Xác định bảng dữ liệu điều chỉnh giá hợp đồng (bảng tỷ trọng a b c d)

Định giá Xây dựng Channel
49 followers
513 Video Views·Nov 10, 2022
Xác định bảng dữ liệu điều chỉnh giá hợp đồng (bảng tỷ trọng a b c d) theo phương pháp hệ số giá Pn (chỉ sô giá) .
- Bài viết thể hiện quan điểm của tác giả.
Link tài liêụ: https://www.mediafire.com/file/od05upmzpemwvv4/X%25C3%25A1c_%25C4%2591%25E1%25BB%258Bnh_b%25E1%25BA%25A3ng_tr%25E1%25BB%258Dng_s%25C3%25B4_abcd.rar/file
Hello everyone colleagues
Today the construction channel valuation will return and exchange with you
About a matter related to contract price adjustment According to
the regulations of Circular 07-2016 of the Ministry of Construction
By using the price adjustment factor
method as you all know the adjustment
of the contract price according to the price adjustment factor method
It is an index used as a method of adjustment It is
very clear and it approaches international practices
And avoid disputes during the contract price adjustment process
Then in previous videos we helped you visualize the contract
price adjustment method How is the price adjustment like that
Then you already know about it
In this video we will guide you on how to identify the adjustment data table in the contract
That is the proportions A B C D in the price adjustment formula specified in Circular 07
Then the issue of how to define A B C D has not
yet been regulated by the competent authorities
A detailed explanation of the method in a text
A legally binding document or a guiding document
Then in practice the process of determining these adjustment coefficients A B C D
Then there are many different interpretations and ways to implement it
In my personal opinion this matter of identifying A B C D
Then it's just a relative matter
It's not exactly an absolute categorization
Then this matter of determining A B C D
The ideal conditions must be included in the tender documents
So that contractors during the bidding process can refer to it
And they will disclose the coefficients A B C D during the contract negotiation process
Then the topic of our discussion today is
The table for adjusting contract prices
Or I'll call it briefly the weight table
By the adjustment factor method specified in Circular 07
Then there is a construction contract for the building's structure
Of a dormitory priced at x1
I will use this as an example
Then the summary estimate table of it
Then as you can see on the screen here
Right Then
Then the estimate of this part of the contract package
It is approximately 11.4 billion
Then it's
Of course this estimate you have seen the other fees directly
Then I am taking an estimate
But it was approved before the time of Decree 32
It is still according to the mechanism
Operate according to the mechanism of Decree 112 and old Circular 04
Then there is a part of direct fees for others
Or the school of the mother-in-law
Then if you go to 06 then
you can discard it
into the general category then it won't have any effect either
Then I'll just take one example to make it easier for you to follow
Then here
A contract package
Then you can see here
Then a part of the body
Then it will have these structural works
Formwork works
Then the concrete
work very much work
I also don't feel like introducing
the estimation part here but based
on a sample estimate like this
A building construction contract
Approximately 7 to 8 floors
The value of the building construction contract is about 11 billion VND
Then from those estimates
Approved Or the construction estimate
Then it has this structure
And the problem we have is
To determine the ABCD ratio
To adjust the contract price according to the PN method
For this procurement package
And here
Then our problem is the adjustable items
It includes labor machinery and materials
Materials include cement sand gravel wood and steel
There are five types of building materials here
So let's find out how to determine the ABCD coefficient
Then from that estimate
Then you will easily with the
support of software tools that are
currently quite common and useful
you will have no difficulties
It will peel
off the panels Weight loss
The materials of this construction contract package
Then here I will also present the quantity table
You can see here that there are many of them
The package without a body doesn't have much material
Mainly cement sand stone steel wood sticks welding or some other materials
I have already listed them here
Then please note that our
task is only to adjust for five types of materials Right
Then we will be able to determine the value cost and
approved materials In the structure
table it is very easy here
The parts I have highlighted in
yellow gravel and so on have unit
prices and quantities We can easily
multiply to get the adjusted amount
Various types of wood various types of steel
Is that correct
Water sticks welding nails and clamps are not within the scope of adjustment
Concrete various types of ready-mix
Then we will analyze the cement sand and gravel from here
To determine the cost of various materials
Other materials we also do not adjust
So for this 11 billion contract package
Its total material cost is approximately 7.2 billion
But when the material is allowed to be adjusted
According to the assignment the assignment of the tender document
The assignment was negotiated between A and B
