CES 2027 opens on January 6, 2027 in Las Vegas. As of today, November 4, that is about nine weeks away. If your company has never exhibited in Vegas, that number matters more than any other in your plan.
Shipping windows, labor orders, show-site services and booth production all run on fixed deadlines, and most of them fall within the next few weeks. Companies that treat CES like
an ordinary trade show often discover this too late. They pay rush fees, settle for a smaller booth than they wanted, or arrive with a display that was never designed for the venue.
This CES exhibitor guide is written for first-time exhibitors. It covers the logistics that catch newcomers off guard, answers the question how much does a CES booth cost, and gives you a countdown plan you can start using today. It draws on how trade show booth projects are planned and built in Las Vegas, and it flags what you should confirm directly with show management, because rules and rates change.
What first-time CES exhibitors get wrong
CES is large, spread across several venues and unforgiving about timing. These are the mistakes we see most often from companies new to Las Vegas.
Treating the booth space fee as the budget
The space rental is only the starting line. Build, graphics, shipping, installation labor, electrical, internet, furniture, travel and staffing all sit on top of it. Newcomers often budget for the space and discover the rest later.
Starting the booth design too late
A custom structure needs time for concept approval, engineering, fabrication, graphics production and freight. With about nine weeks left, a large custom build is already tight. Smaller footprints and custom-modular or rental exhibits are often the realistic path for first-timers who start now.
Underestimating Las Vegas logistics
Show-site services, material handling, union and venue labor rules, freight schedules and hotel availability all tighten around CES week. Ordering late usually means paying more and getting fewer choices.
Designing for a brochure, not a crowded hall
Attendees move quickly through a very large show. A booth that needs a minute of reading to explain itself loses the visitor. Clear messaging, a strong focal point and a place to talk matter more than packing in features.
Having no plan for the leads
Without a lead-capture process, qualification questions and a follow-up schedule, the best booth in the hall still produces a pile of business cards. Decide how you will record, score and follow up before the show opens.
How much does a CES booth cost?
The honest answer is that how much does a CES booth cost depends on size, location, build type and how many services you order. Start with the space fee, which is the only fixed number.
For CES 2026, the show listed open exhibit space at $46.50 per square foot for CTA members and $51.50 for non-members. At those rates, a 10x10 space (100 sq ft) works out to roughly $4,650 for members and $5,150 for non-members. CES 2027 rates may differ, so confirm current pricing with show management before you budget.
| Cost item | What drives the number |
|---|---|
| Exhibit space | Square footage, location and CTA membership status |
| Booth design and fabrication, or rental | Size, structure, materials and whether it is custom, modular or rented |
| Graphics | Panel count, size and print material |
| Lighting, AV and furniture | Rental or purchase, and the amount of technology you demo |
| Shipping and drayage | Weight, distance and how early you ship |
| Installation and dismantle labor | Crew size, hours and venue labor rules |
| Show-site services | Electrical, internet, cleaning and rigging, ordered through the show or its contractors |
| Travel, hotels and staffing | Team size and how close to the show you book |
| Marketing and lead capture | Pre-show outreach, scanners, giveaways and follow-up tools |
As a rough planning guide, one 2026 cost guide puts an all-in 10x10 at a tier-1 show such as CES at $15,000 to $40,000 or more, with the booth fee being only part of that. Treat this as a starting range, not a quote. Your real number depends on your design and your choices.
Ways to control cost without weakening the booth
- Choose the right size. A well-designed 10x10 or 10x20 often outperforms a larger, poorly planned space.
- Consider custom-modular or rental exhibits. They shorten the lead time and reduce the upfront spend compared with a fully custom build.
- Order early. Show-site services, freight and labor cost more as deadlines pass.
- Design for reuse. A booth you can reconfigure serves several shows, which lowers your cost per event.
- Get itemized quotes. Ask every vendor what is included and what is billed separately, then compare like with like.
Your nine-week countdown to CES 2027
With the show opening January 6, every week counts. Use this plan as a working schedule, and replace its general windows with the exact deadlines in the CES exhibitor manual.
- This week (November 2 to 8): lock your scope. Confirm your space, size and budget. Decide whether you need a custom, custom-modular or rental exhibit. Brief a trade show booth design and build partner now. Every day of delay shortens production time.
