So guys as always a warm welcome to my new
video and you've been waiting a long time for this
In this video we show you how we build a terrace using
ceramic tiles that is porcelain stoneware in 2cm thickness
The camera has been there from the beginning which means we show you
all the important steps and important things you need to keep in mind
Also have fun with the video
So I'll quickly show you the special features we have here
We have two light shafts in this area and we will have to
keep them in place because there are actually windows there
You could now replace them with plastic bodies but in this way they are still intact
The area is also covered here about 2
meters which means moisture does not reach this area
So let's take a look at the undercarriage
There was some antifreeze here which we can of course leave in place
We will shake it again shortly but antifreeze is of course very good it is of
course load-bearing and therefore we do not need to remove and dispose of it
So we have compacted the base again with the vibratory plate for safety reasons
Better safe than sorry nothing can go wrong then
So people how do we start with the heights here
We have to adjust a bit to the circumstances and that is one thing
Here is the light
shaft Naturally we don't want any trip hazard in here so I adjusted the height
Transfer the light shaft simply to the pin here
This means our plates will be flush with the light shaft afterwards
So guys we're currently transmitting the heights or measuring ourselves in
We offer a 1.5% discount on the entire terrace which is completely sufficient for ceramics
This is actually quite easy to adjust
Hold this here level the spirit level completely and then measure at a distance of 1 meter
e distance
At 1.5% that is exactly 1.5 cm
You can also take a 1-meter level which is now a 1 20-meter level
but then you can set the slope like that
What you must check beforehand
is your light shaft which is already here
He is now here in Virgo and so also almost in Virgo so not 100% but because of tha
The slope here where we have a terrace will create a
slight edge here in front
Naturally we don't want that
And since we are in the covered area we will set the first row of plates
flush with the light shaft which then doesn't really have much slope bu
en we just don't have any edges in it
The proper construction of the load-bearing layer also always includes that the load-bearing layer is
e slope of the surface meaning all the water that goes through the joints should the
It can also be derived from the
load-bearing layer always away from the house just like the surface layer
Here it's not quite as important because we are laying tiles and grouting them so
The amount of water that arrives here is minuscule
But I want to show you how to properly build such a structure
and of course a slope in the load-bearing layer is necessary
So let's take a look at the condition of the base layer
We have now reached the top of the wearing course which is visualized here by the thread
We still have about 10 cm that is 8 cm of drainage concrete and 2 cm of slab and then we reach the top edge
I have chosen the top edge so that it matches the height of the light dome
You can see it again here the light shaft determines the height for the cord so have
We put our topping here which then fits neatly
So the gravel base layer is done it is about 10 cm thick plus 8 cm of concrete
Plus 2 cm of padding we have a total build-up of 20 cm
But you must not forget that beneath it
is the antifreeze layer and that is just as load-bearing
Also we have here a completely viable structure otherwise we sometimes build more gravel
one but since we have a completely viable material here we of course have to do tha
It's nonsense to dig any further and dispose of
it we can save the costs and build directly on it
So here you see our gravel once again this is limestone 045
You shouldn't take any gravel without zero shares because the water that later flows throug
e joints are so small that they will certainly also pass through a gravel w
undergoes a zeroing process so you don't necessarily have to take a 545 anymore
Add something like that which can also be done with a 045
For ceramic surfaces it's already the case that the material itself does not absorb water
allows and when water reaches the load-bearing layer it always only through the joint and
The amount is so small that it can seep through the gravel here very well
So guys I'll show you the beginning we've done here
You can see we've already laid three tiles here
Why did we start here with a cut piece
Very simple we transferred the measurement so we start at the corner where it is here
e entrance area if we are to start with an entire plate we have measured
Transfer it and that's let's say the second plate
the rest that remains from it Then it continues further back
We will then start with a half plate so we have
a half-stone band here which looks nice naturally
As a general tip
always think ahead about how you want to lay the tiles
We have of course measured the entire area
here and considered how we can get out at the back
One is naturally more or less bound to the circumstances so to speak bu
You can adjust the band a bit or also how you cut the tiles
Take that into account so that in the end
you only end up with very small pieces
It cannot be completely avoided but we have now decided to start here
Always fully engaged so we have a nice cross-section here in the entrance area