During the implementation process
Then the adjusted material is about 6.5
billion For these five types of materials
And the detailed value of each type
of material As shown in the table above
Cement is approximately 927
million adjusted sand is 215
million of course it will be the total from this side
Similarly we will have the
adjusted labor part It will also be easy
to peel off How much labor does it take
Add the labor rate into the unit price
Convert the unit price into total amount
The adjusted total labor cost
For this contract package approximately 1.5 billion
Similarly machine machine cost
Machine cost total machine cost
Then total cost total value
While the construction machine is adjusted
This contract package is approximately 208 million Thus we
have found the three most important
data points: machinery labor
And material costs
We will connect to the adjustment factor table
Let's go find the ABCD factor
Here you can easily see that it
refers to the direct cost part
materials labor and machinery I
connect it here meaning the part
This is the fixed cost section
The labor cost is 1
billion You have already
seen it right Then the
construction equipment cost
We have connected to 208 million
adjusted Similarly material costs
It is 6.5 billion including 927
million we have
connected to the sand
Stone wood steel
And we called them
the D1 D2 D3 D4 D5
Total adjusted D is 6.5
billion
Then our task now
will be very simple
From here we can easily
determine the adjusted cost items
Right it's the part of
materials labor and machinery
As the part that I
Red color above
Will be the adjusted part
Will be the total cost
Materials labor and equipment we just calculated
It is worth about 8.2 billion
VND Then the fixed part is very
simple It is the contract price
Or the construction estimate price
It is 11.4 billion
Except you see it's this red cow's tattoo
Except for the tattoo of this red cow
Then it's the fixed cost part
The A coefficients
Price adjustments are not allowed in
the contract Here right Then I will switch
to the horizontal table Then you will
find it easier to
follow Here I switch to
Then we connected to the
horizontal table this is the fixed
part which is 3.1 billion VND the labor part is 1.5 billion
The machine part is 208 million
And the material part is 6.5 billion
So we have obtained the part as
What are A B C D
And of course the sum of these four parts
Including both fixed and variable
It will be at the contract value of 11 billion of ours
Then please note
Circular 07
It is said that the fixed A is determined
In the corresponding adjustment table
it represents the unadjusted portion
It includes the contract advance amount
Exceeding the minimum advance payment
And the value of the unadjusted expense in the contract
The unadjusted portion of this contrac
Then you can understand
Some of the costs such as general expenses
Some materials are not adjusted such as welding
rods ground nails and water
Other types of materials
That is all except the adjusted parts
The remaining part is the fixed unadjusted portion
So we understand it that way
What about the person who exceeds
the minimum advance How do we
understand that Here I'll also
mention that we will also include you
Here you can see on the screen the Decree 37
which stipulates that for construction
contracts
The minimum advance payment is 10% for contracts over
50 billion 15% for contracts
between 10 and 50 billion
And 20% for construction contracts valued at
less than 10 billion VND
So for our contract here
It is worth 11.4 billion VND
Then it would be in between here
That means 10 50 billion and the allowed advance amount
The minimum of this is 15
This is 15 billion 15% Right Then I split
it into two cases to
determine the data table
The weight table is as follows
Case 1 in the case of an advance ratio
Less than the minimum advance level
Regulation Decree 37 means A and B
Whether or not this minimum advance provision is less than 15%
Is that correct
It is 15% meaning it does not exceed the
advance rate It is the same as the advance
rate Naturally there will be no lower amount
It is equal to the minimum advance rate
It is 15%
Then at that time the excess part above the minimum will not exist
There is no excess part above the minimum here
It means it is equal to 0 Then what would the ABCD weight coefficient be
Just now we determined the value
Then it's very simple it is
The proportion is easy to obtain as follows
It can be determined as a fixed part
Then it will be the fixed value divided by
The contract value is 11.4 billion
That is we have determined 27.6%
Labor portion
By the adjusted labor value
Divide by our contract price portion which is 13.51%
The machine part will be equal to the adjusted machine value
Divide by our contract price
Similarly the material will be equal
to the total value of the adjusted
material types divided by our contract
price and of course the total of
4 of the ones I colored
orange like this
will be 100% the sum of ABCD will be 1
That is our basic principle Of course here I can Based
on this adjustment
material I can further determine the proportion
Each type of material is adjusted in this material
cost and here it will also
be 100% what you see here
So
Then we will fill in the PN formula
Of ours here
Then
Then we will get our PN formula as follows
PN will be equal to A plus B
