and dust
It is then easier to remove and in such a case a impregnation makes sense
You can also seal the plates so that they do not absorb
water at all and impregnation is naturally always a good idea
Because plates that can no longer absorb
as much water develop less patina on them
It's always a matter of taste if there were a personal
terrace of my own I think I wouldn't impregnate it
Because I actually think a little bit of a natural touch is not bad at all so I'll just say that
But there are certainly enough people yes and constantly who would like a treatment
And that's exactly what I wanted to show again in this video
Also for the video posted by Heter Naturstein I have their own impregnations here
Product B you can also look at the product online with them
There is the entire instruction on how to apply it what to pay attention to it is all there
I won't go into great detail here because that would slightly exceed the scope of this video
But I would like to show you how to apply it and of course I will also tell you a few words about it
Yes before that it is very important to clean the surfaces
So they should be dust-free
Leaf blowers you don't have to have one from Stihl now but any other one
And yes it cleans the surface
If there is heavy dirt take a garden hose and a stiff brush and scrub it all first
Then before you finally impregnate it run the leaf blower over it once more to make sure all the last traces of dust are gone
If anything else is on the terrace then it will also be bound to the stone with the impregnation
That's why she should already be relatively clean
Yes basically I would always wait at least two to four weeks for the impregnation
after you have finished the terrace or the paving work
For you must imagine that the mortar whether you take cement-based or epoxy mortar
He is relatively quick to get hard but it takes a while before he is fully erect
It will still take a few weeks before all connection and stabilization processes are completed
Especially with cement-based grouts they are only fully hardened after a few weeks
And such a waterproofing is also chemical and can possibly interfere with the curing process
That means I would wait two to four weeks first
Take your time to clean everything thoroughly and then I will apply the waterproofing
You can naturally apply the impregnation with a brush or a roller
but I really can only recommend that you take a spray bottle like this kind of pressure sprayer
Probably everyone at home fills it up with impregnation depending on how you need it
You are simply much faster and you can apply it much more evenly
Exactly so that the base does not pass through these impregnations even if you take another one
This one is ready to use here so it doesn't need to be mixed but of
course there are also some that still need to be diluted with water
Therefore don't just copy but really align with the product you are using
And of course you can buy this here from Heter Naturstein it's also for sale
You can find it again on the website with the instructions
And yes then you can read it again there and nothing will happen
You can't make any mistakes either
So friends you have seen how I just applied it with the sprayer
It's best to calculate in advance how much you need
You need 100 to 200 milliliters of this heter-penetrating agent per square meter
And this amount you just simply inject into the syringe and you also know approximately how much you need to apply
So the impregnation is drying here now
One must ensure that it does not rain for 4 hours afterward otherwise it must be protected from moisture
So you can now clearly see how the impregnation is slowly drying
It has been about 2 hours since I applied the impregnation here
So I'll show you that again briefly on the wall stones
I sprayed that briefly earlier as well
You can clearly see how the droplets bead up
But in the end it can no longer penetrate the material
So then I'll show you this block step here
It is made of the same type of rock as the slabs
And I even filmed the whole thing but unfortunately the lens was wet so you couldn't see anything
Therefore I'll just say that briefly
We simply placed them in 15 cm of concrete which we also mixed with rapid-setting cement
So that there are no efflorescences here
Then we aligned them flush on top here so that no edge is created
And so the terraces steps and surrounding walls were all made from the same material
The impregnation is now about 10 hours old
What you see here on the natural stone level is no longer visible
Nothing left on the wall either just the natural stone slabs are still a bit wet in the front area
But that disappears as you can already see quite nicely here that all these surfaces are already completely retracted
If we wait another 10-12 hours nothing will be visible anymore
So friends we are now slowly reaching the end of the video
First of all heartfelt thanks for sticking with it this long
I hope you were able to take something away and that your questions regarding terrace design and construction have been largely answered
If you have any questions or things that are unclear feel free to use the comment function
I will try to answer your questions when I have time
I have written a guide on my website that is a bit older on this topic
I also presented other materials here
You should also take a look at them
I will also link this in the video description
Yes what else is there to say
Those who are interested can follow me on Instagram Floriansgartenwelt
There you can then get a little glimpse of the daily routine at the
construction site Of course it's easier for me to take a few pictures to upload
Also creating a complex video here
That's why you really get weekly input
If you liked the video I would appreciate it if you could give it a thumbs up
I would naturally welcome any comment
Yes and subscribe to my channel
A few more exciting videos will come this year
I have some as well regarding terrace construction
Some of them are already quite old I think one is from 2014
You can also take a look at it again if you like
Then I basically just have to wish you all the best
For the coming time
I look forward to seeing you again in our next video
All the best and see you soon