Regardless of how they were constructed, the Egyptian pyramids of the Giza Plateau represent
one of mankind's most astonishing engineering achievements. The logistical challenges of moving
millions of tons of building materials to the site would have been immense, yet the mere existence
of these ancient marvels proves the Egyptians found a way to do it. And evidence is building
to move heavy quarry stones. Archaeological and urban development excavations in the region
have revealed the existence of a series of canals and basins that experts are certain were used to
carry materials, including the limestone and granite that make up the bulk of the pyramids,
to the Giza site. These man-made structures would have harnessed the flow of the Nile
and created a direct connection between Africa's most famous river and the Giza Plateau. This
passage would have been perfect for the pyramid builders to save time and money. In ancient
Egyptian manuscripts known as the Wadi el-Jarf Pipire, the design of the water diversion project
that allowed for the transport of materials to the Giza Plateau is described in detail.
These documents relate how limestone was quarried at a site known as Tura and transported to the
construction site of the Great Pyramid of Khufu, the largest of the three Giza pyramids.
The canal route that connected the quarry with Giza covered a distance of 11 miles,
17 kilometers, and archaeological discoveries in the area have confirmed that the basins,
ports, and canals described in the Wadi el-Jarf Pipire really did exist.
This type of interlocking system of waterways would have been absolutely necessary to transport
heavy construction materials to the Giza building site. The Nile is located five miles,
eight kilometers, to the east of the pyramids, and that would have made overland transport of
millions of tons of building materials impossible. Key to the operation of the canal system was a
now-extinct tributary of the Nile known as the Khufu Branch, which ran along the western edge
of the Giza floodplain. This natural channel would have comprised the final link in the Nile-Giza
Canal network. Up to now, however, no analysis had been performed to demonstrate that water
levels on the Khufu Branch were high enough to make the passage of transport boats possible
during Egypt's fourth dynasty of the Old Kingdom, 2,686 to 2,160 before Christ, when the pyramids
were allegedly erected. That oversight has finally been rectified, thanks to the efforts of a team of
French scientists who've just published a new study of the ancient Khufu Branch in the Proceedings of
the National Academy of Sciences. The scientists have confirmed that water levels on this Nile
tributary would have been sufficient during fourth dynasty days to create a permanent link with the
artificial canal system, making it possible for supply boats to carry millions of tons of limestone
and granite directly to the Giza Plateau, tracking ancient plant growth to reveal the facts.
So how exactly were the French scientists able to calculate water levels of a river branch that
dried up thousands of years ago? To obtain this knowledge, they relied on an indirect but ingenious
method that gave them accurate information about what water levels on the Khufu Tributary would
have been in ancient times. On the ancient floodplain surrounding this now-defunct section
of the Nile River network, the scientists collected pollen grains from different sediment
levels. They did so by drilling and removing pollen core samples from a location just east
of the pyramid complex. Using this approach, they were able to track changes in the historical growth
patterns of 61 different plants that can thrive on floodplains, depending on the frequency of
flooding that occurs, which in turn depends on water levels of the flooding river or tributary.
Putting together the pieces of a complex puzzle, they were able to calculate water levels in the
Nile's Khufu branch over 8,000 years of Egyptian history, extending well past the point in time
when the pyramids were allegedly constructed. It turns out water levels on the Khufu were highest
during the African Humid Period, which lasted from 14,000, 800 to 5,500 years ago. From this time on,
water levels began to recede gradually, but the Khufu branch remained at an elevated level
throughout the Old Kingdom period. The Great Pyramid of Giza, which is said to have been
constructed as a monument to the pharaoh Khufu, and hence the name Khufu branch, was completed
approximately 4,500 years ago, as were its two partners, the pyramids of Chaffer and Menkaure.
At this time, the Khufu tributary would have been navigable, making the movement of heavy
construction materials, primarily limestone and granite, a viable enterprise. Celebrating two
works of engineering genius, the authors of the article in the Proceedings of the National Academy
of Sciences explained precisely how the complex river and canal system worked on the Giza End.
The fluvial port complex hypothesis postulates that pyramid builders cut through the western
levee of the Khufu branch of the Nile and dredged basins down to river depth in order to harness
the annual seven-meter rise of the Nile flood like a hydraulic lift, bringing the higher water
levels to the base of the Giza plateau. They wrote, in this way it was possible to transport
supplies and building materials directly to the pyramid complex. The canal and river system would
have allowed for the transport of materials and people over much longer distances as well.
It was built to facilitate monument construction of all types in ancient Egypt, and it also
connected Giza with Egyptian cities in the region. The Nile's annual floods provided all the water
that was needed for such a system to work, once the Egyptians had figured out how best to capture
it and use it for their benefit. While not a match for the pyramids themselves, this interlocking
system of canals, basins, ports, and natural river tributaries that unlocked the transportation
potential of the Nile, was itself a work of engineering genius of the pyramid builders.
Without such a system for redirecting water to where it was needed,
Egypt's monument building activities would have been severely restricted.