and you can see it here in the second row here
we practically have to remove the next tiles
This is always annoying at first but somewhere you have to start we can't just
Don't start at the back of the garden and work towards
the house so think a few things through beforehand always important
So guys now I'm going to show you the procedure for setting how to pour the concrete
mix I'll show you right away but first people spread out here with the drainage concrete
Then we pull it off by hand we can align ourselves with the string
and the plate that we already have here once you've done it a
few times you get used to it and then it really becomes very easy
Okay then let's get the plate and I'll show you how to install it
This is our adhesive pure trass cement mixed with PCI emulsion which we apply
ere on about half a centimeter thick you can also use a chisel for
Make I mean with drainage concrete where the surface is actually quite rough does it make
It makes little sense to use a dental pick while flowing on a floor plate
Tile adhesive is applied then it makes sense to spread it with a notched trowel
But here it also works like that
So now we have a vacuum cleaner here which means we can suck the nice ones out of
Place your leg there are also other exercises for that I will show you this one now
Then just go over and put the board on the bed then I'll make our spacers here
The gap is 5 millimeters which means we will have a 5 millimeter gap afterwards
Now I would also leave the handle on then you can actually lift the plate
Again adjust it so easily for that we have our cord here in front that means I will put it o
She came up to the string which I had naturally measured parallel to the house beforehand
So then I have the plate lying here now with strong hits I then bring it into place
At the height also check the cord here to make sure it ends neatly and check it
Then also the plate that's next to it and then the whole thing already looks great
So it is completely warm and we also have a slight slope
So you see here comes the next segment we'll pull it twice
Remove the fitting allowance so twice 0.5 centimeters and then we have the mating piece very accurately
with the same joint pattern and the same joint size as we also have here in the surface
Work So guys you already see the second row we have a string along here
ense which represents the height for us and of course also the escape which has 41
Centimeters to the first row the back string can then be removed naturally because one obviously
en orient themselves on the rear row of plates Exactly we have here with a half plate
Started why We start at the top with a whole one which means we are in the half-stone bond
And then of course they always end up here specifically on our half-stone association
Then we proceed row by row exactly now we have to cut again here this one
They can be disconnected the plate then the next one as well yes and the same thing is waiting for us back there
Of course again but there's nothing we can do about it So people here's the disconnected plate the first one the one that was removed the one tha
Next it will end here on the half plate So guys I'll show you how
The man who usually mixes the concrete is mixing it himself this time because the concrete has become so expensive
From the work base 2.8 Reinkies and regular cement so you don't need to take track cement
because drainage concrete cannot bloom in that sense because it is capillary-breaking therefore
You don't need to take any drainage uh no grout So I'll now show you how to mix it and how to apply it
en it should have the right consistency Also we mix in a ratio of 4 to 1 Reinkies 2 to 8
Millimeter and cement should already be relatively moist not too moist of course so if the
If the cement is washed away from the individual gravel particles then it is definitely too wet but it must not be
Definitely not dry With the humidity you can still easily handle the plate
Integrate it you can tell when you tap it the plate sinks very smoothly
So guys you can see the result here we've basically set everything up except for the last corner and back there we need to cut a few more tiles
Yes it was two days of tiling for 15 square meters so with demolition
Digging out gravel installation also known as a small time value Yes I think we've made good progress now
Perfect conditions are there and we don't always have to push forward with the material then it goes
Of course it was also faster but yes it worked out pretty well I think So guys I just wanted to let you know
Show the glue this is pure Trass cement you know it from the other videos we made
Gradually beat in a creamy consistency and then add the PCI emulsion which is already prepared here
Improved mortar additive you can read all the properties on the internet The most importa
The property for us is that the adhesive remains pliable longer and yes it can then be stretched
easier to process That's why we include PCI emulsion you can expect approximately
a bag of Trass cement that is 25 kg of Trass cement 2.5 liters of PCI emulsion So folks we're done with the
We completed the leveling work yesterday so the area is now ready
sufficiently hardened so that we can apply it We apply it with the 2K patching mortar
from Heter Natural Stone where we also bought the slabs We chose the color here
Steingrau decided the records are a bit darker and with a light gray tone we then have
add another slight contrast Exactly it's very important now that we really make the area very
