Hey what's up everybody this is CLS All-in-One. Today I'll be showing you how to prep, form,
and pour a concrete slab. This concrete slab measures 12 feet by 14 feet by 6 inches thick
and is reinforced with half inch thick rebar. Now for most situations a four inch slab will
be plenty thick enough. It just depends on the use. This slab will be used for a gazebo
and some patio lawn furniture. Concrete slabs such as this may work for a variety of other
structures such as a garden shed. But you do want to keep in mind depending on the size of
your structure and the local building codes a footing may also be required. Now let's get
started. The first step will be measuring and marking where the slab will be located. Mine will
be located approximately 10 feet from my house in one direction and 16 feet from my house in the
other direction. And to make my marks I'm just using some yellow striping paint. If you have
existing structures on your property it's usually best to square your slab with these existing
structures. Now it's time to remove any vegetation or unsuitable soil that may exist in the area where
the slab will be located. Mine will be in this grassy area so I will need to remove all the grass
in this area. And as you can see here I'm using a small tractor with a backhoe attachment to dig
this area. And this really saves me a bunch of time that would be spent on manual labor. So the
yellow outline that I have marked here in the grass represents the exact size of my future
concrete slab. And what I'm doing here is slightly over digging this area by approximately one foot
and digging down approximately six to eight inches to remove all the grass and unsuitable soil.
After digging down six to eight inches I'm left with a dirt composition that consists mainly of
sand and rocks which is a suitable base. But if the area you are digging contains a lot of clay
like dirt you should probably plan on digging down a couple extra inches to add a proper base
such as gravel or road base which will allow proper drainage. After removing all the vegetation
in this area it's time to mark the grade of the concrete slab. My slab will be poured level but
my yard has a slight slope to it and I want the grade of my slab to be at least a couple inches
higher than the highest point in my yard in this area. So this is the highest point in my yard
and the top of this grade stake represents where the top surface of the slab will be located. And
to set these grade stakes I used a builder's level and placed a grade stake in each corner
at the exact same height and made sure to set these stakes at approximately one foot wider
than the actual size of the concrete slab. So my slab size is 12 by 14 and my stakes are set at 13
by 15 and this will leave me a little bit of room to work and grade without the stakes getting in
my way. As you can see here I've tied a string line to the top of the stakes going around the
perimeter and I've also tied a string line going diagonally across as well. These string lines
represent where the top of the slab will be. So I can now use these string lines to check the grade
and see if I need to add some base material or possibly dig down deeper. My slab will be
six inches thick so I'm looking for a grade height of around six inches. So to check the grade of the
dirt I can just use my tape measure like this and see where the string lines up on the tape measure
which is around eight inches. So I will have to add some base material in this area to get proper
grade. And now I will go ahead and check other areas on the string line to verify the grade all
the way across. And it appears I'm plenty deep enough everywhere inside this area. It's averaging
anywhere from eight to nine inches deep so I will have to add about two to three inches of base
material to this entire area. For my base material I'm just using a sandy rock mix which is suitable
in my area. The building codes or poor dirt composition in your area may require a gravel
base of around four inches thick to allow proper drainage. And you will also want to keep in mind
any base material you add will need to be compacted with some water moisture added to it as well
for the best compaction. Compacting the base material will also lower the height. For example
I'm trying to add approximately two to three inches of base so I will have to add an extra
inch of base because I know it will compact down quite a bit. So I've tried to level this out as
close as possible and I did remove that string line earlier to add the base material. Now I will
go ahead and tie the string lines back in place and check the grade once again. And what I'm trying
to achieve here is a height of around five inches because I know more than likely it will compact
down around one inch. The compaction results will most definitely vary depending on the type of base
material you're using and the dirt in your area. And it looks like everything is going as planned
because the grade is very close to being five inches. I just have a few high spots in the middle
and a low spot on the edge so I can just rake the dirt from the middle over to the edge to achieve
a five inch grade. Now it's time to add some moisture to this area to get it ready for
compaction. And for this I'm just using my garden hose to spray this entire area with water.
After letting the water soak in for a few it's time to start compacting this entire area.
