How Railroad Crossing Signals Work

From Occident To Orient
20 followers
146 Video Views·Oct 23, 2022
Hello again, rail fans.
A question that I've been getting frequently recently,
for some reason, is about railroad grade crossing signals.
Automatic signal activations.
How do they work?
How does the signal know when the train is there?
How does it know when the train is gone?
Well, I'm gonna give you the simple answer to this,
because frankly, it's the only one I got.
Long time ago, railroad engineers discovered
that they already had the means for automatic activation
of those devices in those two steel rails.
They realized that if they put an electric current
up one of the rails,
and then sent it back down the other rail,
that they had the means
for the automatic activation right there.
When the train came along with its steel wheels and axle,
and bridged those two rails, bridging that current,
it created a switch that could activate a device.
And so, the automatic grade crossing device was born.
It was probably, I don't know this for sure,
but it was probably Thomas Edison
and or George Westinghouse that had a hand in that.
They were the Bill Gates and Elon Musks of their day.
Now those were the early versions, the very simple versions.
In the decades and decades since then,
the devices have gotten much more sophisticated.
But let's start with those simple devices.
One of the oldest and most basic type
of crossing signal activation still in use
is the approach island system.
Here at the County Line Spur near Lakeland, Florida,
this local is crossing US Highway 92.
He was already on the crossing when I got there,
but you can still see how this works.
It's a conventional track circuit system
of the most basic design.
It doesn't even have approach circuits
because it really doesn't need them.
Trains always back into this spur
because it's a dead end down there.
So they're always going 10 miles an hour or less,
not much approach time needed.
The train simply pulls up to the crossing
and stops while the signals activate.
When the gates go down, they move on across.
Folks often speculate that it's some kind of weight sensor
or seismic detector that triggers the signals,
but it's far simpler than that.
The steel wheels and axle actually bridge the rails
and complete an electric circuit.
In this example, that insulated joiner bar
with the white paint actually begins
the island circuit of the crossing.
When the first set of wheels hit that, the signals activate.
The island circuit is that stretch of rail
which goes across the roadway.
It's called that because the approach circuits
extend way out from the crossing on either side
and the island circuit is in the middle, hence the name.
Across the road, another insulated joint ends the circuit.
Watch as the front wheel of the locomotive
clears the electric contacts on the far side.
Almost the instant he gets off that small island circuit,
the gates come up and the lights go off.
Again, this is a conventional track circuit
and is the oldest and most basic type
of crossing activation system.
Much newer technology includes the motion detector.
At Hawthorne, Florida on CSX's S line,
the Johnson Street Crossing is a motion detector system.
When the train passes into the detector circuit,
the wheels shunt the two rails
and begin changing the impedance
of a coded circuit in the track.
The electronics in the signal box
trigger the crossing lights and bells.
As the train gets closer, the impedance keeps changing,
letting the software in the signal box know
that the train is coming toward the crossing
and to keep flashing and ringing.
If Q453 were to stop before the crossing,
the motion detector would sense
that the track impedance stopped changing
and after a number of seconds,
it would turn off the signals.
Federal Highway Administration recommends
a 20-second lead time for signals to activate
before the train arrives,
but it's common practice
to set crossing circuits at 30 seconds.
This particular installation is set
for 45-mile-an-hour trains track speed through here,
but 453 isn't running more than about 25,
so the lights activated 56 seconds in advance of the train.
But Johnson Street is clearly not a busy crossing,
so no problem.
An improvement to the motion detector
is the speed predictor.
This is firmware that takes the motion detector information
and uses it to calculate the speed of the approaching train.
With this system, the speed of the train doesn't matter.
The predictor begins figuring that speed
versus the length of the circuit
and produces a trigger time
that's roughly 30 seconds to the crossing.
At Magnolia Street in Ocala,
Q453 activated the crossing signals
and hit the pavement 32 seconds later.
Next, we'll look at the motion detector
and how it keeps highway traffic moving.
The advantage of the motion detector system
is illustrated in this shot I caught in Rebecca, Georgia.
The northbound freight is in the siding
waiting for an approaching southbound.
He's pulled up just short of the highway crossing.
In a few seconds, the motion detector senses
he's not moving and deactivates the crossing signals.
This saves a lot of anger
from drivers trying to get across.
At Deerfield Beach, Florida,
on the ex-seaboard mainline into Miami
is an excellent example of the speed predictor
and motion detector at work.
The Deerfield station is right next to a big crossing.
Hillsboro Boulevard is six lanes in each direction.
Lots of traffic.
Crossing signal connections to the track
are well marked with that orange paint
so we can see where they are.
As we look way down south,
we see a clear signal on the number one track
at Parker Crossover.
There's a southbound somewhere in the block.
At 8.37 a.m., Tri-Rail arrives,
triggering the signals one minute
before it hits the crossing.
The four quadrant gates are fully lowered 32 seconds
before he's on the crossing.
Tri-Rail is commuter service between the Miami airport
and Mangonia Park in West Palm Beach.
Now watch as he clears the roadway.
Less than four seconds off the island circuit
and the gates start coming up.