oroughly clean meaning that cement residues dust residues from grinding and soil residues must be removed because if
en we have an epoxy resin grout then this dust and dirt would
bonded to the plate through the epoxy resin and therefore it is extremely important that the surface
before it was really clean That means we will now first clean the area
Properly clean So people just a quick reminder about expansion joints I want to tell you about it
Naturally explain how it is now completely 100% and properly created We
ey will deviate a bit here but of course I will also explain that So the topic is
Expansion joints the standard requires that an expansion joint be placed every four meters in such a structure
Creating it is We have a depth of 2.45 meters for the terrace This means that here we reac
e four meters so we don't need to install an expansion joint either In width it looks like
Go ahead We have about 7 to 8 meters in width here and theoretically we need to
Install expansion joints Exactly and expansion joints must also be created all around at
Building So now I'll explain to you how we do it We won't be using any expansion joints here
Integrate We have here a highly elastic joint mortar and I can show you structures
Where experience then really shows after 10 15 years when there's no hair or anything like that You
You must always be able to take responsibility for it yourself Of course it must be up to your discretion
It's done or not I can tell you we've always done it this way and never had any problems
get But of course it is assumed that you also take a grout that really does a
It has certain flexibility If you take a concrete joint you must definitely install expansion joints
There's no way around it because concrete joints or cement joints aren't very flexible
like an epoxy joint The second reason we don't install expansion joints is I say
always when hairline cracks occur they are hairline cracks that may have an optical effect
Show minimal damage Otherwise nothing will go wrong in general The only thing
are the actual cracks Now imagine if you take
Would you rather buy the hairline crack or the expansion joint that looks exactly the same
It also doesn't look as nice as a hairline crack You have to decide for yourself
Decide what you want Also a expansion joint always looks different from the joint material
You have to have them because they have to be made with silicone Exactly and you can always see them
e difference And the hairline crack which can occur but does not have to occur That is why
Let's say we discuss this with the customers beforehand explain the issue to them and then make a decision
en in most cases in consultation with the customer the area without expansion jo
Create Yes and as I said experience has shown that there are really no defects
In the way we create the surfaces as part of the structure Then regarding the expansion joint
The proper expansion joint would not only represent the joint at the top that is the silicone seam
but rather the expansion joint must be completely through the drainage concrete or through the
Concrete must be carried out This is naturally very laborious and causes expansion joints
It is also very expensive and difficult to create As you can see we have here a half-stone bond If
we would have to completely remove the tiles
cut through and then also install a expansion joint in the concrete Then we would have a
Fully properly installed expansion joint Which is naturally again a major disadvantage you have a
A complete continuous seam and I think it looks absolutely not nice at all Okay people enough of that
Words now they are acting again We will now thoroughly clean the area all of it
Remove concrete residues and impurities from the surface of the plates
So folks a short but important detail It's very important that no glue from the tiles gets into the grout
They came when they were knocked down That's why you have seen it we are greasing the edges of the plates
Don't do it so that it can't happen That's very very important So no glue should be used
Stay in position then you have to pull them out and of course if there are any stones here or
Things like that are still in there so please take them out first Okay people we're mixing it up now
Mortar the mortar One component is already in the package so it is already mixed
We mix the second one on top Please stir the bucket first mix it up
So then add the second component and what is now very important is to really get everything right
Mix for six minutes say the manufacturers and we always stick to that
Then you have truly ensured that the mixture is evenly blended So people the mortar
It is mixed Now it is very important to moisten the area once again before proceeding Exactly through that
Cleaning is the coating while it's still wet but we really need to check now that the tile flooring is completely done
It's important to be careful otherwise stains can appear on the surface later So people you've seen it
The material is relatively quick to foam In such a case only a trowel and float will help
Press down manually This happens here in November it is relatively cold the plates are cold and then the material is pressed
It becomes stiff very quickly and is then no longer as homogeneous so you will definitely have to stir it again
It must be pressed in manually otherwise it won't reach the bottom of the joint Normally it flows
Truly beautiful to be clean when the temperatures are optimal around 15 to 20 degrees but even now