And for this I'm using a walk behind compactor also known as a jumping jack. To compact I start
at the edges then work my way to the center. Then repeat this same process at least one more time
to get the base nice and compacted. After compacting you may be left with some small ridges
in the base that will make it look uneven. But these can easily be raked out and leveled out
pretty quickly. Now it's time to check the grade again. So I will run my string line once more
then check the height across the whole area. And what I'm going for is six inches. So I'm very
close to where it needs to be. Most spots are right at six inches. But I do have one high spot
here on the left side that needs to be cut down slightly to reach the proper grade. And now this
entire area is at a six inch grade and it's ready to start forming for concrete. So depending on
your location you may be able to just rent some forms. But if that's not an option you can just
use some two by sixes for a six inch slab or some two by fours for a four inch slab. I will also be
using some half inch rebar to add some reinforcement to the concrete slab. The rebar will be installed
in a two foot grid pattern and will rest on some three inch tall rebar chairs. To secure the two
by sixes together I will use some three inch screws. And to secure the two by sixes to the
ground I'll be using some concrete form stakes that can be secured to the two by sixes with the
use of two inch screws. So I have some two by sixes here that have been pre-cut to make some forms
with an inside measurement of 12 feet wide by 14 feet long. The two by sixes I'm using are fairly
straight but I did make sure to point the crown of the lumber up to avoid creating any low spots
in my concrete slab. To get the first two by six in the correct position I've relocated the corner
grade stakes to exactly 10 feet away from my house in this direction. And the left corner stake is set
at exactly 16 feet from my house in the other direction. And I set the grade stakes at a height
of five and a half inches so they will sit slightly lower than the top of the two by six
which will allow me to screed and finish the concrete without the stakes getting in the way.
Now I can use a couple form stakes to secure the two by six to the ground. The stakes I am using
are fairly long. For most situations a two foot form stake should be plenty long enough.
And again with these form stakes I'm making sure to drive them down to just below the top of the
two by six. Then I can raise the two by six towards a half inch higher than my grade stakes. Then
secure it with a screw going through the grade stake into the two by six which should put the
top of the two by six right at six inches because my grade stakes are set at five and a half inches.
And to start with I will only secure this form with just a few form stakes because I may have
to make some adjustments later on after I double check the forms with a builder's level. And
because a two by six actually measures at one and a half inches by five and a half inches
there will be a small gap at the bottom of the two by six which is no big deal because I can just
rake a little dirt against the outside edge later on. Now that this first two by six is secured
I can go ahead and screw the side two by sixes to this first board with some three inch screws.
And the top of these two by sixes should end up flush with the first two by six. And for now I
will wait to secure these two side boards until I get the forms perfectly square. Now it's time
to screw the last board in place with some three inch screws into the side boards. And the same
thing goes for this board. The top of this should end up flush with the other two by six boards.
And in case you just missed it my son just video bombed my video but he is helping me out. And I
will also wait to secure this back board to the ground until I get the forms squared. To get the
forms perfectly squared I can use a method called the three four five rule which involves measuring
from one corner three feet out then measure from the same corner in the other direction four feet
out then measure the distance across. And if that equals five feet that means it's perfectly squared
with a 90 degree angle. And this method also works with other multiples such as six eight and ten
which is what I used to square these forms. So when you're using this method to square the forms
more than likely it's not going to be square from the start. And you're probably going to have to
left or right to get the forms to square properly. So my forms here are now nice and square and ready
to be secured to the ground. So now I will grab a couple form stakes and drive them into position
on the back two by six. And I've also added a couple grade stakes on the back corners as well
to reference where the grade height should be on this board. So here's a look at the back two by
six. On the corners I have a couple grade stakes set at five and a half inches. And just to the
inside of the grade stakes I have a couple form stakes that have been secured to the two by six
with screws. And the two by six is set at approximately half inch higher than the grade
stakes which puts it at six inches. Now before I add more form stakes I'm going to go ahead and
double check the top of the forms in all four corners with a builder's level to confirm everything
is at the same exact grade height. So the first two corners are spot on but the third corner
needs to raise about one quarter of an inch. So I will quickly make some adjustments here
and then check again. So now this corner is at the correct grade and now I'm going to move on
to the fourth corner. And this one appears to be at the correct grade already. And now it's time to
go ahead and add some form stakes to the perimeter. And I'm going to space these at a minimum of
every three feet. And as I mentioned earlier with all of these stakes I'm making sure to drive these
down at least half inch below the top of the two by six boards. And secure each of these stakes
with at least one screw. And I will just keep repeating this process all the way around these
forms. And here's a quick look after getting all the form stakes in place. Now I can go ahead
and rake a little dirt against the bottom edge to seal this small gap at the bottom of the forms.