- November 9 to 22: approve the design. Finalize layout, message and graphics direction. Review renderings, confirm the technical drawings and check them against venue rules on height, flooring and electrical.
- November 23 to December 6: start production and place orders. Begin fabrication, produce graphics and order show-site services such as electrical, internet and labor. Early orders generally cost less than late ones.
- December 7 to 20: ship and prepare. Send crates on the schedule given by your freight provider and the show. Finalize staffing, travel, hotels and the lead-capture process. Train your team on the pitch and the demo.
- December 21 to January 4: confirm everything. Track freight, reconfirm installation times, check graphics proofs and brief your team on booth roles and daily goals.
- January 5 to 9: install, exhibit, dismantle. Supervise the build, test every screen and demo, then run the show with a clear daily routine. Start follow-up while conversations are still fresh.
If your timeline is already behind, tell your design partner on the first call. A good team can tell you what is still realistic, which items need rush handling and what to simplify so the booth is ready on time.
Las Vegas logistics every first-timer should know
- Multiple venues. CES spreads across the Las Vegas Convention Center and other Las Vegas venues. Confirm where your space sits and plan your team's movement between sites.
- Trade-only access. CES is a trade event, so plan your invitations and meetings around qualified buyers, partners and press.
- Freight and drayage. Material handling is tightly scheduled. Know your freight carrier's deadline and the show's advance-warehouse and direct-to-show dates.
- Labor rules. Installation and dismantle may involve venue-approved labor. Check what your team may do themselves.
- Hotels and transport. Rooms and rides tighten around show week. Book early and allow extra time between venues.
- Show-site services. Electrical, internet and rigging are ordered in advance through the show. Late orders cost more.
Where CES fits on the trade show calendar USA
CES opens the year on the trade show calendar USA. It is one of the first major shows of January, so exhibitors have less planning time after the holidays than they do for events later in the year. That is why fourth-quarter planning is critical for a January show.
If CES is your first show in Las Vegas, treat it as the start of a longer program. Look at the rest of your trade show calendar USA early and decide which events match your audience. A booth that can be reconfigured for different floor sizes lets you reuse the investment at later shows.
First-time CES exhibitor checklist
- Confirm your space, size, location and the current CES rate, including CTA membership status.
- Set a total budget that includes build, shipping, labor, services, travel and staffing, not only the space fee.
- Choose a booth route that fits your timeline: custom, custom-modular or rental.
- Brief your design and build partner and approve the concept within the next two weeks.
- Read the CES exhibitor manual and mark every deadline on one calendar.
- Order electrical, internet and other show-site services early.
- Book freight, installation and dismantle labor.
- Book hotels, flights and ground transport for your team.
- Set up lead capture, qualification questions and a follow-up plan.
- Train staff on the pitch, demo and daily goals.
- Pre-book meetings with key buyers and partners before you land.
Frequently asked questions
How much does a CES booth cost for a first-time exhibitor?
The space fee for a 10x10 at CES 2026 rates was roughly $4,650 to $5,150, depending on CTA membership. Build, graphics, shipping, labor, services and travel come on top, so total budgets are far higher. Confirm CES 2027 rates directly with show management.
Is it too late to build a custom booth for CES 2027?
Not necessarily for smaller footprints, but the window is tight. Custom-modular and rental exhibits are often more realistic for a first-time exhibitor starting now. Ask your design partner what can be delivered by your install date.
Do I need to be a CTA member to exhibit?
Membership is not described as a requirement in the CES 2026 rate sheet. It does change the space rate and some benefits, so compare the cost of membership with the savings before you decide.
What should I ship early?
Booth structure, graphics and heavy items should ship on the freight schedule. Keep demo devices and critical items in a plan you can verify, and ship backups if the demo depends on them.
When should I plan for my next show?
As soon as CES is underway. Use what you learn about traffic, leads and booth performance to plan the next event, ideally with a booth that can be reconfigured.
Final thoughts
CES 2027 is about nine weeks away, and the companies that do well will be the ones that treat logistics as part of the strategy. Set your scope this week, choose a booth route that fits your timeline, order show-site services early and plan the lead follow-up before the doors open. The sooner the design conversation starts, the more options you keep.