Even though he's clearly still
on the southern approach circuit,
the signals don't care because this side was disengaged
when the train hit the northern approach circuit first.
It works the same for trains
At 09.06, Amtrak 98 appears from the south.
He originates at High Aliyah Yard in Miami
and runs to New York City.
He's rolling down into his third stop
on that journey, Deerfield Beach.
In a move that's been measured and perfected,
the Silver Meteor glides down to a stop
just before he gets on the Hillsborough Boulevard
crossing circuit.
They rely on the motion detector to go to work here.
When Amtrak 98 stops rolling,
the impedance of the coded signal in the rails
stop changing.
The motion detector is set up to process this
and after a number of seconds,
it begins shutting off the crossing signals
so drivers won't become irate
while the train is standing in the station.
South Florida is a busy territory
and blocking a roadway like Hillsborough Boulevard
for even five minutes can cause big problems.
It takes a few minutes on this Sunday morning
to get everybody on board,
but when the engineer gets the depart order
from the conductor, he uses his DTMF keypad
to transmit a set of tones on the radio
that reactivates the crossing lines.
This avoids the need of having to play chicken
with the automatic crossing system
by rolling up slowly on the highway,
hoping for an activation.
It doesn't always work soon enough
when a train is this close.
Today, 98 has a GE-8 locomotive dead in tow,
one of the few that Amtrak still owns.
I thought it was brought to Hialeah
for servicing from somewhere up north,
but I'm only guessing at that.
All this algebra and decision-making
happens in the little silver houses
you see next to crossings,
commonly called signal bungalows.
These structures hold all the electronics
that control each crossing.
They even house backup batteries
to keep the signals working through a power failure.
Traditionally, these batteries lived outside
in concrete boxes next to the bungalows
back when they were older lead-acid type.
It's all in one house now.
At Gay Road in Lakeland, there are no crossing signals.
In fact, the crossing was closed a few years ago,
but I'm here on this bright day
before St. Patrick's Day 2021
because Q453 is showing off some special power.
The 3194 is CSX's spirit of law enforcement engine.
The ES44AH honors police, fire, and EMTs
in a blazing blue, black, and white design.
At mid-train, actually toward the bottom end,
was a distributed power unit,
another CSX spirit locomotive.
The 911 is also an ES44AH
and also honors first responders,
but it's a little bit more sophisticated.
But with a decidedly more firefighter design.
Today's 453 has the usual miscellaneous traffic on top
and auto racks on the bottom.
453 is on track number one.
The southbound number two track signal
has gone to approach.
Proceed prepared to stop at the next signal ahead.
That's for 0710, a local moving down
to work customers at Plant City.
He's getting the approach signal
because 453 is on the crossover switch
and the siding switch at Winston Pass,
which is the next signal ahead.
0710 will pull to the south end and tuck in there
until Q453 clears up,
which will be quite a few minutes this morning.
He's making a move called pulling by and backing in.
That means just what it says,
pulling past the entire Winston Y plant,
then backing his entire train, 9,600 feet of it,
around the south leg of the Y
and into Winston Yard.
I move around to the stem of the Winston Y
where 453 will be coming in.
Old Tampa Highway is listed
as a conventional crossing circuit
with an approach island approach setup.
Come around this curve.
Now we've got to restrict.
The signals activate 52 seconds
before he arrives at the crossing
because this kind of setup doesn't know
how fast he's moving.
It simply turns on when he covers the approach circuit
and stays on until he's clear of the island circuit.
That's the rails in the crossing
and a few feet out either side.
At this point, he's stopping
because the conductor way down on the bottom
of this 9,600 foot train has to line a yard switch
before they shove all the way in.
Takes about a minute and a half.
While 453 has stopped on the crossing,
the signals stay activated.
As long as he's on that island circuit in the roadway,
the lights will flash and the gates will stay down.
Those white chalk drawings on cars aren't graffiti.
It's message art, usually from car inspectors
to one another in different terminals.
My dear departed friend, Crick Hatch in Folkestone, Georgia,
first told me about this messaging.
He had hundreds of photos of this stuff.
Apparently the practice is still alive and well.
This is not message art.
It's tagger graffiti.
Much less talent involved here.
453 gets rolling again
and we get one more look at that lead engine.
When he clears the pavement,
that conventional crossing circuit
doesn't give me much time to ski-daddle.
Almost the second he's off the island circuit,
the gates start coming up
and those drivers aren't waiting for me.
Well, that's the simplified version
of how railroad grade crossing signals are activated.
I hope that answered some of your questions.
There's much more detail to how these things work.
It involves microprocessors and special sensors
and positive train control.
But those that we did here today are kind of the basics.
Please hit the like button if you like this video.
Subscribe to the channel if you haven't already done that.
Hit the bell down there to be notified
when I do post a new video.
Write your comments in the comments section below.
I try to read all those and I reply to as many as I can.
Same with the email.
Email me at railfandanny at gmail.com.
I read every one of those
and reply to as many of those as I can.
So, let's plan to meet up again somewhere soon,
somewhere out there on the high iron.
And until we do, this is Danny Harmon, out.