And now it's time to grease the forms. For this I'll be using some WD-40 but alternatively you
could use some other products such as diesel fuel applied with a rag. And you can also grease the
forms before installing them as well. The objective here is to grease the forms anywhere where the
concrete will make contact to keep the concrete from sticking to the forms. The next step will
be adding some rebar. This is half inch rebar and I'm installing this in approximately a two-foot
grid with the edges of the rebar being spaced at least one and a half inches from the edges
of the forms. Rebar reinforcement is not always necessary but it will most definitely make the
slab stronger. I am using 10 foot long sticks of rebar for this project so I will have to make
some extensions to cover this area. There is numerous tools for cutting rebar but a cheap and
easy way is with a four inch grinder and a metal blade. And what works good for me is to cut the
rebar halfway through from one side then flip the rebar over then stand on one side of the cut with
my foot and pull up on the other side of the cut with my hand to snap the rebar off. So by cutting
only halfway through this makes the metal blades last quite a bit longer. To tie the two pieces of
rebar together there should be at least a one foot overlap that's then secured with some rebar tie
wire or some rebar ties such as I'm using here. So with these rebar extensions right here I have
approximately a one foot overlap and I'm tying these together in two different spots. Now it's
time to lay out my rebar in the other direction in a two foot grid as well. Then I will tie the
rebar together in every location where the rebar overlaps each other. Now it's time to add some
rebar chairs. These are three inches high and we'll lift the rebar so it'll be centered with
the six inch slab. And I will be placing these chairs at all points where the rebar overlaps.
After placing all the chairs into position I then tie these to the rebar with at least two ties for
each one. Now for some situations it may make more sense to add the rebar chairs as you are pouring
the concrete especially if you're using a wheelbarrow to dump the concrete. For a situation like this
you can use clip-on rebar chairs and add them as you go. And here's a look at the rebar after tying
it all together with the rebar chairs. Right here at the edge I have a rebar chair with two ties.
Then if we go to the next intersecting point of the rebar I have another rebar chair with two ties.
And anywhere where I have a rebar extension I also have two ties as well. And right here what
I have done is mark the outside of the forms where the rebar is located. And this will come in handy
when I start pouring the concrete. I'll be able to reference where that rebar is so I can avoid
stepping on it. I have also added a couple grade stakes to the center of the slab location.
And I can use these to reference where the grade height should be when screeding the concrete.
And then hammer these down below grade as I go. And what I've done here is run some electrical
conduit that runs underneath the forms. And this will pop up through the concrete after the slab
is finished. And this will be for a future electrical project on my gazebo. Okay it's just
about time to start pouring the concrete. So I'm going to go ahead and spray down this area with a
little moisture. And I do have some concrete on the way that's being delivered with a concrete truck.
To figure out how much concrete you need there is various concrete calculators online
where you can enter the length width and thickness to calculate how much you should order
or make. My slab is approximately 12 feet by 14 feet by 6 inches thick. So I need approximately
3.1 cubic yards. But I went ahead and ordered about three and a quarter yards just to be on
the safe side. For a screed board I'm just using a greased 2x4 that's long enough to reach all the
way across. But depending on the size of your slab you may not be able to screed all the way across.