It is the labor portion multiplied by the variable portion
Of the labor cost of the labor rate
C is the proportion of construction equipment multiplied by
The modified index may be the
construction equipment price
D is the material multiplied by the change in
The material price index is correct isn't it
Then we can easily plug it into our
formula which will be PN at 27.6% is fixed
Thirteen and a half percent is the
worker one point eight three percent
is the machine and fifty seven point zero six percent is the material
It was easy for us to come up with the formula
Adjusting the price the remaining task is
Part L Part E Part M
Then we will determine it
according to the local price index
published or we will develop a price index for the project
Then I have already shown you in a previous video so you
can find it again on the
construction valuation video system
How to check and refer to the channels and their features
In the second case it is a situation where it will be specified as a case where the
advance rate exceeds the level
The minimum advance specified in paragraph 37
We just said that right
So I have summarized it as the contract price
Our amount is 11.4 billion
The minimum advance parameters
For this contract is 15%
Then we mentioned above
And suppose that AB refers to the capitalist and the contractor
The advance payment stipulated in this contract is 20%
A advances 20% to B
So the excess advance part will not be adjusted
according to the contract which is 20 but 5 is 5%
Then according to you 37
And you 07 this 5%
It must be in part A Right Part of
the fixed coefficient value It must be in this part
A which is the excess over the minimum In
principle like that
The fixed portion A that we identified above 27.6% must be
added by 5% because party A
has already advanced to party B
Exceeding 5% of the
minimum contract advance
Is the regulation in Article 37 correct
At that time the corresponding parts B C D
Then we will deduct 5%
And accordingly reduce the allocation into
The proportion of materials labor and machinery
These are just very simple arithmetic calculations
In this second case how will we calculate
The fixed cost
is 3.1 billion then
we divide it by the contract price
And also add 5%
The excess amount of the minimum advance in the contract
Is that right
At that time the fixed part we now have will be 32.6%
And higher than 5% compared to scenario 1
There are only 27.6% of them
Is that right So the workers
and the machines have to be
reduced to ensure the number
A B C D added together
It will definitely have to equal 1
Right
It is an unchanging principle of ours to ensure the operation
Then our worker will do it then what
will we do it's very easy I 've
already placed the formula here
and our nature will be equal
The adjusted labor value part is divided by the
contract price and of course
we will have to deduct 5%
The proportion of the labor value in this adjustment
In this
part Called
The adjusted part
Consists of
Labor
Plus machine
And the material cost
Subtract it
Right
So that it will be subtracted according to the proportion of contribution
Of each part of labor and material equipment
In this structure part right
Similarly like
the machine we
will use the machine's value
divided by the contract price
And reduce by 5%
The contribution of construction machinery
In this part
Labor plus machinery plus materials are adjusted
Similarly so is
The material you have
Is that right
Then it's very simple
I will hide it so it doesn't spread
Thus The case where
this contract
Is an advance of 20%
The amount exceeding the minimum is 5%
And regarding the regulation of the items
In the case of machine labor
material the adjusted
material target
as mentioned in
the problem what is our PN coefficient like That is
The fixed ratio
will be 32.6%
With 12.58% of labor
transformation 1.7%
of machine 53.12%
compared
to materials
And you can compare
it with the above
option Then the
parts the proportion
of materials labor machinery and the
materials it has already decreased
Have we already added
the 5% to the
fixed part
That would be the second
option Here is our plan
Actually the
adjustment formula
is not too complicated It
depends on each
specific case
and the minimum
advance part
And the part that is
regulated is the categories
The factors approved
price adjustments regulations
in the cloud
pool or negotiations in the
contract then one
can determine it
The weight table or
data table to serve
for contract price adjustment It can be
Only labor
Or only machinery
Or only materials
Or two of the three elements
Or depending on the type of materials
The problem statement
The file requires that
they submit a bid this bid package I only allow cement and
sand adjustments
For this contract package I only allow adjustments For
construction steel these factors
will be zero and may be more
Is that right Yes for this contract
package I will adjust all the categories
The types of materials in the contract package Then the story will be different
Then it will be very flexible
But generally speaking in principle
Then it will be like determining
You may refer to it
Just as I have just explained
And this article will certainly reflect
My point of view
Of construction channel
valuation And
I hope this exchange will be
helpful for
your professional
work Thank you very much for
your attention and follow-up