We have over 5 degrees for sure so absolutely no problem The material could already be available from
Process the grade but I would prefer it anyway when the temperatures are a bit higher then it goes
It's actually much easier So people after a few minutes let's say half an hour at leas
Wait then you can already sweep the area with this conut fiber broom here and then really
Clean so that nothing remains on the plates So then I'll show you once again
The ceramics we bought from Heter Naturstein are when it comes to ceramics also very good
set up and I would estimate that almost every second terrace we build today also has
Feinsteinzeug is being made Here is the plate which I will also link in the description size 80x40x2
So this is what it looks like from the back and the special thing we have here with the plate especially with ceramics
at she has an irregular edge and I find that makes her particularly beautiful and also tha
The glaze looks especially nice and a bit rustic Otherwise of course with ceramics
Always very sharp-edged and very straight so we install this plate very very often
Dark in color but really fits almost all materials and shades Good people what's new
Anything else important to note about ceramics Well I can only recommend one construction method and that is
It is the one we have applied here Fresh in fresh in drainage mortar with adhesive slurry
Glue the tiles in I know that many manufacturers also recommend laying ceramic tiles on gravel
You can but a basic rule: I would never personally lay two centimeters of ceramic in gravel Why
Yes it starts gradually and eventually it begins to wobble You have to land in an unfavorable position
Kante cut and then the splinting changes and the plate then no longer remains firmly fixed
sitzen The plates have a very low weight of their own so I would always recommend you to sit
Recommend securing the tiles properly and then also grouting them firmly What does not work at all and wha
Laying it in gravel and then cementing it is still done too often today
Also that really doesn't work The principle is always a solid joint and solid bedding so drainage concrete
Here and of course the other way around loose bedding loose jointing material You should keep this rule in mind
Always pay attention to the ceramic it's very very important otherwise it will go wrong later So guys I'll show you something quickly
Result You see freshly applied no residues on the plates It may happen that sometimes lig
Residues of epoxy resin on the plates remain after grouting I would always recommend
Recommend not to clean it The weather will take care of it With every tar remover
It naturally attacks the joint again Exactly as said the tiles are laid here in a half-stone bond
We also made an incision back there at the light shaft so that the half-stone appearance is maintained
It is and there as well The light shafts are given one must handle it technically in terms of height
orient This creates two small ramps leading to the entrance where the slabs then slope slightly
They have been used but also in the optics that is in the viewer's direction or joint optics of the main terrace
So the final step at the terrace We will now attach another wedge here
Concrete chisels very narrow Yes they also stabilize a bit more but we
ave now poured the concrete the drainage concrete here straight and will pour concrete here w
Apply a 0.8 grain texture This means it will be tight again so nothing can take root
That's why we will definitely make a hole here so that plant roots can also reach there later
No way down Alternatively one could also place a curb here
Yes then a big thank you for watching If you have any questions
If you have any questions on the topic feel free to use the comment function so everyone can benefit
I try to answer questions whenever possible Exactly feel free to check my page
Visit the website at www florenz-gartenwelt de or my Instagram account Feel free to check them out
pass by Heter Natural Stone they have these beautiful ceramic tiles in their selection and of course
As the name suggests also very very many beautiful natural stones Yes and then another note
Next year my shop will go online and you'll be able to find it on my website
Among other things you'll then be able to buy this bucket You can get it already now
By simply sending me an email we can take care of everything In that bucket there is
I have put together a set of tools that you need to carry out such projects as for example
Example of this here to realize For example the soft hammer the Simplex 60 from Halder
We also have the Superkrafthammer for setting wire nails also from the company Halder
Yes I packed the level from the company Stabiler Then small tools like a conut
A tape measure a pencil for carpenters you always need them
Also from the company Halder the two items Yes and for each project one needs a mason
Laces I brought two rolls with me and then a trowel and a float which you always use
It is needed Everything then comes in the sturdy bucket The crane was it so that really is some
PVC very durable If someone wants one I still have a few left
Lager I've already sold many through Instagram Just send me an email I'd be happy
And now it's also from me I wish you a pleasant time first This year will be o
In any case there will be a video from me as well and a giveaway So stay tuned
I've managed to get some really cool sponsors for this one Yes and exactly
Then I say until then and stay healthy and lively