"Installing underground rough in plumbing under the cement slab before pouring the floor on the pole barn house. How to install sewer septic and drain lines before pouring concrete slab floor. This is how I did my pvc plumbing under the slab floor. It required a lot of digging and I hit a lot of rocks but I got it done. I decided to dig mine after drilling the holes because I figured I might run over the pipes if I did the plumbing first. You can do whichever order you like. Doing it this way made so I had to watch carefully where my holes were at all times. Well good luck with your projects. Let me know if you have any questions. https://amzn.to/2txjDFe here you can find the CST Berger laser transit. If you need a good transit. Awesome setup and very accurate!"
Hey guys, it's Paul from Smart Easy DIY.
Welcome to episode four of building my pole barn house.
Today what I'm gonna show you on the video here,
I just wanted to do a quick introduction
because there's not much of an introduction on the video.
I shot some footage just as I was doing the project
and so anyways, so I apologize in advance
for the shaky footage.
I didn't have the best quality camera.
I kind of just was doing it while I was building the house
and so there wasn't a whole lot of time.
But anyways, I wanted to show you what I did
for doing my plumbing under the cement slab
like when I was doing the pole barn house.
I couldn't find a lot of videos about the topic
about putting it under cement specifically
and so I had to dig down,
put my plumbing in under the ground.
I used four inch sewer pipe instead of three inch.
I just wanted to make sure there's no problems down the road
and then I used two inch for the other stuff, a lot of it.
Okay guys, real quick, wanted to do a tour here.
So I've been digging away and this is the ditch.
I'll turn around and show you the other view.
So if I turn around here, that's the septic tank
and that's where I got to start from
because that's set where it needs to be.
So to come up the house,
you have to do a quarter inch per foot slope
and you have to run this drain line.
You have to decide where it comes into the house.
What I did here is mine's coming in right up there
and there's a lot of rocks.
So I have to step down.
If you step down, you have to use
either 22 and a halfs or 45s
and I'm gonna step down to this level down here.
It's not as bad as it looks like from there.
I'll show you when it's all done.
Anyway, so I'm digging
and I got my first couple of pipes in.
You can see right there.
Started Friday night with the digging.
You can see it's a real mess here
but a buddy let me borrow a backhoe.
I think I mentioned that earlier.
So this is some plumbing I got done here.
So I wanted to give you a quick tour
starting down from the septic tank.
So Friday night, I started digging
and then I was up here Saturday some and Sunday some
and now this is Monday morning.
We have to go do something this afternoon.
So I took the day off work and did a half day.
Okay, so starting down here,
I think I showed this yesterday.
I'm gonna go up through here.
Anyways, and then here, we had to do a step,
a vertical step it's called in the plumbing.
And so what I did, I put a clean out right there
and then put a 22 and a half degrees going down.
So I put a clean out there
because we're gonna use that later.
Maybe I'll just cut it off later
wherever the ground needs to be.
This looks kind of shallow here
but we're gonna fill this in quite a lot so.
And then there's a sink drain up there
and it was easiest to come outside here
and tie in right there with a Y, four inch to two inch.
Then I came here.
This is a little more angles here than what I like
but it's what I had to do
because there's a big old rock right there in my way.
So I was able to just break enough rock to sneak past him.
So anyways, in there splits,
four inch is gonna go that way
which I'm gonna work on hopefully tomorrow.
And then this one's coming this way
and it's gonna come up here.
Then here's the master vanity gonna tie in here
and we're gonna turn, go here to the toilet.
And then there's a tub drain
and then this just goes right here.
It's gonna be a vent and clean out
coming up the wall right here.
Finally got my vent pipe done there.
So this whole bathroom's done
and I'm gonna go here and show you a quick,
this is what I do for layout.
You're probably wondering
how you get some of these plumbing layout.
Well, so since I lasted the video,
this line's coming down here
and there I'm winding off to go over to the bathroom vanity
and then right now I'm getting ready to do the toilet
which is right here.
So you can see here the way I did it.
There's two tape measures.
There's one there and one here.
And I have my drawing here.
Might not make much sense to you the way I have it here
but it's been scribbled on a lot.
Disregard that.
But basically what I did before
is I went over here and did this vent bathroom
I just showed you.
And then this is this line coming over
and this isn't exactly the scale.
This one's coming over here to the bathroom like this.
It was just easier to dig it that way
with the Y and stuff.
So the toilet's going right here.
So that's my layout.
Right now I'm doing my tape this way
and my tape this way.
So I got it figured out on my graph paper here.
Every square represents a foot.
So that's how I figured it out.
Anyways, and this might look a little hokey
with the boxes here supporting the tape
but I just did that so with these Fat Max tapes
you can span quite a distance.
I just did it to have it be approximately
the same level as the ground.
And then right here where the two tapes gonna meet
is where my toilet vent or my toilet pipe's coming up.
And it's close enough for what I want
because if I have to I can shove the wall a little bit
but I'm gonna get it really close.
And what I'm doing for my particular case
with being a pole building,
I just have my string set up here
and then I just set up and I level down
with the level to make sure I'm with my string.
So that's how I do it.
Okay, I wanted to show one more thing.
When we're plumbing under the floor here
how do you find what length to cut pipe
and all that stuff?
Well in this particular case it's pretty easy
because I have my Y here.
It's just sitting here on the ground
right in front of the last glued pipe.
And I know that I wanna head right for those tape measures
where they meet there.
And I know where this pipe wants to go.
I wanna hug the left side of the ditch
when I get up further.
So I had this pipe and I just kinda loosely stuck it in
part way in there.
You don't wanna stick it all the way
or these things are hard to get apart.
And then this one I loosely stuck a short piece of pipe
I have that's just a little short than what I need
but it gives me a good idea.
And so if I set this right here, line it right up
it tells me that I pretty much want those tight.
You see how it's pointing right at that tape measure there?
You can tweak it a tiny bit but not very much
so you wanna get it pretty close.
So what you would do then is you just measure right here
from right this edge where the bevel is
to this edge right here.
And so that's what you wanna make your piece.
So you know that's how far you want your Y to go forward
to get your angle right to hook on to the next thing.
So that's pretty much how you do it.
So hope that helps.