And that's where grade stakes in the center can come in handy. Before your concrete arrives it's
important to have all your tools out and ready. Such as a water supply, floats, trowels, edgers,
rubber gloves, rubber boots, a bucket of water, and other common concrete tools. So with this job
the concrete truck can only reach about halfway. So we will have to push some of the concrete to
the other end. This first batch of concrete that was dropped out of the chute was a little dry
and had to be moved by shovel. So before dropping any more concrete we had the driver add some more
water to the mix so we could easily push the concrete to the other end. But it is important not
to get too carried away with water because this will weaken the structure of the concrete. So now
the concrete is at a consistency where we can push it with rakes to the inside edges. And with all
the edges we make sure to pack them thoroughly as we go. So what we're trying to do here is pull
and push the concrete to these edges. And we're trying to get the first four to five feet full
all the way to the top of the forms so we can start screeding the concrete. So in an ideal
situation if the concrete truck was able to reach all these outside edges with the chute that would
save us on quite a bit of labor. But this is still way easier than trying to make the concrete
ourselves and moving it with a wheelbarrow. And it looks like we're just a little bit low still
here in the front so I'm gonna have them dump a little bit more and start pushing the concrete
towards the front. I'm gonna jump in the middle here and rake it towards my wife and she'll pull
to the edges here. So when you're pouring concrete on a hot day especially in the middle of summer
when it's going to be 90 or 100 degrees you want to try to pour in the early mornings. That way
you're not at the hottest point of the day because that concrete will start to set up really fast.
And before I start screeding an area I like to make sure that the top surface of the forms is
nice and clean. That way that screed board can sit nice and flush. And now we're going to use
this screed board to start pulling the concrete back and kind of use a saw in motion as we're
pulling it back with the top of the board being slightly tilted back towards us. So what the
objective is here is to get the concrete level with the top of the forms. And this will usually
involve multiple passes. And at the end of each pass you want to make sure to lift the screed board
before you start the next pass. So we have screeded approximately three feet so far and now we need
rake some more concrete forward because we have some low spots that need to be filled. I'd also
like to mention I will be using a long handled bowl float to float the concrete after screeding
the entire 12 by 14 area. If you plan on using just hand floats then I would suggest only screeding
about three feet at a time which will allow you to be able to hand float the concrete as you go.
So at this pass we're screeding a little bit bigger area. This is around five to six feet.
And if you end up with any areas that are excessively high sometimes it's easier to just
use a rake and pull the crete back. And if you have any low spots you can just push it forward
with the rake or just use a shovel to move it where needed. And now it's time to go ahead and
pour some more concrete. So I'm going to have the truck driver drop some more crete towards the back
right here. And I'm trying to make my best guess here to get the correct amount of concrete inside
the forms. If you get too much that becomes quite a bit of work to get rid of that excess concrete.
And we're getting really close to being full here. And it looks like we can have him go ahead and
stop now. We should have enough to go ahead and finish this area. So again here with the rakes
we're making sure to pull the concrete all the way to the edges and try to get this as level
as possible with the top of the forms. And also pack those edges at the same time. And right here
we're using the screed board again. So we're making multiple passes here using kind of a
saw in motion as we're pulling back. And before I forget I need to knock down the center grade
stake that I have in the middle right here. So I've hammered this stake down about one and a half
inches. And now we can use that screed board to start going back over the top of this area
to fill in this small hole. So we're now right at the last three feet with the screed board.
And we have a couple high spots here on the left side. So we have to grab my rake and go
pull some of this material off. So I tried to make my best guess to get the right amount of
concrete inside the forms. But it's definitely better to have a little too much than not enough.
Now that I have all that excess concrete out of the way we can use our screed board to make a
couple passes to get this nice and level with the top of the forms. So now we're done with
the screed board and we can go ahead and put this off to the side and rinse it off. And right here
I'm using a hammer to tap the side of the forms. And what this will do is help the concrete settle
a little bit better on the edges to keep any pits or small voids showing on the side of the concrete
after removing the forms. Now it's time to start floating the concrete. For this I'm using a
long-handled bowl float. But it's not quite long enough to reach all the way across. So I will have
to make some passes on both sides. When floating with this style of float you want the front of
float to be slightly tilted up when pushing forward. But when you're pulling back you want
the back of the float to be slightly tilted up. The goal is to smooth the concrete and fill all
small voids while being careful not to dig into the concrete during this step. You're trying to
just float on top of the concrete. To get the concrete nice and smooth it will usually take at
The float pushes the aggregate down into the concrete which allows moisture to rise to create
somewhat of a cream at the top of the concrete which is used to fill the small voids and achieve
a smoother surface. Here is a look at the concrete after using the bowl float. And as you can see the
surface is quite a bit smoother. Now I will use some hand floats to smooth out the edges and
remove any lines left from the bowl float. The hand floats can achieve the same results as the
larger floats but require more labor and are used in somewhat of a fanning motion. And with whatever
direction you're pushing the hand float you need to make sure that that edge is slightly tilted up
to avoid digging into the concrete. And at this point we're not stepping onto the concrete yet.
