Remodeling the master bathroom / Oppussing av bad

Remodeling the master bathroom / Oppussing av bad

R
4 Video Views·Dec 7, 2022

So time for the master/upstairs bathroom. This was a big undertaking, it took a lot longer than I thought.. took about 3,5 months to complete, some of it due to waiting on the bathtub and some other stuff to arrive, but this was a lot of work. I think the end-result looks very nice, and It came out looking exactly as I designed it in sketchup.

Walls are waterproof bathroom panels from Fibo Trespo.

THIS IS NOT A "HOW TO" :) I know that the tiling isn't perfect