From Concept to Commissioning: How Pharma Projects Are Executed

Introduction

Pharmaceutical capital projects-such as building a new facility or expanding production lines-have multi-disciplinary complexity, tight regulatory demands, and high stakes. Going from concept to commissioning requires strong project governance, technical rigor, and careful change management. This blog breaks down the phases, challenges, and best practices for executing pharma projects.

  
 A close-up of pills on a conveyor belt

AI-generated content may be incorrect.

 

 

 

 

 

 

 

 

 


 


Phase 1: Project Initiation & Feasibility

  • Business case & ROI: Define objectives, market, scale, investment, payback.
  • Risk assessment: Technical risks, regulatory shifts, market risk.
  • Stakeholder alignment: Management, operations, quality, regulatory, finance.
  • Master schedule & milestones: Conceptual, preliminary, detailed, construction, validation.

Phase 2: Conceptual & Basic Engineering

  • Process Flow Diagrams (PFDs)
  • Mass & energy balance
  • Preliminary utility sizing
  • Basic layout & zoning
  • Identify critical systems: HVAC, water, steam, control systems
  • Estimate CapEx

Phase 3: Detailed Engineering & Design

  • Civil and structural engineering
  • Architectural and interior finishes
  • Mechanical, electrical, plumbing (MEP)
  • HVAC & cleanroom design
  • Piping & instrumentation (P&IDs)
  • Control system architecture (DCS/SCADA/PLC)
  • Safety & automation interlocks
  • Construction detailing, material specs

Phase 4: Procurement & Vendor Management

  • Equipment procurement: RFQs, bid evaluation, vendor audits
  • Long-lead items: HVAC units, GMP equipment
  • Spare parts strategy
  • Expediting & logistics
  • Quality assurance / inspection during delivery
  • Interface management: ensure utility compatibility with equipment vendors

Phase 5: Construction & Installation

  • Civil work, structural, finishing
  • Installation of utilities & ducts
  • Equipment erection
  • Piping, cable trays, tie-ins
  • QA / QC inspections at each stage
  • As-built drawings
  • Cable & instrument loop checks

Phase 6: Precommissioning & Commissioning

  • Utility checks, pressure tests, leak tests
  • Dry run of instruments & control loops
  • Flow checks, balancing, HVAC commissioning
  • Cleaning, sanitization, microbiological baseline
  • Trial batches / pilot runs
  • Validation runs (IQ/OQ/PQ)
  • Regulatory inspections before release

Phase 7: Handover & Start-up

  • Turnover to operations & quality teams
  • SOPs, training, site familiarization
  • Monitoring, trending, early troubleshooting
  • Performance acceptance
  • Post-commissioning audits

Phase 8: Post‑Project Support & Continuous Improvement

  • Stabilization period: typically, 6–12 months for process tuning
  • Lessons learned / project closeout
  • Change control for future improvements
  • Periodic audits & revalidation

Key Success Factors & Pitfalls

  • Integrated project team: include quality, regulatory early
  • Clear scope & change control: changes late in the project cost heavily
  • Quality in design & construction: e.g. weld quality, cleaning access
  • Risk mitigation & contingency planning
  • Strong documentation culture from day one
  • Vendor management & coordination
  • Commissioning buffer time: avoid rushing validation
  • Change control & training plans ready early

Conclusion

Executing pharmaceutical projects successfully demands not just engineering prowess, but disciplined project governance, regulatory foresight, and seamless integration across functions. By following phased execution, fostering cross-disciplinary collaboration, and preparing for surprises, you increase chances for a smooth and compliant commissioning.

Adroitix Engineering, a leading Pharma engineering consulting firm in India, offers end-to-end solutions for pharmaceutical facility design, process engineering, and regulatory compliance. With expertise in GMP, HVAC, cleanroom, and utility systems, Adroitix ensures innovative, efficient, and compliant project execution for OSD, injectables, API, and biotech facilities, helping clients achieve global standards in quality and performance.