All of this hand floating will be done from the outside of the forms. It would also be a good idea
to keep the top of the forms clean as you're working around the edges. That way none of this
debris comes back into your concrete and ruins the finish. After getting all the hand floating done
it's time to wait for the concrete to just barely start to harden. To the point when you push your
finger into the concrete it pushes down no more than half inch. At this point if you plan on edging
the concrete now would be a good time. Using an edger will compact and round the corner slightly
and give the concrete a more finished look. This tool slides right into the edge between the
concrete and the form. And I usually just slide it in one direction with the front edge of whichever
direction it's going being slightly tilted so it does not dig into the concrete. And this will
normally take a couple passes to achieve a nice and rounded corner. Once the concrete hardens to
the point where your finger can only press down into the concrete around one quarter of an inch
it's time to start finishing the concrete. And if just a broom finish is planned that could probably
be started now as well. But you will have better results if you do a quick trowel finish first
before brooming. When finishing I usually move my trowel in a fanning motion or a figure eight motion
and make sure to keep the edge slightly tilted to avoid digging into the concrete. When working
outdoors in direct sunlight especially on a hot day the concrete can start to set really fast.
In these conditions you will want to work fast and efficient to get the concrete finished in a
matter. If you are unable to reach the middle of the slab from the outside of the forms you will
need to either buy a pair of knee boards or you can make your own poor man knee boards as we did
here. These are just two foot by two foot pieces of inch and a half rigid foam insulation that have
been lightly greased to keep them from sticking. These worked fine and got the job done. But if you
have the extra money I would recommend to just buy a pair of knee boards. So at this point the
concrete is drying really fast so we did sprinkle a very small amount of water onto the slab
to help make the finishing go a little easier. And here's a look at it after finishing the concrete.
Now there is some more work that's involved but first I will let this just sit for a few hours
then come back. Okay so a few hours have passed now and now that concrete is starting to get pretty
hard. So now what I'm going to do is go ahead and mist the concrete and what this is going to do
is help the concrete cure slowly and this will help improve the chances of the concrete not
cracking. And this will also help with the strength and durability of the concrete slab
if it's cured properly. And you should continue to spray the slab about five to six times a day
for at least the next five days. But I would like to mention if you're pouring the concrete
in cold climate weather spraying the concrete will probably not be necessary. After waiting
approximately 24 hours with warmer weather climate the forms can now be removed. And to remove the
stakes what works good for me is to use a large pair of channel lock pliers to grip the stake
then I twist it back and forth while pulling up at the same time. And now that I got the
stakes removed I can start removing the two by sixes. Now it's time to cut some joints in the
concrete. For this I'm using a walk behind concrete saw and I have some marks in the center of the
slab going both directions which is where I'll be making my cuts. For a six inch thick slab
the depth of the cut should be around one and a half inches and the space between the joints or
edges should not exceed over eight feet. For a four inch slab the depth of the cut needs to be
around one inches. Without controlled joints like this the concrete will more than likely crack
with any slab that's wider than eight feet. So here's what the slab looked like after cutting
the joints. And here's what it looked like after doing a little backfilling around the edges.
And in the front here we did a little bit of landscaping. We put some rock in the front here
with some stone edges. And here's another before picture. Here's the yard before
and after in the same location with the concrete slab. Here's another before picture and after.
So at this point here we still have to plant some grass around the edges of the slab area.
And I'm also going to be installing a gazebo at a future point and that will also be a future video.
Okay it's now time for me to go. If you like this video if you could hit that like button
and have yourself a great day and I'll see you next time.
And if you haven't subscribed already please hit that subscribe button.